{
  "url": "https://openlegislation.uk/a14-cambridge-to-huntingdon-improvement-scheme-development-consent-order-2016/schedule-2/paragraph-3",
  "json_url": "https://openlegislation.uk/a14-cambridge-to-huntingdon-improvement-scheme-development-consent-order-2016/schedule-2/paragraph-3.json",
  "legislation": "uksi/2016/547",
  "legislation_title": "The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016",
  "legislation_url": "https://openlegislation.uk/a14-cambridge-to-huntingdon-improvement-scheme-development-consent-order-2016",
  "path": "schedule/2/paragraph/3",
  "kind": "paragraph",
  "number": "3",
  "heading": "Preparation of detailed design, etc.",
  "text": "(1) The authorised development must be designed in detail and carried out so that it is compatible with the preliminary scheme design shown on the works plans and the engineering section drawings unless otherwise agreed in writing by the Secretary of State following consultation with the relevant planning authority on matters related to its functions and provided that the Secretary of State is satisfied that any amendments to the works plans and the engineering section drawings showing departures from the preliminary design would not give rise to any materially new or materially worse adverse environmental effects in comparison with those reported in the environmental statement.\n(2) Where amended details are approved by the Secretary of State under sub-paragraph (1), those details are deemed to be substituted for the corresponding works plans or engineering section drawings and the undertaker must make those amended details available in electronic form for inspection by members of the public.\n(3) No part of the authorised development is to commence until options for the detailed design of that part of the authorised development have been submitted to the Design Council’s Design Review panel and the undertaker has received and considered the advice of the Design Council’s Design Review panel in respect of the detailed design of that part of the authorised development.\n(4) The undertaker must, in the course of developing the detailed design of the authorised development, consult with the relevant planning authorities, the Parish Forums, the Community Forums, the Landowner Forums and the Environment Forum in accordance with the provisions of the code of construction practice.\n(5) No part of the authorised development is to commence until details of the external appearance of the viaduct to be constructed as Work No. 5(gg) have been submitted to and approved in writing by the Secretary of State, following consultation with the relevant planning authority.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 3 in force at 1.6.2016, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2016/547/schedule/2/paragraph/3",
    "retrieved_at": "2026-10-28T23:23:51.675993+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}