{
  "url": "https://openlegislation.uk/a122-lower-thames-crossing-development-consent-order-2025/schedule-11",
  "json_url": "https://openlegislation.uk/a122-lower-thames-crossing-development-consent-order-2025/schedule-11.json",
  "legislation": "uksi/2025/462",
  "legislation_title": "The A122 (Lower Thames Crossing) Development Consent Order 2025",
  "legislation_url": "https://openlegislation.uk/a122-lower-thames-crossing-development-consent-order-2025",
  "path": "schedule/11",
  "kind": "schedule",
  "number": "11",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)\nPlot Reference Number shown on Land Plans\n(2)\nPurpose for which temporary possession may be taken\n(3)\nRelevant part of the authorised development\n01-01, 01-03, 01-05, 01-08, 01-09, 01-10, 01-11, 01-13, 01-15, 01-16, 01-17, 01-18, 01-19, 01-20, 01-21 and 01-22\nProvision for access for environmental works to create a compensatory habitat site for nitrogen deposition.\nWork No. E1\n02-04, 02-05, 02-06, 02-07, 02-08, 02-09, 02-10 and 02-11\nProvision for access for environmental works to create a compensatory habitat site for nitrogen deposition.\nWork No. E1\n03-02, 03-03, 03-14, 03-16 and 03-17\nInstallation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G1a and MU1\n03-04 and 03-08\nImprovement works to the existing public right of way along footpath NS179.\nWork No. 1K\n03-07\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU2, MU3 and MU4\n03-33\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU4\n03-36 and 03-80\nTo facilitate the construction of a new public right of way from drainage pond to the improved public right of way south of the improved A2 mainline, and to provide temporary storage, laydown areas and working space.\nWork No. 1K\n03-87\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU3\n03-96, 03-98, 03-112, 03-135, 03-139, 03-140, 03-141, 03-142, 03-143, 03-144 and 03-146\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU1\n04-03 and 04-14\nInstallation of a medium-pressure gas pipeline.\nWork No. G1b\n04-07, 04-12, 04-17, 04-45, 04-101 and 04-122\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E5\n04-08, 04-16, 04-61, 04-72, 04-109, 04-128 and 04-154\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU9\n04-25, 04-28 and 04-46\nImprovement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.\nWork No. 1L\n04-37\nConstruction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House; and improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.\nWorks Nos. 1E and 1L\n04-38\nTemporary construction compound at surface for facilitating main works; and installation of a medium-pressure gas pipeline.\nWorks Nos. CA2 and G1b\n04-42\nTemporary construction compound at surface for facilitating main works; installation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports.\nWorks Nos. CA2, G1b, MU10 and OH2\n04-58 and 04-92\nInstallation of a medium-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; overhead lines diversion works, including the removal of existing overhead lines and supports.\nWorks Nos. G1b, MU10 and OH2\n04-63, 04-93, 04-94 and 04-98\nInstallation of a medium-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and supports.\nWorks Nos. G1b and OH2\n04-89\nImplementation of environmental mitigation works to create a site for protected species; installation of a medium-pressure gas pipeline; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. E4, G1a, G1b, MU10, MU11 and MUT1\n04-96, 04-100 and 04-103\nTo facilitate the construction of a new bridge to carry the realigned Thong Lane over the improved section of the A2 mainline, and to provide temporary storage, laydown areas and working space.\nWork No. 1H\n04-99 and 04-145\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E4\n04-108, 04-137 and 04-141\nProvision for temporary access for environmental mitigation works to create a site for protected species.\nWork No. E4\n04-123\nConstruction of a new permissive path from Halfpence Lane roundabout to road leading to Scalers Hill House.\nWork No. 1E\n04-138\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU10\n04-140, 04-223, 04-228, 04-244, 04-246, 04-247, 04-249, 04-251, 04-252, 04-266 and 04-268\nInstallation of a medium-pressure gas pipeline.\nWork No. G1a\n04-148, 04-149, 04-151, 04-152 and 04-153\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU8\n04-200, 04-233, 04-257 and 04-258\nImprovement works to the existing public right of way along footpath NS179.\nWork No. 1K\n04-215, 04-229, 04-243 and 04-259\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU4\n04-225\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU5\n04-226 and 04-227\nInstallation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G1a and MU5\n04-253, 04-254 and 04-255\nTo facilitate the installation of a medium-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G1a\n04-274\nImplementation of environmental mitigation works to create a site for protected species; and installation of a medium-pressure gas pipeline.\nWorks Nos. E4 and G1a\n04-276\nTemporary construction compound at surface for facilitating main works and overhead lines diversion works, including the removal of existing overhead lines and supports.\nWorks Nos. CA2 and OH2\n05-01, 05-02 and 05-03\nConstruction of a new permissive path between the improved public right of way and Jeskyns Community woodland Improvement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.\nWork No. 1L\n05-04, 05-05 and 05-06\nImprovement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.\nWork No. 1L\n05-07, 05-08, 05-09, 05-10, 05-11, 05-12, 05-13, 05-14, 05-15, 05-16, 05-17 and 05-18\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU8\n06-03\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU15 and MU16\n06-08, 06-09 and 06-11\nImprovement works to a section of the existing public right of way from Church Road to existing public right of way footpath NS175.\nWork No. 2P\n06-18, 06-19, 06-98, 06-102, 06-104, 06-107, 06-111, 06-112, 06-113, 06-114 and 06-115\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU16\n06-46\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH1\n06-54\nProvision for access for overhead lines diversion works.\nWork No. OH1\n06-55 and 06-64\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU14\n06-56\nConstruction of a new permissive path between the improved public right of way and Jeskyns Community woodland; implementation of environmental mitigation works to create a site for protected species Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 1L, E5 and OH1\n06-67 and 06-117\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU14 and MU9\n06-72, 06-78 and 06-131\nInstallation of a medium-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G1b and MU16\n06-75\nImprovement works of the existing public right of way to a section between Halfpence Lane roundabout to Jeskyns Community woodland.\nWork No. 1L\n06-91, 06-96 and 06-99\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 2Q and MU16\n06-109 and 06-123\nConstruction of a new public right of way from Valley Drive to the existing public right of way footpath NS174.\nWork No. 2Q\n06-110\nTo facilitate the construction of a new public right of way from Valley Drive to the existing public right of way footpath NS174, and to provide temporary storage, laydown areas and working space.\nWork No. 2Q\n06-116\nProvision for access for environmental mitigation works to create a site for protected species.\nWork No. E5\n06-121\nImplementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. E5, MU14, MU9, OH1 and OHT1\n06-132, 06-136, 06-137, 06-139, 06-151, 06-207, 06-208 and 06-209\nInstallation of a medium-pressure gas pipeline.\nWork No. G1b\n06-135\nTo facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWork No. OH1\n06-144\nInstallation of a medium-pressure gas pipeline Installation of a high-pressure gas pipeline.\nWorks Nos. G1b and G2\n06-152\nInstallation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. G1b, G2, G3, MU17, OH1 and OHT1\n06-153\nConstruction of a new permissive path between the improved public right of way and Jeskyns Community woodland.\nWork No. 1L\n06-158\nInstallation of a medium-pressure gas pipeline; installation of a high-pressure gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. G1b, G2, G3, MU17 and OH1\n06-182, 06-188 and 06-204\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E5\n06-187 and 06-205\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU9\n07-01, 07-02, 07-04, 07-05, 07-09, 07-11, 07-15, 07-17, 07-20, 07-22, 07-23, 07-26, 07-27, 07-28, 07-29, 07-40, 07-41 and 07-42\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU15\n08-06, 08-07, 08-08, 08-09, 08-10, 08-11, 08-12, 08-13, 08-14 and 08-15\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU15\n09-02, 09-03, 09-04, 09-05, 09-06, 09-07, 09-08, 09-09, 09-10, 09-11, 09-12, 09-13, 09-14, 09-15, 09-16, 09-17, 09-18, 09-19, 09-20, 09-21, 09-22, 09-23, 09-24, 09-25, 09-26, 09-27, 09-28, 09-29, 09-30, 09-31, 09-32, 09-33, 09-34, 09-35, 09-36, 09-37, 09-38, 09-39, 09-40, 09-41, 09-42, 09-43, 09-44, 09-45, 09-46, 09-47, 09-48, 09-49, 09-50, 09-51, 09-52, 09-53, 09-54, 09-55, 09-56, 09-57, 09-58, 09-59, 09-60, 09-61, 09-62, 09-63, 09-64, 09-65, 09-66, 09-67, 09-68 and 09-69\nProvision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWork No. CA3\n10-02\nOverhead lines diversion works, including the removal of existing overhead lines and supports.