Article 2
In this Order—
(1)
all measurements of distance are measured along the route of the relevant highway;
(2)
—
(i)
“the new road” means the new highway which the Secretary of State proposes to construct along the route described in Schedule 1 to this Order;
(ii)
“the plan” means the plan numbered HA/10/NOD/007, containing a plan marked “The A138 (Replacement Chelmer Viaduct) (Trunking) Order 2014”, signed by authority of the Secretary of State for Transport and deposited at ODPM-DfT Records Management Branch, Floor 13 (IMD), Ashdown House, St Leonards on Sea, Hastings, East Sussex TN37 7GA.