# The A14 Cambridge to Huntingdon Improvement Scheme Development Consent Order 2016, Schedule 7: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Extent: E+W

(1)
Location
(2)
Plot Reference Number(s) shown on land plans
(3)
Purpose for which temporary possession may be taken
(4)
Relevant part of the authorised development
The land plans – sheet 1
In the administrative
area of Huntingdonshire District Council
1/1q, 1/1r, 1/1s, and 1/1t
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
1/1a, 1/1b, 1/1c, 1/1d, 1/1e, 1/1g, 1/1h, 1/1j, 1/1k, 1/1l, 1/1m, 1/1n, 1/1o,1/1p, 1/1u, 1/1v,1/1w and 1/1x
Highway land required for improvement works to the A1(M).
Work No. 1
The land plans – sheet 2
In the administrative
area of Huntingdonshire District Council
2/1a, 2/1b, 2/1c, 2/1e and 2/1g
Highway land required for improvement works to the A1(M).
Work No.1
2/1p and 2/4a
Required to provide working space for the works associated with the construction of a new access track to drainage attenuation facilities.
Work No. 1
2/9d and 2/11d
Required for the provision of soil storage areas.
Work No. 1
2/12b
Required to provide working space and temporary access for works associated with the construction of the new Woolley Road and the improvement of A1(T)
Works Nos. 1 and 2
The land plans – sheet 3
In the administrative
area of Huntingdonshire District Council
3/2b
Required to provide working space and temporary access for works associated with the construction of the new Woolley Road and the improvement of A1(T)
Works Nos. 1 and 2
3/5b
Required for the provision of a temporary access route from Woolley Road to Borrow Pits comprising Works Nos. 4.1 and 4.2.
Works Nos. 4.1 and 4.2
3/6d
Required for the provision of soil storage areas.
Work No. 1
3/6e and 3/7d
Required to provide working space and temporary access for works associated with the construction of drainage attenuation facilities and flood plain compensation areas on adjacent land.
Work No. 1
3/5c
Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area.
Work No. 1
The land plans – sheet 4
In the administrative
area of Huntingdonshire District Council
4/1a, 4/1b, 4/1c, 4/1d, 4/1e, 4/1f, 4/1g, 4/1h, 4/1j, 4/1l, 4/1m, 4/1r, 4/1s, 4/1t, 4/3 and 4/4
Highway land required for improvement works to the A14(T).
Work No. 5
4/2a
Required for the provision of a temporary access route from Woolley Road to Borrow Pits comprising Work Nos. 4.1 and 4.2.
Works Nos. 4.1 and 4.2
The land plans – sheet 5
In the administrative
area of Huntingdonshire District Council
5/1al
Required for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange.
Work No. 5
5/1w, 5/1ag, 5/5e, 5/33b and 5/34
Required to provide working space and temporary access for works associated with the improvement of A1(T).
Work No. 1
5/23c
Required to provide working space and temporary access for works associated with the construction of the new Ellington Junction.
Works Nos. 3 and 5
5/25b
Required for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange and to provide working space and temporary access for works associated with the construction of the improved A1(T).
Works Nos.1 and 5
5/2a
Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area.
Work No. 1
5/23b
Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.
All Works.
5/38g
Required for the construction of a new private means of access to High Harthay Farm.
Works Nos. 3 and 5
5/5j and 5/22c
Required to provide working space and temporary access for works associated with the construction of an access track to drainage attenuation facilities and flood plain compensation area on adjacent land.
Work No. 1
The land plans – sheet 6
In the administrative
area of Huntingdonshire District Council
6/22a
Required for the construction of a new private means of access to High Harthay Farm.
Works Nos. 3 and 5
6/16b, 6/18, 6/19, 6/20 and 6/21
Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.
Works Nos. 1 and 5
The land plans – sheet 7
In the administrative
area of Huntingdonshire District Council
7/6b, 7/6c and 7/8a
Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.
Works Nos. 1 and 5
7/1j, 7/4b, 7/7b, 7/7c, 7/7d, 7/11c, 7/11d, and 7/16b
Required for the provision of soil storage areas and to provide working space and temporary access for works associated with the construction of the new A14(T), the improved A1(T), Brampton Interchange and the new Grafham Road.