\nWork No. OH2\n10-05, 10-06, 10-07, 10-08, 10-09 and 10-10\nProvision for access for environmental works to create a compensatory habitat site for nitrogen deposition.\nWork No. E13\n11-02, 11-03, 11-04, 11-05, 11-06 and 11-07\nImprovements works of a section of the existing public right of way footpath NS169.\nWork No. 2Q\n11-15\nInstallation of a medium-pressure gas pipeline Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. G1b and OH1\n11-24\nInstallation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. G3 and OH1\n11-38\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU18 and OH1\n11-39\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons\nWorks Nos. G3, MU18 and OH1\n11-40\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH1\n11-43, 11-46, 11-47 and 11-48\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU18\n11-50\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G3 and MU18\n11-52, 11-53 and 11-54\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G3\n11-56, 11-57, 11-59, 11-60, 11-61, 11-62, 11-65, 11-67 and 11-76\nOverhead lines diversion works, including the removal of existing overhead lines and supports.\nWork No. OH2\n11-63\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWork No. CA3\n11-64 and 11-70\nInstallation of a high-pressure gas pipeline.\nWork No. G4\n11-68 and 11-69\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G4\n11-71\nOverhead lines diversion works, including the removal of existing overhead lines and supports; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. OH2 and ULH13\n11-73\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. CA3, G4 and OH1\n11-75\nThe establishment of a temporary utilities logistic hub for facilitating utility works.\nWork No. ULH13\n12-01, 12-03 and 12-04\nOverhead lines diversion works, including the removal of existing overhead lines and supports.\nWork No. OH2\n12-02\nInstallation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. G4 and OH1\n12-05 and 12-07\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWork No. CA3\n12-06\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works.\nWorks Nos. MU20 and OH1\n12-08, 12-09, 12-12, 12-14, 12-15, 12-17, 12-18 and 12-19\nProvision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA3 and MU20\n12-13 and 12-16\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU20\n12-20\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and supports.\nWorks Nos. MU20 and OH2\n12-21, 12-22, 12-23, 12-24, 12-25, 12-26, 12-27, 12-28, 12-29, 12-30, 12-31, 12-32, 12-33, 12-34, 12-35, 12-36, 12-37, 12-38, 12-39, 12-40, 12-41, 12-42, 12-43, 12-44, 12-45, 12-46, 12-47, 12-48, 12-49, 12-50, 12-51, 12-52, 12-53, 12-54, 12-55, 12-56, 12-57, 12-58, 12-59, 12-60, 12-61, 12-62, 12-63, 12-64, 12-65, 12-66 and 12-67\nProvision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWork No. CA3\n13-04 and 13-05\nConstruction of a new public right of way, including the upgrade of a section of the existing footpath NG7 from the new public right of way between the existing Thong Lane to the new Thong Lane bridge over the A122 Lower Thames Crossing and Thong Lane; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWorks Nos. 3N and CA3\n13-06, 13-07, 13-11, 13-22, 13-66, 13-69, 13-81 and 13-88\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWork No. CA3\n13-12\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU23 and MUT3\n13-13, 13-14, 13-15, 13-16, 13-17 and 13-18\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU23\n13-19, 13-21, 13-24, 13-25, 13-26, 13-27, 13-28, 13-29, 13-30, 13-31, 13-32, 13-33, 13-34, 13-40 and 13-45\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT3\n13-20 and 13-42\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA3 and MUT3\n13-38, 13-41 and 13-50\nConstruction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWorks Nos. 4A and CA3\n13-46\nConstruction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 4A, CA3, MU20, MU22, MU24 and MUT3\n13-47\nConstruction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 4A, CA3, MU20, MU24 and MUT3\n13-48\nConstruction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 4A, CA3, MU24 and MUT3\n13-53, 13-60, 13-61 and 13-62\nConstruction of a public right of way, including the upgrade of a section of existing footpath NG8 between the new public right of way from Thong Lane bridge over the A122 Lower Thames Crossing to NG7 and the A226; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for temporary access for overhead lines diversion works.\nWorks Nos. 3P, CA3 and OH1\n13-54, 13-55, 13-56, 13-70 and 13-71\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA3 and MU20\n13-63, 13-72, 13-85, 13-89 and 13-90\nProvision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA3 and MU20\n13-65\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. CA3, G4 and OH1\n13-67\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Installation of a high-pressure gas pipeline; provision for temporary access for overhead lines diversion works.\nWorks Nos. CA3, G4 and OH1\n13-68 and 13-77\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWorks Nos. CA3 and OH1\n13-73 and 13-76\nOverhead lines diversion works, including the removal of existing overhead lines and supports.\nWork No. OH2\n13-74 and 13-75\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. CA3 and OH1\n13-78\nTo facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWork No. OH1\n13-79\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach; provision for access for overhead lines diversion works.\nWorks Nos. CA3 and OH1\n14-01\nProvision for temporary outfall of drainage from temporary satellite construction compound to existing ditch; and implementation of temporary environmental works to create a compensatory habitat site.\nWorks Nos. 4C and ET1\n14-02 and 14-03\nProvision for temporary outfall of drainage from temporary satellite construction compound to existing ditch.\nWork No. 4C\n14-11\nConstruction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel ; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 4A, 4B, CA3, CA3A, MU25, MU26 and MUT3\n14-16, 14-17 and 14-18\nConstruction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 4A, 4B and MU26\n14-19 and 14-20\nTemporary satellite construction compound at surface for facilitating main works.\nWork No. CA3A\n15-01, 15-09, 15-21, 15-22 and 15-23\nTemporary satellite construction compound at surface for facilitating main works.\nWork No. CA3B\n15-02\nProvision for temporary access and traffic management for the temporary construction compound facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWork No. CA3B\n15-03, 15-04, 15-05, 15-06 and 15-07\nProvision for repairs to existing culvert.\nWork No. CA3B\n15-08\nImplementation of temporary environmental works to create a compensatory habitat site.\nWork No. ET1\n15-17, 15-18 and 15-19\nConstruction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; and construction of a new permanent ground protection tunnel and access shafts to undertake ground treatment works above the new A122 Lower Thames Crossing tunnel Temporary satellite construction compound at surface for facilitating main works.\nWorks Nos. 4A, 4B and CA3B\n16-02, 16-04, 16-05, 16-10, 16-11, 16-12, 16-17, 16-18, 16-19, 16-20, 16-21, 16-30, 16-31 and 16-32\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5, MU27 and MUT4\n16-03, 16-06, 16-07, 16-08, 16-09, 16-13, 16-14, 16-15, 16-16, 16-23, 16-24, 16-25, 16-26, 16-27, 16-28, 16-29, 16-33, 16-34, 16-35 and 16-40\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWork No. CA5\n16-22\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal.\nWorks Nos. CA5, MU27, MUT4 and MUT5\n16-44, 16-60, 16-62 and 16-63\nConstruction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWorks Nos. 5A, 5O and CA5\n16-47, 16-64, 16-67 and 16-69\nProvision for temporary outfall of drainage to the River Thames from the north portal of the A122 Lower Thames Crossing.\nWork No. 5A\n16-49, 16-54, 16-55, 16-56, 16-57, 16-58 and 16-59\nConstruction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWorks Nos. 5A and CA5\n16-62 and 16-63\nConstruction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; construction a new public right of way along the existing footpath FP146; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWorks Nos. 5A, 5O and CA5\n16-65 and 16-66\nProvision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.\nWork No. CA5\n16-68\nConstruction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames.\nWork No. 5A\n16-70\nConstruction of a twin-bore tunnel, one tunnel bore for northbound traffic and one tunnel bore for southbound traffic, with a three-lane carriageway in each direction, between a portal on the north side of the river Thames in the borough of Thurrock, Essex, and a portal in Gravesham, Kent, including cross-passages connecting the two tunnels and associated tunnelling works; construction of a new public right of way along the existing footpath FP146 and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWorks Nos. 4A, 5O and CA5\n17-01, 17-02, 17-03, 17-04, 17-05 and 17-06\nProvision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.\nWork No. CA5\n17-08 and 17-09\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWork No. CA5\n18-01, 18-02, 18-03, 18-04, 18-05, 18-06, 18-07, 18-08, 18-09 and 18-10\nProvision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.