  "url": "https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021/schedule-6",
  "json_url": "https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021/schedule-6.json",
  "legislation": "uksi/2021/74",
  "legislation_title": "The A1 Birtley to Coal House Development Consent Order 2021",
  "legislation_url": "https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021",
  "path": "schedule/6",
  "kind": "schedule",
  "number": "6",
  "heading": "LAND IN RESPECT OF WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED",
  "text": "(1) Plot Reference Number shown on Land Plan\n(2) Purpose for which rights over land may be acquired\n(3) Relevant part of the authorised development\nLand Plans – Sheet 2\n2/2\nConstruction of retaining wall, new/relocation of existing ADS signs, upgrading of road lighting (including rights for access and maintenance).\nWork Nos. 1a and 3a\nLand Plans – Sheet 3\n3/1\nConstruction of retaining wall, new/relocation of existing ADS signs, upgrading of road lighting (including rights for access and maintenance).\nWork Nos. 1a and 3a\n3/3e\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct and maintain works to junction 67 (Coal House) northbound on slip road. Rights to construct and retain grouting works under land and maintenance.\nWork Nos. 1b and 3d\n3/3f\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct and maintain works to junction 67 (Coal House) northbound on slip road. Rights to construct and retain grouting works under land.\nWork Nos. 2 and 3d\n3/3g\nNew right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side) and for grouting works on the land underneath the proposed new\nstructure.\nWork Nos. 2 and 3d\n3/3h\nNew right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up\nto 15m either side) and for grouting works on the land underneath the proposed new structure.\nWork Nos. 2 and 3a\n3/3i\nNew right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side). Rights to construct and retain grouting works under land.\nWork Nos. 2 and 3a\n3/3z\nNew right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side). Grouting works under land.\nWork Nos. 2, 3c and 3d\n3/3dd\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.\nWork Nos. 1b, 2, 3c and 3d\n3/3ff\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team.\nRequired for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.\nWork Nos. 2 and 3c\n3/3gg\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Rights to construct and retain grouting works under land.\nWork Nos. 2 and 3b\n3/3hh\nNew right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side) and for grouting works on the land\nunderneath the proposed new structure.\nWork Nos. 2 and 3b\n3/3ll\nNew right to construct, operate, access and maintain a private maintenance access road on land adjacent to Lamesley Road and extending to land adjacent to south side of the proposed Allerdene Bridge and the East Coast Main Line for the benefit of Network Rail, Highways England and Northern Gas Networks Ltd.\nWork No. 11\n3/3mm\nRequired for diversion of existing Northern Gas Networks pipelines. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.\nWork Nos. 3c, 13 and 14\n3/3pp, 3/3qq, 3/3tt\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Rights to construct and retain grouting works under land.\nWork Nos. 1a and 3b\n3/3ww\nRequired to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment, and for installation and retention of grouting works on the land underneath the proposed new structure.\nWork Nos. 5a, 5b and 23\n3/3yy\nNew right to demolish the existing Allerdene Bridge and construct, operate, access and maintain a replacement offline Allerdene Bridge structure.\nWork Nos. 5a, 5b and 21\n3/3aaa\nRequired for proposed Northumbrian Water pipeline diversion. Rights to construct and retain grouting works under land.\nWork Nos. 4b, 5a, and 22\n3/3hhh\nNew right to access, operate, make alterations to and maintain the existing drainage outlet pipeline.\nWork No. 6a\n3/3kkk\nRequired for access and to construct proposed highway and associated embankment. Rights to construct and retain grouting works under land.\nWork Nos. 6a and 7a\n3/3lll\nNew right to access, operate, make alterations to and maintain the existing drainage outlet pipeline. Rights to construct and retain grouting works under land.\nWork Nos. 6a and 7a\n3/3nnn\nRequired for access and to construct proposed highway and associated embankment. Required to alter existing drainage outlets. Rights to construct and retain grouting works under land.