# The A1 Birtley to Coal House Development Consent Order 2021, Paragraph

Extent: E+W+S

With Work Nos. 4a and 4b including—
(i) construction of new highway with associated embankments, ground improvements, drainage facilities and roadside furniture;
(ii) the provision of a hardened central reserve with a rigid concrete barrier or steel step barrier dividing the southbound and northbound carriageways;
(iii) installation of lighting columns in the verge;
(iv) the construction of advanced directional gantry signs, including sign foundations and sign structures;
(v) demolition of existing verge mounted road signs and installation of replacement new road signs including sign foundations, sign structure, signs, signals, sign illumination, control cabinets, power and communication cable connections;
(vi) treatment of underground historical mine workings to reduce the risk of ground instability to include drilling and grouting and/or installation of other protection measures;
(vii) landscaping;
(viii) relocation of existing internally illuminated tactical variable message sign within verge with associated ducting and reinstallation of existing CCTV in its current position; and
(ix) associated utility works and diversions within the highway verge of each carriageway;

---
Source: https://www.legislation.gov.uk/uksi/2021/74/schedule/1/paragraph/wrapper11n1 (the official version)
Page: https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021/schedule-1/paragraph-wrapper11n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