\nWork No. CA5\n19-02, 19-14 and 19-35\nProvision for temporary access for environmental mitigation works to create a site for protected species.\nWork No. E15\n19-04, 19-06, 19-08, 19-10, 19-11, 19-15, 19-16, 19-21, 19-22, 19-26, 19-27 and 19-28\nTo facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space.\nWork No. 5R\n19-05\nImplementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure.\nWork No. E17\n19-36\nConstruction of a new public right of way along the eastern section of FP200 and a new public right of way between Coalhouse Fort and FP200.\nWork No. 5R\n19-37\nConstruction of a new water inlet with self-regulating valve.\nWork No. 5X\n19-38\nConstruction of a new public right of way along the eastern section of FP200.\nWork No. 5R\n20-01 and 20-13\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU27\n20-02, 20-03, 20-04, 20-05, 20-26, 20-27, 20-29, 20-30, 20-31, 20-33, 20-34, 20-35, 20-36, 20-37, 20-38, 20-39, 20-40, 20-43, 20-44, 20-46, 20-54, 20-71, 20-72, 20-90, 20-91, 20-92, 20-93, 20-95 and 20-97\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWork No. CA5\n20-06, 20-07, 20-08 and 20-09\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5, MU27 and MUT4\n20-10, 20-12, 20-15, 20-16, 20-17, 20-28 and 20-32\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH3\n20-11, 20-23, 20-24 and 20-25\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. CA5 and OH3\n20-14\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU27 and OH4\n20-18\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. CA5, MU28, OH3 and OH4\n20-19 and 20-20\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH4\n20-21 and 20-22\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU28 and OH4\n20-41\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5, MU27, MU29, MUT7, MUT8 and MUT9\n20-42\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation of a substation to power the tunnel boring machine at the northern portal.\nWorks Nos. CA5, MU27, MUT4 and MUT5\n20-47, 20-48, 20-49, 20-50, 20-55, 20-56, 20-57 and 20-61\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5 and MU27\n20-75 and 20-76\nConstruction of a new public rights of way along the existing footpath FP200; temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 5U, CA5 and MU27\n20-87 and 20-102\nTo facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space.\nWork No. 5R\n20-99\nConstruction of a new outfall from the north portal of the A122 Lower Thames Crossing to the River Thames; and temporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWorks Nos. 5A and CA5\n21-01, 21-02, 21-03, 21-04, 21-05, 21-06, 21-07, 21-08, 21-09, 21-11, 21-12 and 21-37\nProvision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.\nWork No. CA5\n21-13, 21-15, 21-16, 21-17, 21-23, 21-25, 21-26, 21-28 and 21-29\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU27\n21-14 and 21-20\nProvision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5 and MU27\n21-18, 21-19, 21-27, 21-30 and 21-31\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWork No. CA5\n21-24\nProvision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5, MU27 and MUT4\n21-32 and 21-34\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing south portal and tunnel approach.\nWork No. CA5\n21-33, 21-35 and 21-36\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5, MU27 and MUT4\n22-01, 22-11, 22-13, 22-19, 22-21, 22-22, 22-23, 22-24, 22-35, 22-39, 22-47, 22-48, 22-56, 22-57, 22-58, 22-60, 22-61, 22-62, 22-63, 22-64, 22-65, 22-66, 22-67, 22-68, 22-69, 22-70, 22-71, 22-73, 22-74, 22-75, 22-76, 22-78, 22-79, 22-80, 22-81, 22-82, 22-83, 22-84, 22-85, 22-86, 22-87, 22-88, 22-89, 22-90 and 22-91\nProvision for temporary access for environmental mitigation works to create a site for protected species.\nWork No. E16\n22-02, 22-15 and 22-18\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MUT6\n22-03, 22-07, 22-09, 22-12, 22-16, 22-17, 22-20 and 22-116\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWork No. CA5\n22-04, 22-05, 22-06, 22-08, 22-10 and 22-14\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5 and MUT6\n22-25, 22-27, 22-29, 22-30, 22-31, 22-32, 22-34 and 22-37\nProvision for temporary access for environmental mitigation works to create a site for protected species; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. E16 and MUT11\n22-33, 22-36, 22-38, 22-41, 22-42, 22-43, 22-44, 22-49, 22-50, 22-51, 22-52, 22-53, 22-54 and 22-55\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT11\n23-01, 23-02, 23-03, 23-04, 23-05, 23-06, 23-07, 23-08, 23-09, 23-10, 23-11, 23-12, 23-13, 23-14, 23-15, 23-18 and 23-170\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU29\n23-16\nImplementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. E18 and MU29\n23-17 and 23-20\nProvision for access for environmental mitigation works to create a site for protected species.\nWork No. E18\n23-21 and 23-22\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E18\n23-23 and 23-38\nTemporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct.\nWork No. CA5\n23-24, 23-25, 23-110, 23-112, 23-123, 23-127, 23-138, 23-142, 23-143 and 23-146\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU27\n23-26 and 23-28\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU27 and OH4\n23-29\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU27, MU28 and OH4\n23-30\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. Temporary satellite construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons. Installation of a high-pressure gas pipeline.\nWorks Nos. CA5, CA5A, MU27, MU28, MU29, MU30, MUT7, MUT8, MUT9, OH3, OH4 and TFGP1\n23-32, 23-182, 23-183, 23-184, 23-185 and 23-186\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT8\n23-33\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU28, MU29 and MUT8\n23-35\nTo facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWork No. OH5\n23-39, 23-40 and 23-42\nProvision for temporary access and traffic management for temporary construction compound facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach.\nWork No. CA5\n23-41, 23-46 and 23-48\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH5\n23-43, 23-119, 23-124, 23-126, 23-155, 23-159, 23-166, 23-167 and 23-174\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory.\nWork No. CA5\n23-44, 23-45, 23-49, 23-53, 23-55 and 23-58\nProvision for access for overhead lines diversion works.\nWork No. OH4\n23-47\nModification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 5K, FCA1, MU33 and OH4\n23-50\nConstruction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. FCA1, MU33, OH4, OH5, OHT2 and ULH12\n23-52\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory Temporary satellite construction compound at surface for facilitating main works.\nWorks Nos. CA5 and CA5A\n23-54, 23-56, 23-60, 23-66, 23-67, 23-69 and 23-71\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH4\n23-57\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU33 and OH4\n23-59 and 23-62\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU28\n23-61\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU28, MU33 and OH4\n23-63 and 23-65\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU27, MU28, MU30, MUT9 and OH4\n23-64\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU27, MU28, MU30, MU32, MUT9 and OH4\n23-72\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU28, OH3 and OH4\n23-76\nModification of an existing irrigation reservoir and the diversion and modification of irrigation infrastructure, including possible provision of a new groundwater abstraction well; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 5K, FCA1, MU28, MU33 and OH3\n23-88, 23-90 and 23-91\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU28 and OH3\n23-95\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU28, MU30, MU31, MU32 and OH3\n23-97\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU30 and OH3\n23-115, 23-116 and 23-180\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU28\n23-100\nTemporary possession of railway to facilitate the construction of the new A122 Lower Thames Crossing between the north portal and northern end of Tilbury viaduct To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWorks Nos. CA5 and OH3\n23-101 and 23-111\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory. To facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWorks Nos. CA5 and OH3\n23-104, 23-105, 23-107, 23-109, 23-178 and 23-179\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU33\n23-108 and 23-120\nConstruction of a new public rights of way along the existing footpath FP200; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 5U and MU27\n23-114\nTo facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWork No. OH3\n23-122\nProvision for temporary access for utility works.\nWork No. MU27\n23-125\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5 and MU31\n23-128, 23-129, 23-130, 23-132, 23-135, 23-136, 23-139, 23-150, 23-151, 23-153, 23-161 and 23-162\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5 and MUT6\n23-133 and 23-148\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5, MU27, MUT10 and MUT6\n23-154 and 23-157\nTemporary construction compound at surface for facilitating main works at the A122 Lower Thames Crossing north portal and tunnel approach, including workers accommodation, batch plants and segment cast factory; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA5, MUT10 and MUT6\n23-160\nTo facilitate the construction of a new public right of way along the eastern section of FP200, and to provide temporary storage, laydown areas and working space.