\nWork Nos. 6a and 7a\n3/4a, 3/4b\nNew right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side) and for grouting works on the land underneath the proposed new\nstructure.\nWork Nos. 1a, 1b and 2\n3/4q\nRequired to access, maintain and alter existing drainage outlet and ditch and to access the main highway works. Rights to construct and retain grouting works under land.\nWork No. 6b\n3/6b\nNew right to construct, operate, access and maintain a private maintenance access road on land adjacent to Lamesley Road and extending to land adjacent to south side of the proposed Allerdene Bridge and the East Coast Main Line for the benefit of Network Rail, Highways England and Northern Gas Networks Ltd.\nWork No. 11\n3/6d\nRequired for diversion of existing Northern Gas Networks pipelines. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.\nWork Nos. 9, 13, 14 and 15\n3/6f\nRequired for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway. Rights to construct and retain grouting works under land.\nWork Nos. 10, 14 and 15\n3/6k\nRequired for construction compound. Rights to construct and retain grouting works under land.\nN/A\n3/6l\nNew right to access and maintain Allerdene culvert and drainage ditch.\nWork No. 20\n3/10d\nNew right to demolish the existing Allerdene Bridge and construct, operate, access and maintain a replacement offline Allerdene Bridge structure and for installation and retention of grouting works on the land.\nWork Nos. 5a, 5b and 23\n3/10g, 3/12d, 3/12f\nNew right to construct, operate, access and maintain a replacement offline Allerdene Bridge structure and for grouting works on the land underneath the proposed new\nstructure.\nWork No. 5a\n3/10e, 3/10f, 3/12c, 3/12e\nNew right to operate, access and maintain a replacement offline Allerdene Bridge structure and for installation and retention of grouting works on the land.\nWork No. 5a\n3/10h\nNew right to construct, operate, access and maintain a replacement offline Allerdene Bridge structure, associated Overhead Line Equipment and for installation and retentions of grouting works on the land.\nWork Nos. 4a, 4b, 5a, 5b and 23\n3/12b\nRequired to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment, and for installation and retention of grouting works on the land.\nWork Nos. 4a, 4b, 5a, 5b and 23\nLand Plans – Sheet 4\n4/2d\nNew right to extend the Longbank Bridleway Underpass and operate, access and maintain the structure and associated equipment. Grouting works under land.\nWork Nos. 6a and 19\n4/3b\nRequired for utility diversions and associated works within junction 66 (Eighton Lodge) Roundabout. Rights to construct and retain grouting works under land.\nWork No. 6a\n4/3q, 4/4b\nRequired for the construction compound at junction 66 (Eighton Lodge) and associated access. Rights to construct and retain grouting works under land.\nN/A\n4/6b\nRequired to construct the extension of Longbank Bridleway Underpass, including temporary working space and diversions for pedestrians during the Underpass closure. Rights to construct and retain grouting works under land.\nWork Nos. 6a and 19\n4/7b, 4/7e\nRequired to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge. Rights to construct and retain grouting works under land.\nWork No. 18\n4/7f\nNew right to access, operate, make alterations to and maintain the existing drainage outlet pipeline. Grouting works under land.\nWork Nos. 6a and 19\n4/9b, 4/10\nNew right to access, operate, make alterations to and maintain the existing drainage outlet pipeline.\nWork No. 6b\n4/12b, 4/13b, 4/13d\nRequired to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge. Rights to construct and retain grouting works under land.\nWork No. 18\n4/14b\nRequired to carry out the demolition and construction of the replacement North Dene Footbridge and rights to construct and retain grouting works under land.\nWork No. 18\nLand Plans – Sheet 5\n5/3b, 5/4b, 5/4d\nRequired for access and construction of main highway works and junction 65 (Birtley) off slip. Rights to construct and retain grouting works under land.\nWork Nos. 6a and 8a\n5/5a\nRequired to construct the proposed highway works and associated access. Rights to construct and retain grouting works under land.\nWork No. 8a\n5/6, 5/7, 5/8, 5/9, 5/11\nRequired for construction of junction 65 (Birtley) southbound off slip road works and temporary footpath diversion. Rights to construct and retain grouting works under land.\nWork No. 8a",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 6 in force at 9.2.2021, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2021/74/schedule/6",
    "retrieved_at": "2026-10-28T22:18:09.438555+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}