# The A19/A184 Testo's Junction Alteration Development Consent Order 2018, Paragraph


Work No. 3 —The construction of a new southbound A19 on-slip 1,050 metres in length that originates at Testo's roundabout (Work No. 22) and ties into the new A19 dual carriageway (Work No. 2), as shown between points 2/9 on Sheet 2 and 1/4 on Sheet 1 of the Streets, Rights of Way and Access Plans, and associated works including embankments, cuttings, drainage facilities, roadside furniture, signage, electrical connections and strengthening.

---
Source: https://www.legislation.gov.uk/uksi/2018/994/schedule/1/paragraph/wrapper5n1 (the official version)
Page: https://openlegislation.uk/a19a184-testos-junction-alteration-development-consent-order-2018/schedule-1/paragraph-wrapper5n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