\nWork No. 5R\n23-163, 23-164, 23-165 and 23-168\nProvision for temporary access for environmental mitigation works to create a site for protected species.\nWork No. E16\n23-169, 23-175, 23-176 and 23-177\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT6\n23-181\nImplementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. E18, MU29 and MUT8\n24-01, 24-03, 24-05, 24-160, 24-161, 24-162 and 24-163\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU35\n24-06, 24-07 and 24-12\nProvision for access for utility works; provision for access for overhead lines diversion works.\nWorks Nos. MU37, OH6 and OH7\n24-08, 24-25, 24-30 and 24-32\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU37, OH6 and OH7\n24-09, 24-164, 24-166, 24-167, 24-171, 24-172, 24-173, 24-175, 24-178, 24-180, 24-181, 24-183, 24-186, 24-187, 24-188, 24-189 and 24-190\nTo facilitate the construction of a new bridge to carry the realigned Muckingford Road over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space.\nWork No. 6B\n24-17, 24-22, 24-23, 24-27, 24-28, 24-29, 24-31 and 24-42\nProvision for access for overhead lines diversion works.\nWork No. OH5\n24-24 and 24-26\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU37\n24-34\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. OH6 and OH7\n24-43 and 24-49\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works.\nWorks Nos. MU36 and OH5\n24-45 and 24-62\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU34, MU36 and OH5\n24-46, 24-56, 24-59, 24-68, 24-90, 24-126, 24-129 and 24-130\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU36\n24-47, 24-48 and 24-74\nTo facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWork No. OH5\n24-53, 24-63, 24-67, 24-69, 24-80 and 24-81\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH5\n24-71\nTemporary possession of property, to facilitate the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU36\n24-82\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. OH5 and ULH12\n24-83, 24-92, 24-93, 24-98 and 24-99\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. OH3, OH4, OHT2 and OHT3\n24-84\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. OH3, OH4 and OHT2\n24-91\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU36, OH3, OH4 and OHT2\n24-95\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU28, MU36, MUT6, OH3, OH4, OHT2 and OHT3\n24-96, 24-103 and 24-105\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU36, OH4 and OHT2\n24-100\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU28, MU36, OH3, OH4, OHT2 and OHT3\n24-109\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU36, OH4, OHT2 and OHT3\n24-112 and 24-113\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU34 and OH4\n24-120, 24-121 and 24-123\nConstruction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 5W and OH4\n24-124\nConstruction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 5W, MU28, OH3 and OH4\n24-125 and 24-128\nTo facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWork No. OH3\n24-133, 24-192 and 24-193\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT6\n24-136\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; provision for access for overhead lines diversion works.\nWorks Nos. MU34, MU35, MU36, MUT6 and OH4\n24-139\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MUT6\n24-153\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU34\n24-191\nConstruction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 5W, MU28, MU34, MUT6, OH3 and OH4\n24-194, 24-195, 24-196, 24-197, 24-198 and 24-199\nConstruction of a new public right of way between the new public right of way underneath the Tilbury viaduct and footpath FP61.\nWork No. 5W\n25-01, 25-02, 25-03, 25-04, 25-05, 25-06, 25-07, 25-08, 25-09, 25-10, 25-11, 25-12, 25-13, 25-14, 25-15, 25-16, 25-17, 25-18, 25-19, 25-20, 25-21, 25-22, 25-23, 25-24, 25-25, 25-26, 25-27, 25-28, 25-29, 25-30, 25-31, 25-32, 25-33, 25-34, 25-35, 25-36, 25-37, 25-38, 25-39, 25-40, 25-41, 25-42, 25-43, 25-44, 25-45, 25-46, 25-47, 25-48, 25-49, 25-50, 25-51, 25-52, 25-53, 25-54, 25-55, 25-56, 25-57, 25-58, 25-59, 25-60, 25-61, 25-62, 25-63, 25-64, 25-65, 25-66, 25-67, 25-68, 25-69, 25-70, 25-71, 25-72, 25-73, 25-74, 25-75, 25-76, 25-77, 25-78, 25-81, 25-82, 25-83, 25-84, 25-85, 25-86, 25-87, 25-88, 25-89, 25-90, 25-91 and 25-92\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT14\n25-79 and 25-80\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MUT14\n25-93, 25-95, 25-98, 25-99, 25-101, 25-102, 25-106, 25-109 and 25-111\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU35\n26-17, 26-18, 26-19, 26-20, 26-21, 26-22, 26-23, 26-25, 26-26, 26-27, 26-28, 26-29, 26-30, 26-31, 26-32, 26-33, 26-35, 26-36, 26-37, 26-38, 26-39, 26-40, 26-41, 26-42, 26-44, 26-45, 26-46, 26-47, 26-48, 26-49, 26-50, 26-51, 26-52, 26-53, 26-54, 26-55, 26-56, 26-57, 26-58, 26-59, 26-60, 26-61, 26-62, 26-63, 26-64, 26-65 and 26-66\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT14\n26-24, 26-34 and 26-43\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MUT14\n27-01\nImplementation of environmental mitigation works to create a site for protected species.\nWorks Nos. E21 and E22\n27-02, 27-09, 27-11 and 27-12\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU37, OH6 and OH7\n27-06 and 27-16\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. OH6 and OH7\n27-07\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU37\n27-25, 27-27, 27-36, 27-37, 27-38 and 27-39\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU37\n27-35\nTo facilitate the construction new highway, three-lane dual carriageway, and to provide temporary storage, laydown areas and working space; provision for temporary access for overhead lines diversion works.\nWorks Nos. 6C and OH5\n27-40, 27-49, 27-52, 27-55, 27-56, 27-65 and 27-72\nProvision for temporary access for overhead lines diversion works\nWork No. OH5\n27-41, 27-42, 27-44, 27-51, 27-53 and 27-54\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH5\n27-45, 27-47, 27-48, 27-50, 27-57, 27-58, 27-59, 27-60, 27-61 and 27-62\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E21\n27-66\nTo facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWork No. OH4\n27-67, 27-68, 27-69, 27-71, 27-74, 27-75, 27-76, 27-80, 27-82, 27-96 and 27-101\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH4\n27-70\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; provision for temporary access for overhead lines diversion works.\nWorks Nos. OH4 and OH5\n27-77, 27-78, 27-79, 27-81, 27-83, 27-84, 27-86, 27-88, 27-89, 27-91, 27-92, 27-93, 27-94, 27-95, 27-98, 27-99, 27-100, 27-102 and 27-103\nProvision for access for overhead lines diversion works.\nWork No. OH4\n28-01\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4, OHT5 and ULH9\n28-02\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU47, MU48 and MUT16\n28-03, 28-13 and 28-15\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MUT16, MUT18, OH6 and OHT5\n28-04\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MU48, MUT16, MUT18, OH6 and OHT5\n28-05\nConstruction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 7S, CA7, MU40, MU41, MU47, MUT13, MUT16, MUT17 and MUT18\n28-06\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MUT16, MUT18, OH6, OH7, OHT4 and OHT5\n28-08\nTemporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA7, E28 and MU41\n28-09\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MU48, MUT16, MUT18, OH6, OH7 and OHT5\n28-11\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MU48, MUT16, MUT18 and OHT5\n28-12\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU47, MU48, MUT16 and MUT18\n28-14\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU47, MUT16 and MUT18\n28-16\nThe establishment of a temporary utilities logistic hub for facilitating utility works.\nWork No. ULH9\n28-21\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, OH6 and OHT5\n28-27 and 28-30\nConstruction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 7S, MU41 and MU47\n28-31\nConstruction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place.\nWork No. 7S\n28-34, 28-58, 28-104 and 28-107\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU40\n28-35\nConstruction of a new private means of access from the new Hornsby Lane turning head north of the new A122 Lower Thames Crossing to Heath Place; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 7S, MU41 and MU47\n28-37 and 28-39\nConstruction of a new Hornsby Lane turning heads to the north of the new A122 Lower Thames Crossing, including improvement to Hornsby Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 7S and MU47\n28-38, 28-98, 28-100 and 28-103\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU40 and MUT13\n28-42\nTemporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA6, E27, MU41 and MU47\n28-43\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU47\n28-45 and 28-46\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU41\n28-47 and 28-63\nTemporary construction compound at surface for facilitating main works.