# The A1 Birtley to Coal House Development Consent Order 2021, Schedule 8: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Extent: E+W+S

(1) Plot Reference Number shown on Land Plan
(2) Purpose for which rights over land may be acquired
(3) Relevant part of the authorised development
Land Plans - Sheet 3
3/3b, 3/3d
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound on slip road.
Work Nos. 1b and 3d
3/3c
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound on slip road.
Work Nos. 1b, 2 and 3d
3/3e
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound on slip road. Grouting works under land.
Work Nos. 1b and 3d
3/3f
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound on slip road. Grouting works under land.
Work Nos. 2 and 3d
3/3i
New right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side). Grouting works under land.
Work Nos. 2 and 3a
3/3k, 3/3n
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team.
Work Nos. 2, 3a and 3b
3/3p
Temporary working space for the widening, alteration and realignment of the existing highway and the widening of Kingsway Viaduct. The realignment of southbound off slip and northbound on slip (junction 67) with construction of new pavements, embankments, retaining walls, ground improvements.
Work Nos. 2, 3c and 3d
3/3q, 3/3r
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team.
Work Nos. 2, 3a and 3b
3/3s
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team.
Work Nos. 2, 3c and 3d
3/3v
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team.
Work Nos. 2, 3a and 3b
3/3w, 3/3x, 3/3y
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team.
Work Nos. 2, 3c and 3d
3/3z
New right to widen the existing Kingsway Viaduct and operate, access and maintain the structure (including the airspace underneath and extending up to 15m either side). Grouting
works under land.
Work Nos. 2, 3c and 3d
3/3aa
Required for access to construct works to junction 67 (Coal House) southbound on slip road.
Work No. 3b
3/3bb
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team.
Work Nos. 1b, 2, 3c and 3d
3/3cc
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team.
Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.
Work Nos. 1b, 2, 3c and 3d
3/3dd
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.
Work Nos. 1b, 2, 3c and 3d
3/3ee
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Grouting works under land. Widening to Junction 67 Southbound on slip road.
Work Nos. 1a and 3b
3/3gg
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Grouting works under land.
Work Nos. 2 and 3b
3/3jj
Required for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway.
Work Nos. 9, 10, 13 and 14
3/3mm
Required for diversion of existing Northern Gas Networks pipelines. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.
Work Nos. 3c, 13 and 14
3/3oo
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Grouting works under land. Widening to junction 67 southbound on slip road.
Work Nos. 1a and 3b
3/3pp, 3/3qq, 3/3tt
Required for works within and around junction 67 (Coal House) Roundabout including works to River Team. Grouting works under land.
Work Nos. 1a and 3b
3/3ss
Required for access to the works within junction 67 (Coal House) Roundabout.
Work Nos. 12 and 16
3/3uu, 3/10b, 3/10c, 3/11
Required to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment, and for grouting works on the land underneath the proposed new structure.
Work No. 5a, 5b and 23
3/3ww
Required to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment, and for grouting works on the land underneath the proposed new structure.
Work Nos. 5a, 5b and 23
3/3xx
Required for the working compound and associated access.
N/A
3/3aaa
Required for proposed Northumbrian Water pipeline diversion. Grouting works under land.
Work Nos. 4b, 5a, and 22
3/3bbb
Required for proposed Northumbrian Water pipeline diversion.
Work No. 22
3/3ccc
Required to access, maintain and alter existing drainage outlet and ditch.
Work No. 6b
3/3eee
Required for the working compound and associated access. Demolition of Existing Allerdene Bridge.
Work No. 21
3/3fff
Temporary working space for the widening, alteration and realignment of the existing highway with construction of new pavements, embankments, retaining walls, ground improvements and directional gantry signs. Diversion of Northumbrian Water main under the A1 carriageway.
Work Nos. 6a and 22
3/3ggg
Required for the working compound and associated access. Northumbrian Water pipeline diversion.
Work No. 22
3/3jjj
Required to access, maintain and alter existing drainage outlets.
Work No. 6a
3/3kkk
Required for access and to construct proposed highway and associated embankment. Grouting works under land.
Work Nos. 6a and 7a
3/3nnn
Required for access and to construct proposed highway and associated embankment. Required to alter existing drainage outlets. Grouting works under land.
Work Nos. 6a and 7a
3/4e, 3/4f
Required for access and to construct proposed highway and associated embankment. Required to access, maintain and alter existing drainage outlet and ditch.
Work No. 6b
3/4h, 3/4r
Required to access, maintain
and alter existing drainage outlet and ditch.
Work No. 6b
3/4j, 3/4k
Required for access and to construct proposed highway and associated embankment.
Work No. 6b
3/4q
Required to access, maintain and alter existing drainage outlet and ditch. Grouting works under land.
Work No. 6b
3/4t
Required for proposed Northumbrian Water pipeline diversion.
Work No. 22
3/5
Required for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway.
Work Nos. 9, 10, 13, 14 and 15
3/6a
Required for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway.
Work Nos. 9, 10, 13, 14 and 15
3/6c
Required for the construction compound for Allerdene Bridge and associated access.
N/A
3/6d
Required for diversion of existing Northern Gas Networks pipelines. Required for access to construct works to junction 67 (Coal House) northbound off slip road. Grouting works under land.
