# The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016, Schedule 5: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Extent: E+W

(1)
Plot Reference Number shown on land plans
(2)
Purpose for which rights over land may be acquired
The land plans – sheet 1
-
None
The land plans – sheet 2
2/1aa, 2/1j, 2/1s, 2/1w and 2/5b
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
New right of access to land (plot 3/14a) with or without vehicles plant and machinery for the benefit of Farmland Reserve UK Limited, Manor Farm, Church End, Woodwalton, Huntingdon, PE28 5YU (and their successors in title).
New right of access to land (plots 2/11d, 3/6c and 3/9a) with or without vehicles plant and machinery for the benefit of Angus George Lammie of Church Farm, Tempsford, Sandy, SG19 2AN (and his successors in title).
2/1k and 2/4c
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
New right of access to land (plot 3/14a) with or without vehicles plant and machinery for the benefit of Farmland Reserve UK Limited, Manor Farm, Church End, Woodwalton, Huntingdon, PE28 5YU (and their successors in title).
2/11b
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
New right of access to land (plot 3/14a) with or without vehicles plant and machinery for the benefit of Farmland Reserve UK Limited, Manor Farm, Church End, Woodwalton, Huntingdon, PE28 5YU (and their successors in title).
The land plans – sheet 3
3/1d, 3/6b, 3/7b, and 3/9b
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
New right of access to land (plot 3/14a) with or without vehicles plant and machinery for the benefit of Farmland Reserve UK Limited, Manor Farm, Church End, Woodwalton, Huntingdon, PE28 5YU (and their successors in title).
3/14b and 3/15b
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
The land plans – sheet 4
4/6a
New right to construct, use, protect, inspect and maintain a water pipeline and equipment for the benefit of Anglian Water Services Ltd.
The land plans – sheet 5
5/4b, 5/5b and 5/22b
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
5/7
New right of access to environmental mitigation land (plot 5/2c) with or without vehicles, plant and machinery for the benefit of the undertaker.
5/12a
New right to construct, use, protect, inspect and maintain a water pipeline and equipment for the benefit of Anglian Water Services Ltd.
New right to install, inspect and maintain a new electricity power line and equipment for the benefit of UK Power Networks Holdings Ltd.
The land plans – sheet 6
-
None
The land plans – sheet 7
-
None
The land plans – sheet 8
8/7d
New right to construct, use, protect, inspect and maintain a water pipeline and equipment for the benefit of Anglian Water Services Ltd.
8/17b, 8/19b, 8/22b, 8/25a, 8/21k and 8/21n
New right to construct and maintain a new track to access the new River Great Ouse viaduct, drainage attenuation pond and outfalls, and environmental mitigation land (plot8/21l) with or without vehicles, plant and machinery for the benefit of the undertaker.
The land plans – sheet 9
9/2c, 9/2g and 9/4b
New right to construct and maintain a new track to access the new River Great Ouse viaduct and drainage outfalls with or without vehicles plant and machinery for the benefit of the undertaker.
9/10
New right to construct, use and maintain a drainage outfall for the benefit of the undertaker.
9/16b
New right to construct, use and maintain a bridge over the East Coast Mainline Railway for the benefit of the undertaker.
9/6, 9/7, 9/8, 9/9, 9/11, 9/11a, 9/11b, 9/12c and 9/14
New right to construct and maintain a new track to access the River Great Ouse viaduct and drainage attenuation pond with or without vehicles plant and machinery for the benefit of the undertaker.
The land plans – sheet 10
10/4e
New right to construct a new track and to access with or without vehicles plant and machinery for the benefit of Church Commissioners For England, 27 Great Smith Street, London, SW1P 3AZ (and their successors in title) in respect of Wybosten Farm.
10/7b
New right to construct a new track and to access with or without vehicles plant and machinery for the benefit of Anthony William Carr and David Gordon Carr of Offord Hill Farm, Offord Road, Godmanchester, Huntingdon, PE29 2LD (and their successors in title) in respect of Offord Hill Farm.
The land plans – sheet 11
-
None
The land plans – sheet 12
12/11a
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
12/6e, 12/12c
New right to construct a new track and to access with or without vehicles plant and machinery for the benefit of Church Commissioners For England of 27 Great Smith Street, London, SW1P 3AZ (and their successors in title) of Debden Farm.
The land plans – sheet 13
13/2a
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
The land plans – sheet 14
-
None
The land plans – sheet 15
15/11d, 15/11e, 15/18b and 15/18d
New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of National Grid Gas Plc.
The land plans – sheet 16
16/2c, 16/3b, 16/3d and 16/3e
New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of National Grid Gas Plc.
16/17c and 16/19b
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
The land plans – sheet 17
17/10c
New right to use and maintain a new track and to access with or without vehicles plant and machinery for the benefit of Vanda Farbon of West End Farm, Fenstanton, Huntingdon, Cambridgeshire, PE19 6SZ; Angela Fiona Winter of Springfields Cottage, Hemingford Abbots, Huntingdon, PE28 9AD; and, Melanie Sadler of Oakington Garden Centre, Dry Drayton Road, Oakington, Cambridge, CB24 3BD (and their successors in title) in respect of New Barns Farm, New Barns Lane, Conington.
17/4c and 17/10a
New right to construct, inspect and maintain a new buried water pipeline and equipment for the benefit of Cambridge Water Plc.
17/8b
New right to install, inspect and maintain a new electricity power line and equipment for the benefit of UK Power Networks Holdings Ltd.