Works Nos. 1, 5, 6 and 7
7/10, 7/11f, 7/12, 7/13a, 7/13d, 7/20 and 7/21
Required for the improvement of Grafham Road and the byway known as Mere Lane.
Works Nos. 1 and 6
7/13c
Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.
Works Nos. 1 and 7
7/9b and 7/9c
Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.
All Works.
The land plans – sheet 8
In the administrative
area of Huntingdonshire District Council
8/1d, 8/1e, 8/1f, 8/2, 8/3a and 8/6
Required for the improvement of the byway known as Mere Lane.
Work No. 1
8/5b and 8/5c
Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.
All Works.
8/1n, 8/5d and 8/7b
Required for the provision of soil storage areas.
Works Nos. 5, 7, 8, 9 and 10
8/7c
Required to provide working space and temporary access for works associated with the improvement of Brampton Road.
Work No.10
8/17b, 8/19b, 8/22b and 8/25a
Required for the provision of a temporary access route from Brampton Road to a soil storage area.
Work No. 5
8/21e and 8/21m
Required for the provision of soil storage areas and to provide working space and temporary access for works associated with the construction of the new A14(T).
Work No. 5
8/21c and 8/21b
Required to provide working space and temporary access for works associated with the improvement of a private means of access to Lodge Farm.
Works No. 5
8/21h
Required to provide working space and temporary access for works associated with the improvement of an access track on adjacent land and for works associated with the construction of flood compensation areas on adjacent land.
Works Nos. 5 and 10
8/21j and 8/31b
Required to provide working space and temporary access for works associated with the construction of flood compensation areas on adjacent land.
Works Nos. 5 and 10
8/32a and 8/32b
Required to provide working space and temporary access for works associated with the provision of environmental mitigation.
Work No. 5
The land plans – sheet 9
In the administrative
area of Huntingdonshire District Council
9/2a
Required to provide working space and temporary access for works associated with the construction of the new River Great Ouse viaduct.
Work No. 5
9/2d
Required to provide working space and temporary access for works associated with the improvement of an access track on adjacent land and for works associated with the construction of flood plain compensation areas on adjacent land.
Works Nos. 5 and 10
The land plans – sheet 10
In the administrative
area of Huntingdonshire District Council
10/2a, 10/4c and 10/4f
Required for the provision of soil storage areas and working space and temporary access for the provision of new private means of access.
Works Nos. 5 and 11
10/7c
Required for the provision of an accommodation track for Wybosten Farm.
Work No. 5
10/9
Required to provide working space and temporary access for the diversion of utility equipment on adjacent land.
Work No. 53
The land plans – sheet 11
In the administrative
area of Huntingdonshire District Council
11/2b, 11/8d and 11/9
Required for the provision of soil storage areas.
Works Nos. 5, 12 and 13
11/6b and 11/8a
Required for the provision of soil storage areas and to provide working space and temporary access for works associated with the provision of ecological mitigation.
Works Nos. 5, 12 and 13
The land plans – sheet 12
In the administrative
area of Huntingdonshire District Council
12/2a, 12/2c, 12/6b and 12/6c
Required for the provision of soil storage areas.
Works Nos. 5 and 13
12/5b, 12/8b, and 12/10b
Required for the provision of soil storage areas and for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.
Works Nos. 5 and 13
12/11c and 12/13b
Required for the construction of a new private means of access and accommodation track.
Work No. 13
12/12a
Required for the construction of a new private means of access and to provide working space and temporary access for works associated with the construction of the new Ermine Street Junction.
Work No. 13
The land plans – sheet 13
In the administrative
area of Huntingdonshire District Council
13/3b
Required for the provision of soil storage areas.
Works Nos. 5 and 14
13/7
Required to provide working space and temporary access for works associated with the improvement of Mere Way.
Work No.14
The land plans – sheet 14
In the administrative
area of Huntingdonshire District Council
14/2b
Required to provide working space and temporary access for works associated with the construction of a flood plain compensation area on adjacent land.