\nWork No. CA6\n28-49, 28-52, 28-53, 28-54, 28-56, 28-57, 28-59, 28-61, 28-69, 28-70, 28-71, 28-72 and 28-73\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor\nWork No. MUT14\n28-50 and 28-51\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU39 and MUT14\n28-60\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU40, MUT13, OH6 and OH7\n28-62\nTemporary construction compound at surface for facilitating main works; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. CA6 and ULH10\n28-64\nTemporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA6, E27 and MU41\n28-65 and 28-68\nConstruction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road.\nWork No. 7X\n28-67\nConstruction of a new private means of access from the improved Brentwood Road; and temporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. 7B, CA6, MU40, MU41, MUT12, MUT13, MUT15 and ULH10\n28-106\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU38, MU40, OH6 and OH7\n28-124\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G5, MU39, MU40, MUT12 and MUT15\n28-125\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor\nWorks Nos. MU39, MU40 and MUT12\n28-127\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU40 and MUT12\n28-128\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G5, MU40 and MUT12\n28-129\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU39 and MU40\n28-131\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU39, MU40 and MUT15\n28-132\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G5, MU39, MU40 and MUT15\n28-133\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU39 and MUT15\n28-134\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU40, MU41 and MUT12\n28-135\nProvision for access for utility works.\nWork No. MU40\n28-137\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU38 and MUT12\n28-139 and 28-141\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU38\n28-143\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. OH6 and OH7\n28-144\nInstallation of a high-pressure gas pipeline.\nWork No. G5\n28-145\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G5\n29-03\nTemporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. CA8A, E30, MU54, MU55, MU56, MUT20, OH6, OH7 and OHT6\n29-04\nImplementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. E30, MU55, MU56, MUT20, OH6 and OH7\n29-05\nThe establishment of a temporary utilities logistic hub for facilitating utility works.\nWork No. ULH8\n29-10\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU56\n29-11\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU55, MU56, MUT16, OH6, OH7 and OHT6\n29-13\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU56, OH6 and OHT6\n29-17\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6\n29-20\nTemporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. CA8A, MU55, MU56, MUT16, MUT20, OH6, OH7 and OHT6\n29-26\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH6\n29-29, 29-33, 29-39 and 29-51\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU44\n29-31\nOverhead lines diversion works, including the removal of existing overhead lines and pylons.\nWorks Nos. OH6 and OH7\n29-49\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MU55, MUT16, MUT20, OH6 and OH7\n29-61, 29-62, 29-63 and 29-65\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU52 and MUT13\n29-113\nImprovements to Woolings Close.\nWork No. 7G\n29-115\nImprovements to Woolings Close; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 7G and MU53\n29-140 and 29-211\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU53\n29-202 and 29-205\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU50\n29-212 and 29-215\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH7\n29-213\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MU49, MUT16, OH6 and OH7\n29-231, 29-238 and 29-242\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MU49, MUT16, MUT18, OH6 and OH7\n29-236 and 29-237\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU49 and OH7\n29-245, 29-251 and 29-256\nTo facilitate the construction of a realigned section of Rectory Road, and to provide temporary storage, laydown areas and working space.\nWork No. 7J\n29-247\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU49 and MUT18\n29-248\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU47, MU48, MUT16, MUT18, OH6, OH7, OHT4 and OHT5\n29-249 and 29-250\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU49\n29-258 and 29-268\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU41 and MUT13\n29-262 and 29-267\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU47 and MUT16\n29-263 and 29-266\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU47\n29-264\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU46\n29-277\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. OH6, OH7, OHT4 and OHT5\n29-282\nImplementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. E30 and MU57\n29-283\nImplementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. E30, MU54, MU55, MU57, MUT20 and OH6\n30-01, 30-02, 30-04, 30-05, 30-06, 30-07, 30-08, 30-09, 30-10 and 30-11\nProvision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; provision for temporary access for overhead lines diversion works.\nWorks Nos. CA13, E38, OH6 and OH7\n30-12, 30-14, 30-17, 30-19, 30-20, 30-21, 30-22, 30-23, 30-24, 30-25, 30-26, 30-27, 30-28, 30-29, 30-30, 30-31, 30-32, 30-33, 30-34, 30-35, 30-36, 30-37, 30-38, 30-39, 30-40, 30-41, 30-42, 30-43, 30-44, 30-45, 30-46, 30-47, 30-48, 30-49, 30-50, 30-51, 30-52, 30-53, 30-54, 30-55, 30-56, 30-57, 30-58, 30-59, 30-60, 30-61, 30-62, 30-63, 30-64, 30-65, 30-66, 30-67, 30-68, 30-69, 30-71, 30-72 and 30-73\nProvision for temporary access and traffic management for the temporary construction compound.\nWork No. CA9\n30-74, 30-75, 30-76, 30-77, 30-78, 30-79 and 30-80\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT23\n31-02, 31-08, 31-09, 31-13, 31-18 and 31-19\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G6\n31-05 and 31-06\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. G6 and ULH6\n31-07 and 31-11\nInstallation of a high-pressure gas pipeline.\nWork No. G6\n31-10, 31-14, 31-16, 31-17, 31-20, 31-21 and 31-22\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU42\n31-15\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G6 and MU42\n32-05 and 32-18\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU46\n32-07, 32-12, 32-13, 32-14, 32-57, 32-66, 32-92, 32-102, 32-115, 32-117, 32-119, 32-134, 32-137, 32-147, 32-149, 32-152 and 32-186\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G6\n32-11, 32-15, 32-16 and 32-17\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G6 and MU46\n32-25\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU46, MU47 and MUT17\n32-33, 32-35 and 32-36\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU47\n32-39, 32-44, 32-48, 32-55, 32-135, 32-157, 32-164 and 32-169\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU43\n32-49\nConstruction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 7X, MU41 and MU43\n32-53\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU41\n32-58 and 32-59\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G6 and MU45\n32-61\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU43\n32-63\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G6, MU45 and MUT19\n32-78, 32-81 and 32-85\nConstruction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road.\nWork No. 7X\n32-84\nConstruction of a new public right of way between the new bridge to carry the new public right of way over the new A122 Lower Thames Crossing and the realigned A1013 Stanford Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 7X and MU43\n32-91\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU43 and MUT19\n32-93\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G6 and MUT19\n32-103, 32-116, 32-118, 32-120, 32-130, 32-138, 32-143 and 32-144\nInstallation of a high-pressure gas pipeline.\nWork No. G6\n32-104\nProvision for temporary access for works involving the installation of a high-pressure gas pipeline.\nWork No. G6\n32-109\nTo facilitate the improvement to the existing dual carriageway A13, and to provide temporary storage, laydown areas and working space.\nWork No. 7F\n32-110\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT19\n32-111, 32-122, 32-124, 32-125, 32-128, 32-129 and 32-133\nProvision for access for works involving the installation of a high-pressure gas pipeline.\nWork No. G6\n32-136\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU39, MU43 and MUT15\n32-139, 32-140, 32-141, 32-142, 32-145, 32-148, 32-155, 32-159, 32-160, 32-168, 32-170, 32-171, 32-172, 32-173, 32-174 and 32-179\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU39 and MUT15\n32-153, 32-158 and 32-166\nProvision for access for works involving the diversion of existing gas pipeline.\nWork No. G6b\n32-156 and 32-163\nInstallation of a isolation valve\nWork No. G6b\n32-162, 32-165, 32-175, 32-176, 32-180 and 32-181\nProvision for temporary access for works involving the diversion of existing gas pipeline.\nWork No. G6b\n32-177 and 32-178\nProvision for access for environmental mitigation works to create a site for protected species.\nWork No. E22\n32-182 and 32-183\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. G6 and ULH6\n33-01 and 33-03\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works.