Work Nos. 9, 13, 14 and 15
3/6f
Required for diversion of existing Northern Gas Networks pipelines and construction of associated gas transfer station building adjacent to northbound carriageway. Grouting works under land.
Work Nos. 10, 14 and 15
3/6g, 3/6h
Required for access to the works within junction 67 (Coal House) Roundabout.
Work Nos. 12 and 16
3/6i
Required for access to the works within junction 67 (Coal House) Roundabout.
Work Nos. 12, 15 and 16
3/6k
Required for construction compound. Grouting works under land.
N/A
3/6m, 3/7, 3/8, 3/9
Required for access to the works within junction 67 (Coal House) Roundabout.
Work No. 16
3/10a
Required to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment.
Work Nos. 5a, 5b and 23
3/10d
New right to demolish the existing Allerdene Bridge and construct, operate, access and maintain a replacement offline Allerdene Bridge structure and for grouting works on the land underneath the proposed new structure.
Work Nos. 5a, 5b and 23
3/10h
New right to construct, operate, access and maintain a replacement offline Allerdene Bridge structure, associated Overhead Line Equipment and for grouting works on the land underneath the proposed new structure.
Work Nos. 4a, 4b, 5a, 5b and 23
3/10i
Required to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment.
Work Nos. 4a, 4b, 5a, 5b and 23
3/12b
Required to access and carry out the demolition of the existing Allerdene Bridge, the construction of the replacement Allerdene Bridge and associated Overhead Line Equipment, and for grouting works on the land underneath the proposed new structure.
Work Nos. 4a, 4b, 5a, 5b and 23
3/13a
Required for the construction compound for Allerdene Bridge and associated access.
N/A
Land Plans – Sheet 4
4/1m
Realignment of junction 66 southbound on slip road.
Work No. 7b
4/1p
Required for the construction compound at junction 66 (Eighton Lodge) and associated access.
N/A
4/2a, 4/2b
Required for the temporary stopping up of footpath that runs parallel to A167 Durham Road from Angel of the North to junction 66 (Eighton Lodge).
N/A
4/2d
New right to extend the Longbank Bridleway Underpass and operate, access and maintain the structure and associated equipment.
Work Nos. 6a and 19
4/2e
Required to construct the extension of Longbank Bridleway Underpass, including temporary working space and diversions for pedestrians during the Underpass closure.
Work Nos. 6a and 19
4/3a
Required for utility diversions and associated works within junction 66 (Eighton Lodge) Roundabout.
Work No. 6a
4/3b
Required for utility diversions and associated works within junction 66 (Eighton Lodge) Roundabout. Grouting works under land.
Work No. 6a
4/3i, 4/3j, 4/3m, 4/3n, 4/3p,
4/4a, 4/4c, 4/4d, 4/4e, 4/4f, 4/5
Required for the construction compound at junction 66 (Eighton Lodge) and associated access.
N/A
4/3q, 4/4b
Required for the construction compound at junction 66 (Eighton Lodge) and associated access. Grouting works under land.
N/A
4/6a
Required to construct the extension of Longbank Bridleway Underpass, including temporary working space and diversions for pedestrians during the Underpass closure.
Work Nos. 6a and 19
4/6b
Required to construct the extension of Longbank Bridleway Underpass, including temporary working space and diversions for pedestrians during the Underpass closure. Grouting works under land.
Work Nos. 6a and 19
4/7b, 4/7e
Required to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge. Grouting works under land.
Work No. 18
4/7c
Required to carry out the Longbank Underpass and for temporary diversion of pedestrians during closure of the Footbridge.
Work No. 19
4/8
Required to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge.
Work No. 18
4/9a
Required to construct the proposed highway widening works and for construction access.
Work Nos. 6a and 6b
4/12a
Required for access, alteration and maintenance of existing discharge outlet pipelines.
Work No. 6b
4/12b, 4/13b, 4/13d
Required to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge. Grouting works under land.
Work No.18
4/13e, 4/13f, 4/14c
Required to carry out the demolition and construction of the replacement North Dene Footbridge and for temporary diversion of pedestrians during closure of the Footbridge.
Work No. 18
4/14b
Required to carry out the demolition and construction of the replacement North Dene Footbridge and for grouting works under land.
Work No.18
4/15, 5/1a, 5/1b
Required to construct the proposed highway works and for utility diversions.
Work No. 6b
Land Plans – Sheet 5
5/3b, 5/4b, 5/4d
Required for access and construction of main highway works and junction 65 (Birtley) off slip. Grouting works under land.
Work Nos. 6a and 8a
5/5a
Required to construct the proposed highway works and associated access. Grouting works under land.
Work No. 8a
5/5c, 5/5e, 5/10b
Required for access and construction of junction 65 (Birtley) northbound on-slip road works.
Work Nos. 6b and 8b
5/6, 5/7, 5/8, 5/9, 5/11
Required for construction of junction 65 (Birtley) southbound off slip road works and temporary footpath diversion. Grouting works under land.
Work No. 8a

---
Source: https://www.legislation.gov.uk/uksi/2021/74/schedule/8 (the official version)
Page: https://openlegislation.uk/a1-birtley-to-coal-house-development-consent-order-2021/schedule-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