Works Nos. 5 and 15
The land plans – sheet 15
In the administrative
area of Huntingdonshire District Council
15/1a, 15/1b, 15/18a and 15/18e
Required to provide working space and temporary access for works associated with the stopping up of Conington Road and the construction of the new Conington Road.
Work No. 17
15/11c
Required to provide working space and temporary access for works associated with the provision of ecological mitigation.
Works Nos. 5 and 16
15/9b, 15/11b and 15/16b
Required for the provision accommodation tracks.
Works Nos. 5 and 16
15/19a
Required to provide working space and temporary access for works associated with the provision of new private means of access.
Work No.17
The land plans – sheet 16
In the administrative
areas of Huntingdonshire District Council and South Cambridgeshire District Council
16/1a, 16/1b, 16/1c, 16/1d and 16/1g
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
16/8a, 16/8b, 16/12b, 16/12c and 16/14c
Required for the works associated with the stopping up of Footpaths 87/6, 87/14 and 53/1.
Work No. 5
16/3c, 16/5b and 16/7b
Required for the construction of a new private means of access and accommodation track.
Work No. 17
16/3f
Required for working space and temporary access for the diversion of utility equipment.
Work No. 63
16/9b and 16/12d
Required for the construction of a new private means of access.
Work No. 17
16/21a, 16/21b and 16/22
Required to provide working space and temporary access for works associated with the stopping up of Footpath 53/2.
Work No. 5
The land plans – sheet 17
In the administrative
area of South Cambridgeshire District Council
17/1a, 17/1b, 17/1e and 17/1f.
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
In the administrative
area of South Cambridgeshire District Council
17/4d, 17/6.
Required to provide an ecological mitigation area.
Work No. 5
The land plans – sheet 18
In the administrative
area of South Cambridgeshire District Council
18/6e
Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.
All Works.
The land plans – sheet 19
In the administrative
area of South Cambridgeshire Council
19/10b, 19/11 and 19/12b
Required to enable the strengthening of Boxworth Road to provide access to Borrow Pit comprising Work No. 4.12 and associated soil storage areas.
Work No. 4.12
The land plans – sheet 20
In the administrative
area of South Cambridgeshire District Council
20/2d, 20/3 and 20/4a
Required to enable the strengthening of Boxworth Road to provide access to Borrow Pit 4.12 and associated soil storage areas.
Work No. 4.12
20/5
Required to enable the strengthening of Boxworth Road to provide access to Borrow Pit Work No. 4.12 and associated soil storage areas, and for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.
All Works.
20/2b and 20/6b
Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste.
All Works.
20/13e and 20/13d
Required to provide working space and temporary access for the diversion of utility equipment on adjacent land.
Work Nos. 5, 71, 81 and 82
20/16b, 20/16c, 20/18a, 20/18b, 20/21b and 20/21c
Required to provide working space and temporary access for the works associated with the construction of the new footway, cycle track and equestrian track associated with the new Local Access Road.
Work No. 22
20/25d
Required to provide working space and temporary access for works associated with the construction of flood compensation areas on adjacent land.
Work No. 5
The land plans – sheet 21
In the administrative
area of South Cambridgeshire District Council
21/2b and 21/5a
Required to provide working space for works in connection with the diversion of pipes associated with the Sewage Works.
Work No. 72
21/8b
Required for the provision of soil storage areas.
Work No. 5
21/10b
Required for the provision of soil storage areas.
Works No. 5 and 23
The land plans – sheet 22
22/17e, 22/27d and 22/28c
Required to provide working space and temporary access for works associated with the construction of flood plain compensation areas on adjacent land.
Works Nos. 5 and 22
22/17d
Required for the provision of soil storage areas.
Works Nos. 5, 22 and 24
22/17f, 22/27b, and 22/28b
Required for the construction of a new private means of access.
Work Nos. 5
22/28d
Required to provide working space for works associated with the new Local Access Road.
Work No.22
The land plans – sheet 23
In the administrative
area of South Cambridgeshire District Council
23/2b
Required for working space for the works associated with the protection of existing utilities.
Works Nos. 5
23/10b
Required for the provision of soil storage areas.
