  "url": "https://openlegislation.uk/a14-cambridge-to-huntingdon-improvement-scheme-development-consent-order-2016/schedule-7",
  "json_url": "https://openlegislation.uk/a14-cambridge-to-huntingdon-improvement-scheme-development-consent-order-2016/schedule-7.json",
  "legislation": "uksi/2016/547",
  "legislation_title": "The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016",
  "legislation_url": "https://openlegislation.uk/a14-cambridge-to-huntingdon-improvement-scheme-development-consent-order-2016",
  "path": "schedule/7",
  "kind": "schedule",
  "number": "7",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)\nLocation\n(2)\nPlot Reference Number(s) shown on land plans\n(3)\nPurpose for which temporary possession may be taken\n(4)\nRelevant part of the authorised development\nThe land plans – sheet 1\nIn the administrative\narea of Huntingdonshire District Council\n1/1q, 1/1r, 1/1s, and 1/1t\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\n1/1a, 1/1b, 1/1c, 1/1d, 1/1e, 1/1g, 1/1h, 1/1j, 1/1k, 1/1l, 1/1m, 1/1n, 1/1o,1/1p, 1/1u, 1/1v,1/1w and 1/1x\nHighway land required for improvement works to the A1(M).\nWork No. 1\nThe land plans – sheet 2\nIn the administrative\narea of Huntingdonshire District Council\n2/1a, 2/1b, 2/1c, 2/1e and 2/1g\nHighway land required for improvement works to the A1(M).\nWork No.1\n2/1p and 2/4a\nRequired to provide working space for the works associated with the construction of a new access track to drainage attenuation facilities.\nWork No. 1\n2/9d and 2/11d\nRequired for the provision of soil storage areas.\nWork No. 1\n2/12b\nRequired to provide working space and temporary access for works associated with the construction of the new Woolley Road and the improvement of A1(T)\nWorks Nos. 1 and 2\nThe land plans – sheet 3\nIn the administrative\narea of Huntingdonshire District Council\n3/2b\nRequired to provide working space and temporary access for works associated with the construction of the new Woolley Road and the improvement of A1(T)\nWorks Nos. 1 and 2\n3/5b\nRequired for the provision of a temporary access route from Woolley Road to Borrow Pits comprising Works Nos. 4.1 and 4.2.\nWorks Nos. 4.1 and 4.2\n3/6d\nRequired for the provision of soil storage areas.\nWork No. 1\n3/6e and 3/7d\nRequired to provide working space and temporary access for works associated with the construction of drainage attenuation facilities and flood plain compensation areas on adjacent land.\nWork No. 1\n3/5c\nRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area.\nWork No. 1\nThe land plans – sheet 4\nIn the administrative\narea of Huntingdonshire District Council\n4/1a, 4/1b, 4/1c, 4/1d, 4/1e, 4/1f, 4/1g, 4/1h, 4/1j, 4/1l, 4/1m, 4/1r, 4/1s, 4/1t, 4/3 and 4/4\nHighway land required for improvement works to the A14(T).\nWork No. 5\n4/2a\nRequired for the provision of a temporary access route from Woolley Road to Borrow Pits comprising Work Nos. 4.1 and 4.2.\nWorks Nos. 4.1 and 4.2\nThe land plans – sheet 5\nIn the administrative\narea of Huntingdonshire District Council\n5/1al\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange.\nWork No. 5\n5/1w, 5/1ag, 5/5e, 5/33b and 5/34\nRequired to provide working space and temporary access for works associated with the improvement of A1(T).\nWork No. 1\n5/23c\nRequired to provide working space and temporary access for works associated with the construction of the new Ellington Junction.\nWorks Nos. 3 and 5\n5/25b\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange and to provide working space and temporary access for works associated with the construction of the improved A1(T).\nWorks Nos.1 and 5\n5/2a\nRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area.\nWork No. 1\n5/23b\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.\nAll Works.\n5/38g\nRequired for the construction of a new private means of access to High Harthay Farm.\nWorks Nos. 3 and 5\n5/5j and 5/22c\nRequired to provide working space and temporary access for works associated with the construction of an access track to drainage attenuation facilities and flood plain compensation area on adjacent land.\nWork No. 1\nThe land plans – sheet 6\nIn the administrative\narea of Huntingdonshire District Council\n6/22a\nRequired for the construction of a new private means of access to High Harthay Farm.\nWorks Nos. 3 and 5\n6/16b, 6/18, 6/19, 6/20 and 6/21\nRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.