# The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016, Paragraph 5: A1 Southbound Link to A14

Extent: E+W

A 1.8 kilometre length of new highway to be classified as part of the A1 Trunk Road commencing from a point 373 metres north of the centre point of where the southbound carriageway of the existing A1 Trunk Road passes under the proposed overbridge to be constructed to carry the C167 Grafham Road over the existing A1 Trunk Road, and continuing in a southerly and then south-easterly direction over the proposed A14 Trunk Road to be constructed, to where it merges with the eastbound carriageway of the proposed A14 Trunk Road, at a point 528 metres south east of the centre point of where it passes over the realigned B1514 Buckden Road,
identified by a red line on the classification of roads plans - sheet 1.

---
Source: https://www.legislation.gov.uk/uksi/2016/547/schedule/3/paragraph/5 (the official version)
Page: https://openlegislation.uk/a14-cambridge-to-huntingdon-improvement-scheme-development-consent-order-2016/schedule-3/paragraph-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