Works Nos. 5, 25, and 26
23/8b, 23/8c and 23/13a
Required to enable the construction of a new private means of access to Hackers Fruit Farm.
Work No. 27
23/6b
Required to provide working space for the works associated with the construction of the new Cambridge Crematorium Access Road and new Local Access Road between Oakington Road and Huntingdon Road.
Work No. 27
23/14b
Required to enable the construction of a new private means of access to Cambridge Crematorium.
Work No. 27
23/20b
Required for working space for the works associated with the protection of existing utilities.
Work No. 26
The land plans – sheet 24
In the administrative
area of South Cambridgeshire District Council
24/3b and 24/3c
Required for working space for the works associated with the protection of existing utilities.
Work No. 27
24/3d, 24/3j and 24/3k
Required to provide working space for the works associated with the construction of the new Local Access Road between Oakington Road and Huntingdon Road.
Work No. 27
24/3g and 24/9a
Required for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste, and to provide working space for works associated with the construction of a new Local Access Road between Oakington Road and Huntingdon Road and the construction of drainage attenuation facilities.
All Works.
24/7a
Required for working space for the works associated with the protection of existing utilities.
Work No. 26
24/10a
Required for the provision of soil storage areas.
Works No. 27 and 29
24/10e
Required for the works associated with the stopping up of Footpath 99/7.
Work No. 27
The land plans – sheet 25
In the administrative
area of South Cambridgeshire District Council
25/2a
Required for the provision of soil storage areas.
Works No. 27 and 29
25/7b
Required for working space for the works associated with the protection of existing of utilities.
Work No. 26
The land plans – sheet 26
In the administrative
area of South Cambridgeshire District Council
26/2a
Required for working space for the works associated with the protection of existing utilities.
Work No. 26
26/32b, 26/34a, 26/35, 26/36 and 26/37a
Required for the provision of soil storage areas and for working space for the works associated with the diversion of utilities.
Works Nos. 33 and 84
26/40b
Required to provide working space for the works associated with the improvement of Histon Junction and the diversion of utilities.
Works Nos. 33 and 86
The land plans – sheet 27
In the administrative
area of South Cambridgeshire District Council
27/17a and 27/18b
Required to provide working space and temporary access for the works associated with the provision of new private means of access.
Work No. 33
The land plans – sheet 28
In the administrative
area of South Cambridgeshire District Council
28/2c and 28/7a
Required to provide working space and temporary access for the works associated with the improvement of the A14(T) Cambridge Northern Bypass and associated environmental mitigation.
Work No. 33
28/1h and 28/8b
Required to provide working space and temporary access for the works associated with the improvement of the A14(T) Cambridge Northern Bypass including associated environmental mitigation and the diversion of utilities.
Works Nos. 33 and 87
The land plans – sheet 29
None
-
-
-
The land plans – sheet 30
In the administrative
area of Huntingdonshire District Council
30/1a, 30/1d, 30/1e, 30/1f and 30/1g
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
The land plans – sheet 31
In the administrative
area of Huntingdonshire District Council
31/1a, 31/1b, 31/1c, 31/1d, and 31/1e.
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
The land plans – sheet 32
In the administrative
area of Huntingdonshire District Council
32/1a, 32/1b, 32/1c, 32/1d, 32/1e, 32/1f, 32/1g, 32/1h, 32/1j, 32/1k, 32/1l, 32/1m, 32/1n, 32/1o, 32/1p, 32/1q, 32/1r, 32/1s, 32/1t, 32/1u, 32/1v, 32/2 and 32/3, 32/4
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton, and between Huntingdon and Brampton Hut Interchange.
Work No. 5
The land plans – sheet 33
In the administrative
area of Huntingdonshire District Council
33/1b, 33/1e, 33/1f, 33/1g, 33/1h, 33/1j, 33/1k, 33/1l, 33/1m, 33/1n, 33/2, 33/3, 33/4, 33/5a, 33/5b, 33/6 and 33/7
Required for all purposes associated with the de-trunking of the existing A14(T) between Huntingdon and Brampton Hut Interchange.