\nWorks Nos. 1 and 5\nThe land plans – sheet 7\nIn the administrative\narea of Huntingdonshire District Council\n7/6b, 7/6c and 7/8a\nRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.\nWorks Nos. 1 and 5\n7/1j, 7/4b, 7/7b, 7/7c, 7/7d, 7/11c, 7/11d, and 7/16b\nRequired for the provision of soil storage areas and to provide working space and temporary access for works associated with the construction of the new A14(T), the improved A1(T), Brampton Interchange and the new Grafham Road.\nWorks Nos. 1, 5, 6 and 7\n7/10, 7/11f, 7/12, 7/13a, 7/13d, 7/20 and 7/21\nRequired for the improvement of Grafham Road and the byway known as Mere Lane.\nWorks Nos. 1 and 6\n7/13c\nRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.\nWorks Nos. 1 and 7\n7/9b and 7/9c\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.\nAll Works.\nThe land plans – sheet 8\nIn the administrative\narea of Huntingdonshire District Council\n8/1d, 8/1e, 8/1f, 8/2, 8/3a and 8/6\nRequired for the improvement of the byway known as Mere Lane.\nWork No. 1\n8/5b and 8/5c\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.\nAll Works.\n8/1n, 8/5d and 8/7b\nRequired for the provision of soil storage areas.\nWorks Nos. 5, 7, 8, 9 and 10\n8/7c\nRequired to provide working space and temporary access for works associated with the improvement of Brampton Road.\nWork No.10\n8/17b, 8/19b, 8/22b and 8/25a\nRequired for the provision of a temporary access route from Brampton Road to a soil storage area.\nWork No. 5\n8/21e and 8/21m\nRequired for the provision of soil storage areas and to provide working space and temporary access for works associated with the construction of the new A14(T).\nWork No. 5\n8/21c and 8/21b\nRequired to provide working space and temporary access for works associated with the improvement of a private means of access to Lodge Farm.\nWorks No. 5\n8/21h\nRequired to provide working space and temporary access for works associated with the improvement of an access track on adjacent land and for works associated with the construction of flood compensation areas on adjacent land.\nWorks Nos. 5 and 10\n8/21j and 8/31b\nRequired to provide working space and temporary access for works associated with the construction of flood compensation areas on adjacent land.\nWorks Nos. 5 and 10\n8/32a and 8/32b\nRequired to provide working space and temporary access for works associated with the provision of environmental mitigation.\nWork No. 5\nThe land plans – sheet 9\nIn the administrative\narea of Huntingdonshire District Council\n9/2a\nRequired to provide working space and temporary access for works associated with the construction of the new River Great Ouse viaduct.\nWork No. 5\n9/2d\nRequired to provide working space and temporary access for works associated with the improvement of an access track on adjacent land and for works associated with the construction of flood plain compensation areas on adjacent land.\nWorks Nos. 5 and 10\nThe land plans – sheet 10\nIn the administrative\narea of Huntingdonshire District Council\n10/2a, 10/4c and 10/4f\nRequired for the provision of soil storage areas and working space and temporary access for the provision of new private means of access.\nWorks Nos. 5 and 11\n10/7c\nRequired for the provision of an accommodation track for Wybosten Farm.\nWork No. 5\n10/9\nRequired to provide working space and temporary access for the diversion of utility equipment on adjacent land.\nWork No. 53\nThe land plans – sheet 11\nIn the administrative\narea of Huntingdonshire District Council\n11/2b, 11/8d and 11/9\nRequired for the provision of soil storage areas.\nWorks Nos. 5, 12 and 13\n11/6b and 11/8a\nRequired for the provision of soil storage areas and to provide working space and temporary access for works associated with the provision of ecological mitigation.\nWorks Nos. 5, 12 and 13\nThe land plans – sheet 12\nIn the administrative\narea of Huntingdonshire District Council\n12/2a, 12/2c, 12/6b and 12/6c\nRequired for the provision of soil storage areas.\nWorks Nos. 5 and 13\n12/5b, 12/8b, and 12/10b\nRequired for the provision of soil storage areas and for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.\nWorks Nos. 5 and 13\n12/11c and 12/13b\nRequired for the construction of a new private means of access and accommodation track.\nWork No. 13\n12/12a\nRequired for the construction of a new private means of access and to provide working space and temporary access for works associated with the construction of the new Ermine Street Junction.