The land plans – sheet 18
18/2a, 18/6c and 18/6d
New right to construct, inspect and maintain a new buried water pipeline and equipment for the benefit of Cambridge Water Plc.
18/2c and 18/2e
New right of access to land with or without vehicles plant and machinery for the benefit of Vanda Farbon of West End Farm, Fenstanton, Huntingdon, Cambridgeshire, PE19 6SZ; Angela Fiona Winter of Springfields Cottage, Hemingford Abbots, Huntingdon, PE28 9AD; and, Melanie Sadler of Oakington Garden Centre, Dry Drayton Road, Oakington, Cambridge, CB24 3BD (and their successors in title) in respect of New Barns Farm, New Barns Lane, Conington.
18/6b
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
New right of access to land with or without vehicles, plant and machinery for the benefit of Samuel Henry Swaine of Friesland Farm, Huntingdon Road, Conington, Cambridge CB23 4NU (and his successors in title) in respect of Friesland Farm.
18/6f
New right to construct, use, protect, inspect and maintain a new buried gas pipeline and equipment for the benefit of National Grid Gas Plc.
The land plans – sheet 19
-
None
The land plans – sheet 20
20/1d and 20/2a
New right to construct, use, protect, inspect and maintain new buried utilities equipment for the benefit of Cambridge Water Plc and National Grid Gas Plc.
20/15b, 20/22a, and 20/23a
New right to construct, use, protect, inspect and maintain new buried utilities equipment for the benefit of Cambridge Water Plc, National Grid Gas Plc and Anglian Water Services Ltd.
20/2h
New right to construct, use, protect, inspect and maintain a new buried gas pipeline and equipment for the benefit of National Grid Gas Plc.
The land plans – sheet 21
21/4j and 21/9a
New right to construct and maintain a new track to drainage attenuation ponds and to access with or without vehicles plant and machinery for the benefit of the undertaker.
New right of access for the benefit of Cambridge Water Plc and National Grid Gas Plc.
21/4f, 21/4h and 21/10f
New right to construct, use, protect, inspect and maintain a new gas pipeline and equipment for the benefit of National Grid Gas Plc.
The land plans – sheet 22
22/4b, 22/6a, 22/7a, 22/8a, and 22/12c
New right to construct, use and maintain a new permissive non-motorised user route for the benefit of Cambridgeshire County Council.
New right to construct, inspect and maintain a new buried water pipeline and equipment for the benefit of Cambridge Water Plc.
New right to construct, inspect and maintain new buried foul water pipelines and equipment for the benefit of Anglian Water Services Ltd.
New right to construct, inspect and maintain new buried gas pipeline and equipment for the benefit of National Grid Gas Plc.
22/3c, 22/10a, 22/11a, 22/11c and 22/17b
New right to install, inspect and maintain a new electricity power line and equipment for the benefit of UK Power Networks Holdings Ltd.
22/6c, 22/7b and 22/12b
New right to construct, inspect and maintain new buried gas pipeline and equipment for the benefit of National Grid Gas Plc.
The land plans – sheet 23
23/15d
New right to construct, inspect and maintain new buried water pipelines and equipment for the benefit of Cambidge Water Plc.
The land plans – sheet 24
24/1e, 24/3m, 24/9c and 24/10c
New right to use land to access with or without vehicles plant and machinery the new A14 Westbound Link for the benefit of the undertaker.
24/3h
New right to construct, inspect and maintain with or without vehicles plant and machinery new buried drainage outfall pipes to Beck Brook including outfall control structures and equipment for the benefit of the undertaker.
24/3f and 24/3n
New right to construct, inspect and maintain new buried water pipelines and equipment for the benefit of Cambridge Water Plc.
The land plans – sheet 25
-
None
The land plans – sheet 26
-
None
The land plans – sheet 27
27/7a
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
27/1g, 27/8, 27/9a, 27/10, 27/17b, and 27/18a
New right to construct and maintain a new track to overhead gantries and to access with or without vehicles plant and machinery for the benefit of the undertaker.
The land plans – sheet 28
28/2a
New right to construct and maintain a new track to drainage attenuation ponds and areas of flood compensation and to access with or without vehicles plant and machinery for the benefit of the undertaker.
28/1g, 28/1k, 28/8c, and 28/11a
New right to construct, inspect and maintain new buried foul water pipelines and equipment for the benefit of Anglian Water Services Ltd.
The land plans – sheet 29
-
None
The land plans – sheet 30
-
None
The land plans – sheet 31
-
None
The land plans – sheet 32
-
None
The land plans – sheet 33
-
None
The land plans – sheet 34
34/22
New right to construct, use and maintain a new drainage outfall for the benefit of Cambridgeshire County Council.
34/35a
New right to construct, use and maintain a new drainage outfall and attenuation tank for the benefit of Cambridgeshire County Council.
The land plans – sheet 35
-
None
The land plans – sheet 36
-
None
The land plans – sheet 37
-
None
The land plans – sheet 38
-
None
The land plans – sheet 39
-
None
The land plans – sheet 40
40/6e and 40/12
New right to construct, use, protect, inspect, access and maintain a new gas pipeline and equipment for the benefit of National Grid Gas Plc.

---
Source: https://www.legislation.gov.uk/uksi/2016/547/schedule/5 (the official version)
Page: https://openlegislation.uk/a14-cambridge-to-huntingdon-improvement-scheme-development-consent-order-2016/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

