Schedule 8 AMENDMENTS TO THE A19/A184 TESTO’S JUNCTION ALTERATION DEVELOPMENT CONSENT ORDER 2018
(1) Where the amendment is to be made | (2) How the amendment is to be made | (3) Text to be substituted, inserted or omitted |
|---|---|---|
| Article 40 (certification of documents, etc.) | After sub-paragraph (3) insert | “(4) The Testo’s plans as defined in the A19 Downhill Lane Junction Development Consent Order 2020 (the “latter Order”) are to be taken as plans or documents certified in accordance with paragraph (2) above once certified in accordance with article 41 (certification of documents, etc.) of the latter Order.” |
| In Schedule 1 (authorised development) | ||
| Work No.4 | Omit | |
| In Schedule 3 (classification of roads, etc.), Part 3 (other public rights of way) | ||
| Cycle track | Omit row 1 | |
| In Schedule 4 (permanent stopping up of streets and private means of access), Part 1 (public rights of way to be stopped up and for which a substitute is to be provided) | ||
| The stopping up of public right of way B46 | In column (2) (extent of stopping up) substitute “1/8” with | “1/9” |
| In Schedule 10 (documents to be certified) | ||
| Works Plans – Regulation 5(4) | In column (3) (revision) substitute “2” with | “3” |
| Streets, Rights of Way and Access Plans – Regulation 5(4) | In column (3) (revision) substitute “1” with | “2” |
| Engineering Drawings and Sections – Regulations 5(2)(o), 5(4) and 6(2) | In column (3) (revision) substitute “1” with | “2” |