Work No. 5
The land plans – sheet 34
In the administrative
area of Huntingdonshire District Council
34/1a, 34/1b, 34/1c, 34/1d, 34/1g, 34/1ah, 34/1aj and 34/1ak
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
34/1k, 34/1l, 34/1n, 34/1o, 34/1p, 34/4b, 34/4c, 34/25b, 34/31b and 34/32b
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton, the stopping up of the A14(T) in Huntingdon and to provide working space and temporary access for works in connection with the demolition of the Huntingdon A14 viaduct.
Works Nos. 5, 35 and 36
34/49b, 34/55, 34/51b and 34/51c
Required to provide working space and temporary access for works associated with the construction of the new Mill Common Link Road and the improvement of the existing Mill Common Road.
Works Nos. 36 and 37
34/5b
Required to provide working space and temporary access for works associated with the construction of the new Views Common Link Road.
Work No. 34
34/5c, 34/10 and 34/11a
Required to provide working space for works associated with the construction of new private means of access to Cambridgeshire Constabulary HQ from the new Views Common Link Road.
Work No. 34
34/6b, 34/12 and 34/13
Highway land required for improvement works to the Brampton Road to Hinchingbrooke Park Road Link.
Works Nos. 34 and 35
34/34c
Required to provide working space for the isolation of a gas main associated with the construction of the new Views Common Link.
Work No. 36
34/23 and 34/25f
Required to provide working space and temporary access for works associated with the improvement of B1514 Brampton Road.
Work No. 35
The land plans – sheets 35
In the administrative
area of Huntingdonshire District Council
35/1a, 35/1b, 35/1c, 35/1d, 35/1e, 35/1f, 35/1g, 35/1h, 35/1j, 35/1k, 35/1l, 35/1m, 35/1n, 35/1o, 35/1p, 35/1q, 35/1r, 35/1s, 35/1t, 35/1u, 35/1v, 35/1w, 35/1x, 35/1y, 35/1z, 35/2, 35/3 35/4 and 35/5
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
The land plans – sheet 36
In the administrative
area of Huntingdonshire District Council
36/1a, 36/1b, 36/1c, 36/1d, 36/1e, 36/1f, 36/1g, 36/1h, 36/1j, 36/1l, 36/1m 36/1n and 36/1o,
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
The land plans – sheet 37
In the administrative
area of Huntingdonshire District Council
37/1a, 37/1b, 37/1c, 37/1d, 37/1e, 37/1f, 37/1g, 37/1h, 37/1j, 37/1k, 37/1l, 37/1m, 37/1n and 37/2
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
The land plans – sheet 38
In the administrative
area of Huntingdonshire District Council
38/1a, 38/1b, 38/1c, 38/1d, 38/1e, 38/1f, 38/1g, 38/1h, 38/1j, 38/1k, 38/1l, 38/1m, 38/1n, 38/1o and 38/2
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No. 5
The land plans – sheet 39
In the administrative
area of Huntingdonshire District Council
39/1a, 39/1b, 39/1c, 39/1d, 39/1e, 39/1g, 39/1h, 39/1j, 39/1k, 39/1l, 39/1m, 39/1n, 39/1o, 39/1p, 39/1q, 39/1r and 39/2
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No.5
The land plans – sheet 40
In the administrative
areas of Huntingdonshire District Council and South Cambridgeshire District Council
40/1a, 40/1b, 40/1c, 40/1e, 40/1f, 40/1g, 40/1h, 40/1j, 40/1k, 40/1l, 40/1m, 40/1n, 40/1o, 40/1p, 40/1q, 40/1s, 40/1t, 40/1u, 40/2, 40/3 and 40/4
Required for all purposes associated with the de-trunking of the existing A14(T) between Alconbury and Fen Drayton.
Work No.5
40/8, 40/12, 40/9a, 40/10b, 40/11b and 40/11c
Required for the works associated with the stopping up of Footpath 87/6 and 87/14.
Work No. 17
40/6d
Required for the construction of an accommodation track.
Work No.17
40/6f
Required for working space and temporary access for the diversion of utility equipment.
Work No.63

---
Source: https://www.legislation.gov.uk/uksi/2016/547/schedule/7 (the official version)