  "url": "https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021/schedule-8",
  "json_url": "https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021/schedule-8.json",
  "legislation": "uksi/2021/74",
  "legislation_title": "The A1 Birtley to Coal House Development Consent Order 2021",
  "legislation_url": "https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021",
  "path": "schedule/8",
  "kind": "schedule",
  "number": "8",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1) Plot Reference Number shown on Land Plan\n(2) Purpose for which rights over land may be acquired\n(3) Relevant part of the authorised development\nLand Plans - Sheet 3\n3/3b, 3/3d\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound on slip road.\nWork Nos. 1b and 3d\n3/3c\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound on slip road.\nWork Nos. 1b, 2 and 3d\n3/3e\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound on slip road. Grouting works under land.\nWork Nos. 1b and 3d\n3/3f\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound on slip road. Grouting works under land.\nWork Nos. 2 and 3d\n3/3i\nNew right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side). Grouting works under land.\nWork Nos. 2 and 3a\n3/3k, 3/3n\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team.\nWork Nos. 2, 3a and 3b\n3/3p\nTemporary working space for the widening, alteration and realignment of the existing highway and the widening of Kingsway Viaduct. The realignment of southbound off slip and northbound on slip (junction 67) with construction of new pavements, embankments, retaining walls, ground improvements.\nWork Nos. 2, 3c and 3d\n3/3q, 3/3r\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team.\nWork Nos. 2, 3a and 3b\n3/3s\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team.\nWork Nos. 2, 3c and 3d\n3/3v\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team.\nWork Nos. 2, 3a and 3b\n3/3w, 3/3x, 3/3y\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team.\nWork Nos. 2, 3c and 3d\n3/3z\nNew right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side). Grouting\nworks under land.\nWork Nos. 2, 3c and 3d\n3/3aa\nRequired for access to construct works to junction 67 (Coal House) southbound on slip road.\nWork No. 3b\n3/3bb\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team.\nWork Nos. 1b, 2, 3c and 3d\n3/3cc\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team.\nRequired for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.\nWork Nos. 1b, 2, 3c and 3d\n3/3dd\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.\nWork Nos. 1b, 2, 3c and 3d\n3/3ee\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Grouting works under land. Widening to Junction 67 Southbound on slip road.\nWork Nos. 1a and 3b\n3/3gg\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Grouting works under land.\nWork Nos. 2 and 3b\n3/3jj\nRequired for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway.\nWork Nos. 9, 10, 13 and 14\n3/3mm\nRequired for diversion of existing Northern Gas Networks pipelines. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.\nWork Nos. 3c, 13 and 14\n3/3oo\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Grouting works under land. Widening to junction 67 southbound on slip road.\nWork Nos. 1a and 3b\n3/3pp, 3/3qq, 3/3tt\nRequired for works within and around junction 67 (Coal House) Roundabout including works to River Team. Grouting works under land.\nWork Nos. 1a and 3b\n3/3ss\nRequired for access to the works within junction 67 (Coal House) Roundabout.\nWork Nos. 12 and 16\n3/3uu, 3/10b, 3/10c, 3/11\nRequired to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment, and for grouting works on the land underneath the proposed new structure.\nWork No. 5a, 5b and 23\n3/3ww\nRequired to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment, and for grouting works on the land underneath the proposed new structure.\nWork Nos. 5a, 5b and 23\n3/3xx\nRequired for the working compound and associated access.\nN/A\n3/3aaa\nRequired for proposed Northumbrian Water pipeline diversion. Grouting works under land.\nWork Nos. 4b, 5a, and 22\n3/3bbb\nRequired for proposed Northumbrian Water pipeline diversion.\nWork No. 22\n3/3ccc\nRequired to access, maintain and alter existing drainage outlet and ditch.\nWork No. 6b\n3/3eee\nRequired for the working compound and associated access. Demolition of Existing Allerdene Bridge.\nWork No. 21\n3/3fff\nTemporary working space for the widening, alteration and realignment of the existing highway with construction of new pavements, embankments, retaining walls, ground improvements and directional gantry signs. Diversion of Northumbrian Water main under the A1 carriageway.\nWork Nos. 6a and 22\n3/3ggg\nRequired for the working compound and associated access. Northumbrian Water pipeline diversion.\nWork No. 22\n3/3jjj\nRequired to access, maintain and alter existing drainage outlets.\nWork No. 6a\n3/3kkk\nRequired for access and to construct proposed highway and associated embankment. Grouting works under land.\nWork Nos. 6a and 7a\n3/3nnn\nRequired for access and to construct proposed highway and associated embankment. Required to alter existing drainage outlets. Grouting works under land.\nWork Nos. 6a and 7a\n3/4e, 3/4f\nRequired for access and to construct proposed highway and associated embankment. Required to access, maintain and alter existing drainage outlet and ditch.\nWork No. 6b\n3/4h, 3/4r\nRequired to access, maintain\nand alter existing drainage outlet and ditch.\nWork No. 6b\n3/4j, 3/4k\nRequired for access and to construct proposed highway and associated embankment.\nWork No. 6b\n3/4q\nRequired to access, maintain and alter existing drainage outlet and ditch. Grouting works under land.