# The A1 Birtley to Coal House Development Consent Order 2021, Schedule 10: SCHEDULED MONUMENTS

Extent: E+W+S

(1) Type of monument
(2) Work to be carried out
(3) Relevant part of the authorised development
Bowes Railway Scheduled Monument (1003723), a partly preserved standard gauge rope haulage railway with associated structures and apparatus. Included within the monument are the colliery and railway workshops which comprised the former Springwell Colliery.
The extension of the north side of the underpass requiring the extension of the corrugated metal structure and the demolition of stone retaining walls (up to a maximum of 17 metres in length) on either side of the former trackbed of the Bowes Railway. Works will include the excavation of two foundation trenches, each 15-17m in length, the insertion of piles at every 1m within the trenches, construction of the tunnel, repairs to the scheduled monument equal to the length of the retaining walls to be removed, insertion of drainage, access on to the monument during construction from site compounds, access after construction for public right of way and bridleway access and the location and fixing of an interpretation board.
Work No. 19

---
Source: https://www.legislation.gov.uk/uksi/2021/74/schedule/10 (the official version)
Page: https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021/schedule-10
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.