\nWork No. 13\nThe land plans – sheet 13\nIn the administrative\narea of Huntingdonshire District Council\n13/3b\nRequired for the provision of soil storage areas.\nWorks Nos. 5 and 14\n13/7\nRequired to provide working space and temporary access for works associated with the improvement of Mere Way.\nWork No.14\nThe land plans – sheet 14\nIn the administrative\narea of Huntingdonshire District Council\n14/2b\nRequired to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.\nWorks Nos. 5 and 15\nThe land plans – sheet 15\nIn the administrative\narea of Huntingdonshire District Council\n15/1a, 15/1b, 15/18a and 15/18e\nRequired to provide working space and temporary access for works associated with the stopping up of Conington Road and the construction of the new Conington Road.\nWork No. 17\n15/11c\nRequired to provide working space and temporary access for works associated with the provision of ecological mitigation.\nWorks Nos. 5 and 16\n15/9b, 15/11b and 15/16b\nRequired for the provision accommodation tracks.\nWorks Nos. 5 and 16\n15/19a\nRequired to provide working space and temporary access for works associated with the provision of new private means of access.\nWork No.17\nThe land plans – sheet 16\nIn the administrative\nareas of Huntingdonshire District Council and South Cambridgeshire District Council\n16/1a, 16/1b, 16/1c, 16/1d and 16/1g\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\n16/8a, 16/8b, 16/12b, 16/12c and 16/14c\nRequired for the works associated with the stopping up of Footpaths 87/6, 87/14 and 53/1.\nWork No. 5\n16/3c, 16/5b and 16/7b\nRequired for the construction of a new private means of access and accommodation track.\nWork No. 17\n16/3f\nRequired for working space and temporary access for the diversion of utility equipment.\nWork No. 63\n16/9b and 16/12d\nRequired for the construction of a new private means of access.\nWork No. 17\n16/21a, 16/21b and 16/22\nRequired to provide working space and temporary access for works associated with the stopping up of Footpath 53/2.\nWork No. 5\nThe land plans – sheet 17\nIn the administrative\narea of South Cambridgeshire District Council\n17/1a, 17/1b, 17/1e and 17/1f.\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\nIn the administrative\narea of South Cambridgeshire District Council\n17/4d, 17/6.\nRequired to provide an ecological mitigation area.\nWork No. 5\nThe land plans – sheet 18\nIn the administrative\narea of South Cambridgeshire District Council\n18/6e\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.\nAll Works.\nThe land plans – sheet 19\nIn the administrative\narea of South Cambridgeshire Council\n19/10b, 19/11 and 19/12b\nRequired to enable the strengthening of Boxworth Road to provide access to Borrow Pit comprising Work No. 4.12 and associated soil storage areas.\nWork No. 4.12\nThe land plans – sheet 20\nIn the administrative\narea of South Cambridgeshire District Council\n20/2d, 20/3 and 20/4a\nRequired to enable the strengthening of Boxworth Road to provide access to Borrow Pit 4.12 and associated soil storage areas.\nWork No. 4.12\n20/5\nRequired to enable the strengthening of Boxworth Road to provide access to Borrow Pit Work No. 4.12 and associated soil storage areas, and for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.\nAll Works.\n20/2b and 20/6b\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.\nAll Works.\n20/13e and 20/13d\nRequired to provide working space and temporary access for the diversion of utility equipment on adjacent land.\nWork Nos. 5, 71, 81 and 82\n20/16b, 20/16c, 20/18a, 20/18b, 20/21b and 20/21c\nRequired to provide working space and temporary access for the works associated with the construction of the new footway, cycle track and equestrian track associated with the new Local Access Road.\nWork No. 22\n20/25d\nRequired to provide working space and temporary access for works associated with the construction of flood compensation areas on adjacent land.\nWork No. 5\nThe land plans – sheet 21\nIn the administrative\narea of South Cambridgeshire District Council\n21/2b and 21/5a\nRequired to provide working space for works in connection with the diversion of pipes associated with the Sewage Works.\nWork No. 72\n21/8b\nRequired for the provision of soil storage areas.\nWork No. 5\n21/10b\nRequired for the provision of soil storage areas.\nWorks No. 5 and 23\nThe land plans – sheet 22\n22/17e, 22/27d and 22/28c\nRequired to provide working space and temporary access for works associated with the construction of flood plain compensation areas on adjacent land.