# The A160/A180 (Port of Immingham Improvement) Development Consent Order 2015, Schedule 5: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Extent: E+W

(1)
Plot reference number shown on Land Plans
(2)
Purpose for which rights over land may be acquired
Land Plans – Sheet 1
1/1a, 1/1u, 1/1x
To construct, operate, access and maintain existing telecommunications mast.
1/1d, 1/1f, 1/1k, 1/1p, 1/1am, 1/3c, 1/3f, 1/4b
To construct, access and maintain boundary fencing.
1/1t, 1/1y, 1/1ah, 1/1ak
To construct, operate, access and maintain the diverted electric cables.
1/1w
To construct, operate, access and maintain the diverted electric cables.
To construct, operate, access and maintain existing telecommunications mast.
To construct, access and maintain boundary fencing.
1/1af
To access and maintain the field ditch south and east of the A160.
To construct, access and maintain boundary fencing.
1/1ag
To construct, operate, access and maintain the diverted electric cables.
To construct, access and maintain boundary fencing.
Land Plans – Sheet 2
2/2b, 2/2f
To construct, operate, access and maintain the diverted water pipeline.
To construct, operate, access and maintain the diverted electric cable.
2/2c
To construct, operate, access and maintain the diverted water pipeline.
To construct, operate, access and maintain the diverted electric cable.
To construct, access and maintain boundary fencing.
2/2e
To construct, operate, access and maintain the diverted water pipeline.
To construct, operate, access and maintain the diverted electric cable.
To access and maintain the field ditch east of the A160.
To construct, access and maintain boundary fencing.
2/5a, 2/6a
To construct, operate, access and maintain the two diverted water pipelines.
2/5c
To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines.
To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline.
To access and maintain the field ditch south of the A160.
To construct, access and maintain boundary fencing.
2/5d
To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines.
To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline.
2/5i, 2/5m, 2/7b
To access and maintain the field ditch south of the A160.
2/6c
To construct, operate, access, maintain, use and protect the diverted high pressure gas pipeline.
To construct, operate, access, maintain, use and protect the two diverted high and one intermediate pressure gas pipelines.
2/7d
To construct, operate, access and maintain the diverted electric cable.
2/7f
To access and maintain the field ditch south of the A160.
To construct, access and maintain boundary fencing.
To construct, operate, access and maintain the diverted high pressure gas pipeline.
2/7g
To construct, operate, access and maintain the diverted high pressure gas pipeline.
2/7h
To construct, access and maintain boundary fencing.
2/8a
To construct, operate, access and maintain the diverted high pressure gas pipeline.
Land Plans – Sheet 3
3/5b, 3/5d
To construct, access and maintain the adjacent highway and drainage culvert.
To lay out new Public Right of Way diversion of the existing Footpath 91.
Land Plans – Sheet 4
4/1d
To construct, operate, access and maintain the diverted oxygen pipeline.
To access existing telecommunications mast.
4/1g, 4/1j
To construct, operate, access and maintain the diverted oxygen pipeline.
4/5b
To construct, operate, access and maintain the new section of road under the new rail bridge.

---
Source: https://www.legislation.gov.uk/uksi/2015/129/schedule/5 (the official version)
Page: https://openlegislation.uk/a160a180-port-of-immingham-improvement-development-consent-order-2015/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

