OpenLegislation

Schedule 8 AMENDMENTS TO THE A19/A184 TESTO’S JUNCTION ALTERATION DEVELOPMENT CONSENT ORDER 2018

Original text. Later amendments are not shown.

(1)

Where the amendment is to be made

(2)

How the amendment is to be made

(3)

Text to be substituted, inserted or omitted

Article 40 (certification of documents, etc.)After sub-paragraph (3) insert  “(4) The Testo’s plans as defined in the A19 Downhill Lane Junction Development Consent Order 2020 (the “latter Order”) are to be taken as plans or documents certified in accordance with paragraph (2) above once certified in accordance with article 41 (certification of documents, etc.) of the latter Order.”
In Schedule 1 (authorised development)
Work No.4Omit
In Schedule 3 (classification of roads, etc.), Part 3 (other public rights of way)
Cycle trackOmit row 1
In Schedule 4 (permanent stopping up of streets and private means of access), Part 1 (public rights of way to be stopped up and for which a substitute is to be provided)
The stopping up of public right of way B46In column (2) (extent of stopping up) substitute “1/8” with“1/9”
In Schedule 10 (documents to be certified)
Works Plans – Regulation 5(4)In column (3) (revision) substitute “2” with“3”
Streets, Rights of Way and Access Plans – Regulation 5(4)In column (3) (revision) substitute “1” with“2”
Engineering Drawings and Sections – Regulations 5(2)(o), 5(4) and 6(2)In column (3) (revision) substitute “1” with“2”