Schedule 3 SPECIFICATION OF THE NEW MOTORWAY BRIDGE CROSSING THE RIVER URE WEST OF THE EXISTING ARROWS BRIDGE NEAR BOROUGHBRIDGE IN THE COUNTY OF NORTH YORKSHIRE
From a point on the south side of the River Ure 47.5 metres south-west of the south-west parapet of the existing Arrows Bridge and 67 metres south of the south pier of the existing Arrows Bridge.
To a point on the north side of the River Ure 40 metres south-west of the north-west parapet of the existing Arrows Bridge and 44.5 metres west of the north pier of the existing Arrows Bridge.