\nWorks Nos. MUT24, OH6 and OH7\n33-02 and 33-08\nProvision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA9, MU60 and MUT23\n33-05\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. G6, MU55, MUT13, MUT24, OH6, OH7 and OHT7\n33-06, 33-92, 33-179, 33-242, 33-249, 33-254, 33-255, 33-257, 33-259, 33-263, 33-265, 33-268, 33-276, 33-280, 33-281, 33-282 and 33-285\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G6\n33-17\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. OH6, OH7 and OHT7\n33-19\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU57\n33-24\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT23\n33-30\nTemporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. CA9, MU55, MU57, MU58, OH6, OH7 and ULH7\n33-35\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU54, MU55, MU57, MUT20 and OH6\n33-36\nTemporary construction compound at surface for facilitating main works; implementation of environmental mitigation works to create a site for protected species; and installation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA10, E34, G6, MU55, MU60, MUT13, MUT21 and MUT22\n33-37\nTemporary construction compound at surface for facilitating main works. To facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWorks Nos. CA10 and G6\n33-42\nTo facilitate the construction of a new private means of access for maintenance of the new drainage structures and to provide temporary storage, laydown areas and working space.\nWork No. 8K\n33-47, 33-48, 33-49, 33-53, 33-54, 33-55, 33-56, 33-61, 33-82, 33-83, 33-84, 33-93, 33-94, 33-100, 33-101, 33-104, 33-106, 33-108, 33-115, 33-116, 33-118, 33-154, 33-155, 33-173, 33-178, 33-184, 33-188 and 33-221\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT22\n33-66\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU59 and MUT13\n33-67\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU59 and MU60\n33-68 and 33-70\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT21\n33-69, 33-71, 33-77, 33-78, 33-79, 33-80 and 33-81\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU59, MU60 and MUT21\n33-74 and 33-75\nTo facilitate the construction of a realigned section of Stifford Clays road, and to provide temporary storage, laydown areas and working space.\nWork No. 7L\n33-86, 33-88 and 33-89\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G6 and MUT22\n33-87\nImplementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. E33 and MUT22\n33-90, 33-91, 33-99, 33-103, 33-105, 33-107, 33-114, 33-119, 33-129, 33-134, 33-146, 33-152, 33-157, 33-158, 33-159, 33-160, 33-162, 33-165, 33-168, 33-169, 33-170, 33-172, 33-174, 33-176, 33-177, 33-181, 33-183, 33-187, 33-190, 33-192, 33-195, 33-196, 33-197, 33-199, 33-200, 33-202, 33-203, 33-205, 33-206, 33-208, 33-209, 33-210, 33-211, 33-212, 33-215, 33-217, 33-219, 33-220, 33-222, 33-225, 33-227, 33-228, 33-230, 33-231, 33-232, 33-233, 33-236, 33-238, 33-239, 33-240, 33-241, 33-243, 33-244, 33-245, 33-246, 33-247, 33-251, 33-252, 33-256, 33-258, 33-260, 33-261, 33-267, 33-269, 33-271, 33-272, 33-274, 33-275, 33-279, 33-283, 33-284, 33-286 and 33-287\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU60 and MUT21\n33-98\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT13\n33-109, 33-113, 33-117, 33-120, 33-121, 33-122, 33-123, 33-124, 33-125, 33-126, 33-127, 33-128, 33-130, 33-131, 33-132, 33-133, 33-135, 33-136, 33-137, 33-138, 33-139, 33-140, 33-141, 33-142, 33-143, 33-144, 33-145, 33-147, 33-148, 33-149, 33-150, 33-151, 33-153, 33-156, 33-161, 33-163, 33-164, 33-166, 33-167, 33-171, 33-180, 33-185 and 33-186\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU52\n33-110 and 33-112\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU52, MU60, MUT21 and MUT22\n33-175, 33-248, 33-250, 33-266, 33-270, 33-273 and 33-277\nInstallation of a high-pressure gas pipeline.\nWork No. G6\n33-182, 33-189 and 33-191\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU52 and MUT13\n33-194 and 33-229\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E32\n33-201 and 33-207\nImprovements to Woolings Close.\nWork No. 7G\n33-224, 33-226, 33-234, 33-235 and 33-237\nProvision for temporary access for works involving the installation of a high-pressure gas pipeline.\nWork No. G6\n33-253, 33-262 and 33-264\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G6, MU60 and MUT21\n33-278\nInstallation of a high-pressure gas pipeline; and; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G6 and MU46\n33-290\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU46\n34-01, 34-03 and 34-05\nProvision for temporary access and traffic management for the temporary construction compound; provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works.\nWorks Nos. CA13, E38, MUT24, OH6 and OH7\n34-02, 34-24 and 34-42\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT24\n34-04\nProvision for temporary access and traffic management for the temporary construction compound.\nWork No. CA13\n34-06, 34-15, 34-17, 34-19, 34-23, 34-25, 34-26, 34-41, 34-43, 34-47 and 34-48\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and provision for temporary access for overhead lines diversion works.\nWorks Nos. MUT24, OH6 and OH7\n34-20\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. G6 and ULH5\n34-27 and 34-28\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space; provision for temporary access to the temporary utilities logistic hub.\nWorks Nos. G6 and ULH5\n34-29, 34-32 and 34-46\nTo facilitate the installation of a high-pressure gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G6\n34-30, 34-31 and 34-45\nInstallation of a high-pressure gas pipeline.\nWork No. G6\n34-33, 34-38, 34-39 and 34-40\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT23\n34-44\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU60 and MUT23\n35-01, 35-03 and 35-07\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT24\n35-02\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH7\n35-05, 35-06, 35-19, 35-20, 35-21, 35-53, 35-54 and 35-56\nImplementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.\nWork No. E36\n35-09 and 35-55\nImplementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. E36 and OH7\n35-13\nImplementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area. Overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. E36, FCA3 and OH7\n35-29 and 35-30\nTemporary construction compound at surface for facilitating main works.\nWork No. CA11\n35-32\nTemporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA11, MUT13, MUT22 and MUT25\n35-33\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MUT22 and MUT25\n35-34 and 35-35\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT25\n35-36, 35-42, 35-58, 35-59 and 35-61\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT22\n36-01\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E38\n36-02\nProvision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA13, E38 and MUT24\n36-03\nProvision for access for environmental mitigation works to create a site for protected species.\nWork No. E38\n36-04\nProvision for temporary access and traffic management for the temporary construction compound.\nWork No. CA13\n36-05\nProvision for temporary access and traffic management for the temporary construction compound; and provision for access for environmental mitigation works to create a site for protected species.\nWorks Nos. CA13 and E38\n36-06\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT24\n37-05\nImplementation of environmental mitigation works to create a site for protected species.\nWorks Nos. E37 and E39\n37-06 and 37-07\nProvision for access for environmental mitigation works to create a site for protected species.\nWorks Nos. E37 and E39\n38-01\nConstruction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and temporary construction compound at surface for facilitating main works; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 8M, CA13, MU64, MU65, MUT26 and MUT27\n38-02 and 38-10\nTemporary construction compound at surface for facilitating main works.\nWork No. CA13\n38-03\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU64 and MUT27\n38-09\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU65\n38-13\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU65\n38-14 and 38-24\nProvision for temporary access and traffic management for the temporary construction compound; and implementation of environmental mitigation works to create a site for protected species.\nWorks Nos. CA13 and E40\n38-15\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU64\n38-16\nProvision for temporary access and traffic management for the temporary construction compound.\nWork No. CA13\n38-18\nTo facilitate the construction of a new public right of way over the new A122 Lower Thames Crossing, and to provide temporary storage, laydown areas and working space.\nWork No. 8C\n38-19\nTo facilitate the construction of a new drainage attenuation pond with associated drainage facilities, laydown areas and working space.\nWork No. 8H\n38-20\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU63\n38-22\nConstruction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and diversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 8M, G8, MU63 and OH7\n38-23\nTo facilitate the construction of a new public right of way and to provide temporary storage, laydown areas and working space.