\nWorks Nos. 5 and 22\n22/17d\nRequired for the provision of soil storage areas.\nWorks Nos. 5, 22 and 24\n22/17f, 22/27b, and 22/28b\nRequired for the construction of a new private means of access.\nWork Nos. 5\n22/28d\nRequired to provide working space for works associated with the new Local Access Road.\nWork No.22\nThe land plans – sheet 23\nIn the administrative\narea of South Cambridgeshire District Council\n23/2b\nRequired for working space for the works associated with the protection of existing utilities.\nWorks Nos. 5\n23/10b\nRequired for the provision of soil storage areas.\nWorks Nos. 5, 25, and 26\n23/8b, 23/8c and 23/13a\nRequired to enable the construction of a new private means of access to Hackers Fruit Farm.\nWork No. 27\n23/6b\nRequired to provide working space for the works associated with the construction of the new Cambridge Crematorium Access Road and new Local Access Road between Oakington Road and Huntingdon Road.\nWork No. 27\n23/14b\nRequired to enable the construction of a new private means of access to Cambridge Crematorium.\nWork No. 27\n23/20b\nRequired for working space for the works associated with the protection of existing utilities.\nWork No. 26\nThe land plans – sheet 24\nIn the administrative\narea of South Cambridgeshire District Council\n24/3b and 24/3c\nRequired for working space for the works associated with the protection of existing utilities.\nWork No. 27\n24/3d, 24/3j and 24/3k\nRequired to provide working space for the works associated with the construction of the new Local Access Road between Oakington Road and Huntingdon Road.\nWork No. 27\n24/3g and 24/9a\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste, and to provide working space for works associated with the construction of a new Local Access Road between Oakington Road and Huntingdon Road and the construction of drainage attenuation facilities.\nAll Works.\n24/7a\nRequired for working space for the works associated with the protection of existing utilities.\nWork No. 26\n24/10a\nRequired for the provision of soil storage areas.\nWorks No. 27 and 29\n24/10e\nRequired for the works associated with the stopping up of Footpath 99/7.\nWork No. 27\nThe land plans – sheet 25\nIn the administrative\narea of South Cambridgeshire District Council\n25/2a\nRequired for the provision of soil storage areas.\nWorks No. 27 and 29\n25/7b\nRequired for working space for the works associated with the protection of existing of utilities.\nWork No. 26\nThe land plans – sheet 26\nIn the administrative\narea of South Cambridgeshire District Council\n26/2a\nRequired for working space for the works associated with the protection of existing utilities.\nWork No. 26\n26/32b, 26/34a, 26/35, 26/36 and 26/37a\nRequired for the provision of soil storage areas and for working space for the works associated with the diversion of utilities.\nWorks Nos. 33 and 84\n26/40b\nRequired to provide working space for the works associated with the improvement of Histon Junction and the diversion of utilities.\nWorks Nos. 33 and 86\nThe land plans – sheet 27\nIn the administrative\narea of South Cambridgeshire District Council\n27/17a and 27/18b\nRequired to provide working space and temporary access for the works associated with the provision of new private means of access.\nWork No. 33\nThe land plans – sheet 28\nIn the administrative\narea of South Cambridgeshire District Council\n28/2c and 28/7a\nRequired to provide working space and temporary access for the works associated with the improvement of the A14(T) Cambridge Northern Bypass and associated environmental mitigation.\nWork No. 33\n28/1h and 28/8b\nRequired to provide working space and temporary access for the works associated with the improvement of the A14(T) Cambridge Northern Bypass including associated environmental mitigation and the diversion of utilities.\nWorks Nos. 33 and 87\nThe land plans – sheet 29\nNone\n-\n-\n-\nThe land plans – sheet 30\nIn the administrative\narea of Huntingdonshire District Council\n30/1a, 30/1d, 30/1e, 30/1f and 30/1g\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\nThe land plans – sheet 31\nIn the administrative\narea of Huntingdonshire District Council\n31/1a, 31/1b, 31/1c, 31/1d, and 31/1e.