\nWork No. 6b\n3/4t\nRequired for proposed Northumbrian Water pipeline diversion.\nWork No. 22\n3/5\nRequired for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway.\nWork Nos. 9, 10, 13, 14 and 15\n3/6a\nRequired for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway.\nWork Nos. 9, 10, 13, 14 and 15\n3/6c\nRequired for the construction compound for Allerdene Bridge and associated access.\nN/A\n3/6d\nRequired for diversion of existing Northern Gas Networks pipelines. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.\nWork Nos. 9, 13, 14 and 15\n3/6f\nRequired for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway. Grouting works under land.\nWork Nos. 10, 14 and 15\n3/6g, 3/6h\nRequired for access to the works within junction 67 (Coal House) Roundabout.\nWork Nos. 12 and 16\n3/6i\nRequired for access to the works within junction 67 (Coal House) Roundabout.\nWork Nos. 12, 15 and 16\n3/6k\nRequired for construction compound. Grouting works under land.\nN/A\n3/6m, 3/7, 3/8, 3/9\nRequired for access to the works within junction 67 (Coal House) Roundabout.\nWork No. 16\n3/10a\nRequired to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment.\nWork Nos. 5a, 5b and 23\n3/10d\nNew right to demolish the existing Allerdene Bridge and construct, operate, access and maintain a replacement offline Allerdene Bridge structure and for grouting works on the land underneath the proposed new structure.\nWork Nos. 5a, 5b and 23\n3/10h\nNew right to construct, operate, access and maintain a replacement offline Allerdene Bridge structure, associated Overhead Line Equipment and for grouting works on the land underneath the proposed new structure.\nWork Nos. 4a, 4b, 5a, 5b and 23\n3/10i\nRequired to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment.\nWork Nos. 4a, 4b, 5a, 5b and 23\n3/12b\nRequired to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment, and for grouting works on the land underneath the proposed new structure.\nWork Nos. 4a, 4b, 5a, 5b and 23\n3/13a\nRequired for the construction compound for Allerdene Bridge and associated access.\nN/A\nLand Plans – Sheet 4\n4/1m\nRealignment of junction 66 southbound on slip road.\nWork No. 7b\n4/1p\nRequired for the construction compound at junction 66 (Eighton Lodge) and associated access.\nN/A\n4/2a, 4/2b\nRequired for the temporary stopping up of footpath that runs parallel to A167 Durham Road from Angel of the North to junction 66 (Eighton Lodge).\nN/A\n4/2d\nNew right to extend the Longbank Bridleway Underpass and operate, access and maintain the structure and associated equipment.\nWork Nos. 6a and 19\n4/2e\nRequired to construct the extension of Longbank Bridleway Underpass, including temporary working space and diversions for pedestrians during the Underpass closure.\nWork Nos. 6a and 19\n4/3a\nRequired for utility diversions and associated works within junction 66 (Eighton Lodge) Roundabout.\nWork No. 6a\n4/3b\nRequired for utility diversions and associated works within junction 66 (Eighton Lodge) Roundabout. Grouting works under land.\nWork No. 6a\n4/3i, 4/3j, 4/3m, 4/3n, 4/3p,\n4/4a, 4/4c, 4/4d, 4/4e, 4/4f, 4/5\nRequired for the construction compound at junction 66 (Eighton Lodge) and associated access.\nN/A\n4/3q, 4/4b\nRequired for the construction compound at junction 66 (Eighton Lodge) and associated access. Grouting works under land.\nN/A\n4/6a\nRequired to construct the extension of Longbank Bridleway Underpass, including temporary working space and diversions for pedestrians during the Underpass closure.\nWork Nos. 6a and 19\n4/6b\nRequired to construct the extension of Longbank Bridleway Underpass, including temporary working space and diversions for pedestrians during the Underpass closure. Grouting works under land.\nWork Nos. 6a and 19\n4/7b, 4/7e\nRequired to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge. Grouting works under land.\nWork No. 18\n4/7c\nRequired to carry out the Longbank Underpass and for temporary diversion of pedestrians during closure of the Footbridge.\nWork No. 19\n4/8\nRequired to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge.\nWork No. 18\n4/9a\nRequired to construct the proposed highway widening works and for construction access.\nWork Nos. 6a and 6b\n4/12a\nRequired for access, alteration and maintenance of existing discharge outlet pipelines.\nWork No. 6b\n4/12b, 4/13b, 4/13d\nRequired to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge. Grouting works under land.\nWork No.18\n4/13e, 4/13f, 4/14c\nRequired to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge.\nWork No. 18\n4/14b\nRequired to carry out the demolition and construction of the replacement North Dene Footbridge and for grouting works under land.\nWork No.18\n4/15, 5/1a, 5/1b\nRequired to construct the proposed highway works and for utility diversions.\nWork No. 6b\nLand Plans – Sheet 5\n5/3b, 5/4b, 5/4d\nRequired for access and construction of main highway works and junction 65 (Birtley) off slip. Grouting works under land.\nWork Nos. 6a and 8a\n5/5a\nRequired to construct the proposed highway works and associated access. Grouting works under land.\nWork No. 8a\n5/5c, 5/5e, 5/10b\nRequired for access and construction of junction 65 (Birtley) northbound on-slip road works.\nWork Nos. 6b and 8b\n5/6, 5/7, 5/8, 5/9, 5/11\nRequired for construction of junction 65 (Birtley) southbound off slip road works and temporary footpath diversion. Grouting works under land.\nWork No. 8a",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 8 in force at 9.2.2021, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2021/74/schedule/8",
    "retrieved_at": "2026-10-28T22:18:09.438555+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}