\nWork No. 8M\n38-25\nConstruction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 8M and OH7\n38-28 and 38-29\nConstruction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136.\nWork No. 8M\n38-31\nDiversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G8 and MU63\n38-32\nDiversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. G8, MU62, MU63, OH7, OHT8 and ULH4\n38-33\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU62, MU63 and OH7\n38-34\nProvision for access for environmental mitigation works to create a site for protected species.\nWork No. E40\n38-35\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. OH7 and OHT8\n38-36 and 38-39\nTo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G8\n38-37\nTo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. G8 and ULH4\n38-38\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH7\n38-40, 38-41, 38-42, 38-44, 38-46, 38-49, 38-51, 38-52, 38-59 and 38-64\nImplementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.\nWork No. E36\n38-43, 38-60, 38-61 and 38-65\nConstruction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.\nWorks Nos. 8J and E36\n38-47\nImplementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. E36, FCA4 and MU61\n38-53, 38-54 and 38-55\nImplementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds; construction of a new flood compensation area.\nWorks Nos. E36 and FCA3\n39-01\nTemporary construction compound at surface for facilitating main works.\nWork No. CA14\n39-02\nTo facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space To facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space.\nWorks Nos. 8D and G9\n39-04\nDiversion of existing gas pipeline.\nWork No. G9\n39-05, 39-14 and 39-15\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU71\n39-06 and 39-16\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU71\n39-08, 39-26 and 39-46\nTo facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space.\nWork No. 8D\n39-12\nConstruction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane.\nWork No. 8N\n39-13\nTemporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA14 and MUT29\n39-17, 39-18, 39-21, 39-27 and 39-28\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT29\n39-20\nConstruction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 8D and MUT29\n39-22 and 39-25\nTo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G9\n39-23\nDiversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G9, MU68, MU69 and MU70\n39-29\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MUT28 and MUT29\n39-30\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU69\n39-31 and 39-32\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT28\n39-33\nConstruction of a new public right of way from the realigned North Road to the new public right of way to Church Lane; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 8D, MUT28 and MUT29\n39-50, 39-52, 39-54, 39-55, 39-57 and 39-59\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU66\n39-65\nConstruction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 8M, MU69 and MUT26\n39-66\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU69 and MUT26\n39-67\nDiversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G9, MU69 and MUT27\n39-68\nTo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space To facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWorks Nos. G9 and MUT27\n39-69, 39-70 and 39-74\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MUT26\n39-72\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT27\n39-77\nTo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space.\nWork No. G8\n39-78\nDiversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G8, MU64 and MUT27\n39-80 and 39-81\nTo facilitate the construction of a three-lane carriageway northbound and two-lane carriageway southbound, and to provide temporary storage, laydown areas and working space.\nWork No. 8A\n39-82\nProvision for access for environmental mitigation works to create a site for protected species.\nWork No. E42\n39-83\nConstruction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and provision for access for environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 8M, E42 and MUT26\n39-84\nTemporary construction compound at surface for facilitating main works.\nWork No. CA13\n40-21\nTo facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space; and yo facilitate the diversion of existing gas pipeline, and to provide temporary storage, laydown areas and working space. To facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWorks Nos. 8D, G9 and MU71\n40-22\nDiversion of existing gas pipeline; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. G9 and MU71\n41-01 and 41-02\nProvision for access for environmental mitigation works to create a site for protected species.\nWork No. E42\n41-03\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E42\n41-04, 41-05, 41-08 and 41-32\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH7\n41-06, 41-07, 41-09, 41-15, 41-16, 41-18, 41-19, 41-25, 41-26 and 41-27\nProvision for temporary access for overhead lines diversion works.\nWork No. OH7\n41-10\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MUT26 and OH7\n41-11\nConstruction of a new public right of way between the new bridge to carry the realigned footpath FP136 and the new bridge to carry the realigned North Road; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 8M and MUT26\n41-13, 41-14, 41-44, 41-46, 41-47, 41-48, 41-49 and 41-51\nProvision for access for overhead lines diversion works.\nWork No. OH7\n41-23\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU63, MUT26 and OH7\n41-24\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU63 and OH7\n41-28, 41-29, 41-30, 41-31, 41-45 and 41-50\nTo facilitate overhead lines diversion works, and to provide temporary storage, laydown areas and working space.\nWork No. OH7\n41-33, 41-34, 41-35, 41-36, 41-37, 41-41 and 41-42\nImplementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.\nWork No. E36\n41-38 and 41-43\nConstruction of a new public right of way along the Mardyke channel, between south of the new Mardyke viaduct and the new public right of way; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.\nWorks Nos. 8J and E36\n41-39\nConstruction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136.\nWork No. 8M\n41-40\nConstruction of a new public right of way between the public right of way along the Mardyke channel and the new bridge to carry the realigned footpath FP136; and implementation of environmental mitigation works to create a site for protected species, including the construction of a new bat barn structure and new ecological ponds.\nWorks Nos. 8M and E36\n42-01, 42-02 and 42-03\nImplementation of environmental mitigation works to create a site for protected species.\nWork No. E43\n42-04 and 42-07\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU72\n42-05, 42-06 and 42-11\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU72, MU75 and MU76\n42-08 and 42-12\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU72 and MU76\n42-09, 42-10 and 42-13\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU72 and MU75\n42-14\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU72, MU73 and MU75\n42-16\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU75\n42-17 and 42-21\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU72\n42-22\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU75 and MU76\n42-23\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU75 and MUT30\n42-24\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU76, MU77 and MUT30\n42-25\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU75, MU76 and MUT30\n42-34\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU73\n42-75\nTo facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space.\nWork No. 9E\n42-99 and 42-124\nTemporary possession of the railway line railway to facilitate the construction of a new bridge to carry a new public right of way over the existing Upminster and Grays Branch railway line.\nWork No. 9M\n42-115\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU73, MU74 and MU76\n42-116\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU74\n42-127\nTo facilitate the improvement works to the existing North Road, and to provide temporary storage, laydown areas and working space.\nWork No. 8D\n42-128\nConstruction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane; and temporary construction compound at surface for facilitating main works.\nWorks Nos. 8N and CA14\n42-131, 42-132, 42-133 and 42-134\nProvision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA15A and MU76\n42-135, 42-136 and 42-137\nProvision for temporary access and traffic management for the temporary construction compound.\nWork No. CA15A\n42-138\nConstruction of a new public right of way between the new public right of way heading westwards of North Road and Church Lane.