# The A19/A184 Testo's Junction Alteration Development Consent Order 2018, Schedule 5: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED


(1)Plot Reference Number shown on Land Plans
(2)Purpose for which rights over land may be acquired
Land Plans – Sheet 1
1/2c, 1/3b, 1/8
To construct, operate, access and maintain an attenuation pond pipe outfall (Work No. 10).
1/2d
To construct, operate, access and maintain a private means of access (Work No. 11).
1/5b, 1/6b, 1/7b, 1/7f, 1/9d
To construct, operate, access and maintain electric cables, equipment and apparatus (Work No. 9).
Land Plans – Sheet 2
2/1d, 2/2a, 2/2c, 2/2h, 2/2k, 2/4c
To construct, operate, access and maintain electric cables, equipment and apparatus (Work No. 9).
2/4f, 2/4g, 2/5a, 2/5c
To construct, operate, access and maintain a private means of access (Work No. 11).
2/6c
To construct, operate, access and maintain electric cables, equipment and apparatus (Work No. 9).
To construct, operate, access and maintain a diverted water pipeline (Work No. 24).
2/9c
To construct, operate, access and maintain an existing telecommunications cable (Work No. 25).
To construct, operate, access and maintain an existing gas pipeline (Work No. 26).

---
Source: https://www.legislation.gov.uk/uksi/2018/994/schedule/5 (the official version)
Page: https://openlegislation.uk/a19a184-testos-junction-alteration-development-consent-order-2018/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.