\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\nThe land plans – sheet 32\nIn the administrative\narea of Huntingdonshire District Council\n32/1a, 32/1b, 32/1c, 32/1d, 32/1e, 32/1f, 32/1g, 32/1h, 32/1j, 32/1k, 32/1l, 32/1m, 32/1n, 32/1o, 32/1p, 32/1q, 32/1r, 32/1s, 32/1t, 32/1u, 32/1v, 32/2 and 32/3, 32/4\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton, and between Huntingdon and Brampton Hut Interchange.\nWork No. 5\nThe land plans – sheet 33\nIn the administrative\narea of Huntingdonshire District Council\n33/1b, 33/1e, 33/1f, 33/1g, 33/1h, 33/1j, 33/1k, 33/1l, 33/1m, 33/1n, 33/2, 33/3, 33/4, 33/5a, 33/5b, 33/6 and 33/7\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange.\nWork No. 5\nThe land plans – sheet 34\nIn the administrative\narea of Huntingdonshire District Council\n34/1a, 34/1b, 34/1c, 34/1d, 34/1g, 34/1ah, 34/1aj and 34/1ak\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\n34/1k, 34/1l, 34/1n, 34/1o, 34/1p, 34/4b, 34/4c, 34/25b, 34/31b and 34/32b\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton, the stopping up of the A14(T) in Huntingdon and to provide working space and temporary access for works in connection with the demolition of the Huntingdon A14 viaduct.\nWorks Nos. 5, 35 and 36\n34/49b, 34/55, 34/51b and 34/51c\nRequired to provide working space and temporary access for works associated with the construction of the new Mill Common Link Road and the improvement of the existing Mill Common Road.\nWorks Nos. 36 and 37\n34/5b\nRequired to provide working space and temporary access for works associated with the construction of the new Views Common Link Road.\nWork No. 34\n34/5c, 34/10 and 34/11a\nRequired to provide working space for works associated with the construction of new private means of access to Cambridgeshire Constabulary HQ from the new Views Common Link Road.\nWork No. 34\n34/6b, 34/12 and 34/13\nHighway land required for improvement works to the Brampton Road to Hinchingbrooke Park Road Link.\nWorks Nos. 34 and 35\n34/34c\nRequired to provide working space for the isolation of a gas main associated with the construction of the new Views Common Link.\nWork No. 36\n34/23 and 34/25f\nRequired to provide working space and temporary access for works associated with the improvement of B1514 Brampton Road.\nWork No. 35\nThe land plans – sheets 35\nIn the administrative\narea of Huntingdonshire District Council\n35/1a, 35/1b, 35/1c, 35/1d, 35/1e, 35/1f, 35/1g, 35/1h, 35/1j, 35/1k, 35/1l, 35/1m, 35/1n, 35/1o, 35/1p, 35/1q, 35/1r, 35/1s, 35/1t, 35/1u, 35/1v, 35/1w, 35/1x, 35/1y, 35/1z, 35/2, 35/3 35/4 and 35/5\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\nThe land plans – sheet 36\nIn the administrative\narea of Huntingdonshire District Council\n36/1a, 36/1b, 36/1c, 36/1d, 36/1e, 36/1f, 36/1g, 36/1h, 36/1j, 36/1l, 36/1m 36/1n and 36/1o,\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\nThe land plans – sheet 37\nIn the administrative\narea of Huntingdonshire District Council\n37/1a, 37/1b, 37/1c, 37/1d, 37/1e, 37/1f, 37/1g, 37/1h, 37/1j, 37/1k, 37/1l, 37/1m, 37/1n and 37/2\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\nThe land plans – sheet 38\nIn the administrative\narea of Huntingdonshire District Council\n38/1a, 38/1b, 38/1c, 38/1d, 38/1e, 38/1f, 38/1g, 38/1h, 38/1j, 38/1k, 38/1l, 38/1m, 38/1n, 38/1o and 38/2\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No. 5\nThe land plans – sheet 39\nIn the administrative\narea of Huntingdonshire District Council\n39/1a, 39/1b, 39/1c, 39/1d, 39/1e, 39/1g, 39/1h, 39/1j, 39/1k, 39/1l, 39/1m, 39/1n, 39/1o, 39/1p, 39/1q, 39/1r and 39/2\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No.5\nThe land plans – sheet 40\nIn the administrative\nareas of Huntingdonshire District Council and South Cambridgeshire District Council\n40/1a, 40/1b, 40/1c, 40/1e, 40/1f, 40/1g, 40/1h, 40/1j, 40/1k, 40/1l, 40/1m, 40/1n, 40/1o, 40/1p, 40/1q, 40/1s, 40/1t, 40/1u, 40/2, 40/3 and 40/4\nRequired for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.\nWork No.5\n40/8, 40/12, 40/9a, 40/10b, 40/11b and 40/11c\nRequired for the works associated with the stopping up of Footpath 87/6 and 87/14.\nWork No. 17\n40/6d\nRequired for the construction of an accommodation track.\nWork No.17\n40/6f\nRequired for working space and temporary access for the diversion of utility equipment.\nWork No.63",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 7 in force at 1.6.2016, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2016/547/schedule/7",
    "retrieved_at": "2026-10-28T23:23:51.675993+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}