\nWork No. 8N\n42-139, 42-140, 42-141, 42-142, 42-143, 42-144, 42-145, 42-146, 42-147, 42-148, 42-149, 42-150, 42-151, 42-152, 42-153, 42-154, 42-155, 42-156, 42-157, 42-158, 42-159, 42-160, 42-161, 42-162, 42-163, 42-164, 42-165, 42-166, 42-167, 42-168, 42-169, 42-170, 42-171, 42-172, 42-173, 42-174, 42-175, 42-177, 42-178, 42-179, 42-180, 42-181, 42-182, 42-184 and 42-185\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT28\n42-176 and 42-183\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MUT28 and MUT29\n43-01, 43-02, 43-03 and 43-05\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU72\n43-07\nConstruction of a new permissive path over the new A122 Lower Thames Crossing and the improved section of the M25 Junction; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 9O, MU72, MU78 and OH8\n43-09 and 43-108\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU72, MU78 and OH8\n43-10\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU72\n43-18 and 43-104\nConstruction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 9O, MU72, MU78 and OH8\n43-19\nConstruction of a new permissive path from Thames Chase Forest, and a new private means of access from Thames Chase Forest to the new culvert; implementation of environmental mitigation works to create a site for protected species; utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. 9O, E46, MU72 and OH8\n43-27\nLandscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing.\nWork No. 9O\n43-28\nConstruction of a new permissive path along the existing FP230, and landscaping associated with the new public right of way and permissive path over the new A122 Lower Thames Crossing.\nWork No. 9O\n43-35, 43-47, 43-53, 43-106, 43-107, 43-109 and 43-110\nOverhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWork No. OH8\n43-40, 43-41, 43-43, 43-46, 43-63, 43-64, 43-65, 43-66, 43-67, 43-68, 43-69, 43-70, 43-71, 43-72, 43-73, 43-74, 43-75, 43-76, 43-77, 43-78, 43-79, 43-80, 43-82, 43-83, 43-84, 43-85, 43-86, 43-87, 43-88, 43-90, 43-93, 43-94, 43-95, 43-98, 43-101, 43-102, 43-112, 43-113 and 43-114\nProvision for temporary access and traffic management for the temporary construction compound.\nWork No. CA15A\n43-49\nConstruction of a new permissive path along the existing FP230.\nWork No. 9O\n43-54, 43-55, 43-56, 43-57, 43-58, 43-59, 43-60, 43-61, 43-62, 43-81, 43-89, 43-91 and 43-92\nProvision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA15A and MUT28\n43-96, 43-97, 43-99 and 43-100\nProvision for access for overhead lines diversion works.\nWork No. OH8\n43-103\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MUT28\n43-105\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and overhead lines diversion works, including the removal of existing overhead lines and pylons, construction of new overhead lines and pylons and works to existing overhead lines and pylons.\nWorks Nos. MU72 and OH8\n43-111\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU78\n44-01, 44-02, 44-03 and 44-06\nConstruction of a new flood compensation area.\nWork No. FCA7\n44-04\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU87\n44-05\nConstruction of a new flood compensation area; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. FCA7 and MU72\n44-07\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU83\n44-08\nConstruction of a new permissive path from Thames Chase Forest, a new permissive path to the new culvert and a new private means of access from Thames Chase Forest to the new culvert; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 9O and MU72\n44-09 and 44-17\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU79, MU80, MU82 and MU83\n44-10, 44-44 and 44-84\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU80\n44-11\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU86\n44-13, 44-14 and 44-94\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU72\n44-16 and 44-90\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU84\n44-20\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU83\n44-22 and 44-56\nTemporary possession of railway line to facilitate the construction of earthworks associated with the new A122 Lower Thames Crossing two-lane link road from the M25 northbound carriageway to M25 junction 29 link road.\nWork No. 9D\n44-64, 44-72 and 44-73\nTo facilitate the improvements to the existing highway M25 northbound and existing highway M25 southbound, and to provide temporary storage, laydown areas and working space.\nWork No. 9E\n44-68\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU81 and MU84\n44-80\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU81 and MU83\n44-81\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU72, MU79, MU81, MU82 and MU83\n44-85, 44-87 and 44-93\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU72\n44-86 and 44-91\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU72, MU79, MU80, MU81, MU82 and MU83\n44-88\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU72, MU79, MU80 and MU82\n44-89, 44-95 and 44-96\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU80 and MU81\n44-92\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU84\n44-98, 44-99 and 44-100\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU81\n44-101, 44-102, 44-103, 44-104, 44-105, 44-106, 44-107, 44-108, 44-109, 44-110, 44-111, 44-113, 44-114, 44-115, 44-116, 44-117, 44-118 and 44-119\nProvision for temporary access and traffic management for the temporary construction compound.\nWork No. CA15A\n44-112, 44-120, 44-121, 44-122, 44-123 and 44-124\nProvision for access for utility works.\nWork No. MU84\n45-01, 45-02, 45-03, 45-04, 45-05, 45-06, 45-07, 45-09, 45-12, 45-39, 45-43, 45-45, 45-46, 45-69 and 45-70\nImprovement works to a section of the existing two-lane dual carriageway A127 highway.\nWork No. 9J\n45-08, 45-15, 45-16, 45-17, 45-18, 45-20, 45-22, 45-28, 45-67 and 45-68\nTo facilitate the improvement works to a section of the existing two-lane dual carriageway A127 highway, and to provide temporary storage, laydown areas and working space.\nWork No. 9J\n45-10, 45-11, 45-19, 45-21, 45-23, 45-24, 45-25, 45-26, 45-29, 45-31, 45-33, 45-38, 45-42, 45-50, 45-52 and 45-62\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU91\n45-47, 45-48 and 45-49\nImprovements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout.\nWork No. 9H\n45-66\nImprovements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 9H and MU91\n45-71\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU88\n45-72\nImprovements to the existing two-lane link road between A127 eastbound and M25 junction 29 roundabout; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 9H and MU88\n45-79, 45-88 and 45-107\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU87\n45-87, 45-89 and 45-108\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers.\nWork No. MU87\n45-99 and 45-100\nImprovement works to the existing private means of access between the improved M25 junction 29 roundabout and Codham Hall Lane.; utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. 9I and MU88\n45-105\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU88\n45-110 and 45-112\nProvision for access for utility works.\nWork No. MU87\n45-111\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers.\nWorks Nos. MU86 and MU87\n45-120\nConstruction of protection measures for retention of the existing infrastructure.\nWork No. 9P\n45-121\nTemporary construction compound at surface for facilitating main works; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor, and the installation of poles and pole mounted transformers.\nWorks Nos. CA16, MU85, MU87 and MUT32\n45-132\nTemporary construction compound at surface for facilitating main works.\nWork No. CA16\n45-137, 45-139, 45-141, 45-143, 45-144, 45-145, 45-146, 45-147, 45-148, 45-149, 45-150, 45-151, 45-152, 45-153, 45-154, 45-159, 45-161, 45-164, 45-166, 45-167, 45-178, 45-179 and 45-180\nProvision for temporary access and traffic management for the temporary construction compound.\nWork No. CA16\n45-155 and 45-160\nProvision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA16, MU85 and MUT32\n45-158\nProvision for temporary access and traffic management for the temporary construction compound; and utility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. CA16 and MU85\n45-165, 45-168, 45-171, 45-172, 45-173 and 45-174\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU85\n45-169\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWorks Nos. MU85 and MUT32\n45-175, 45-176 and 45-177\nProvision for access for utility works.\nWork No. MU84\n46-01, 46-02 and 46-03\nImprovement works to a section of the existing two-lane dual carriageway A127 highway.\nWork No. 9J\n46-04\nImplementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.\nWork No. E51\n46-06\nImplementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds Installation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. E51, G10 and ULH2\n46-08, 46-09, 46-11, 46-12 and 46-13\nInstallation of a high-pressure gas pipeline.\nWork No. G10\n46-23, 46-24 and 46-25\nProvision for access for utility works.\nWork No. MU92\n46-26\nUtility works, including the installation or diversion of underground utilities within a multi-utility corridor.\nWork No. MU92\n46-52\nTo facilitate utility works, and to provide temporary storage, laydown areas and working space.\nWork No. MU92\n46-55\nInstallation of a high-pressure gas pipeline; and the establishment of a temporary utilities logistic hub for facilitating utility works.\nWorks Nos. G10 and ULH2\n47-26\nImplementation of environmental mitigation works to create a site for protected species, including the construction of new ecological ponds.\nWork No. E51",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 11 in force at 15.4.2025, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/462/schedule/11",
    "retrieved_at": "2026-10-28T21:17:22.632908+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}