# The A19 Downhill Lane Junction Development Consent Order 2020, Schedule 6: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN


(1)
Plot reference Number shown on Land Plans
(2)
Purpose for which temporary possession may be taken
(3)
Relevant part of the authorised development
1/2c, 1/2d
Required to provide construction access.
Work No. 17
1/2e
Required to provide construction access.
Work Nos. 17, 19 and 20
1/3a, 1/4a, 1/5b, 1/7b, 1/11, 1/12a
Required to provide an area for construction material storage and storage of plant.
All Works
1/3a
Required to provide construction access.
Work Nos. 1, 2, 3, 8, 17, 18 and 19
1/4a
Required to provide construction access.
Work Nos. 20 and 21
1/5b
Required to provide construction access.
Work Nos. 1, 3, 7, 8, 19 and 20
1/7b
Required to provide construction access.
Work Nos. 8, 9 and 11
1/7d, 1/10h, 1/10i, 1/12b, 1/15a
Required to provide site access.
All Works
1/10f
Required to provide construction access and site access.
Work Nos. 12, 13 and 25
1/14a, 1/14b, 1/15b
The main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste.
Work No. 25A and 25B
1/2f, 1/6
Required to provide a perimeter enclosure and exclusion zone to allow for safe construction.
Work No. 8
2/1, 2/2a
Required to provide access to the site compound.
Work No. 25C
2/2b
The main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste.
Work No. 25C

---
Source: https://www.legislation.gov.uk/uksi/2020/746/schedule/6 (the official version)
Page: https://openlegislation.uk/a19-downhill-lane-junction-development-consent-order-2020/schedule-6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.