{
  "url": "https://openlegislation.uk/a19a184-testos-junction-alteration-development-consent-order-2018/schedule-7",
  "json_url": "https://openlegislation.uk/a19a184-testos-junction-alteration-development-consent-order-2018/schedule-7.json",
  "legislation": "uksi/2018/994",
  "legislation_title": "The A19/A184 Testo's Junction Alteration Development Consent Order 2018",
  "legislation_url": "https://openlegislation.uk/a19a184-testos-junction-alteration-development-consent-order-2018",
  "path": "schedule/7",
  "kind": "schedule",
  "number": "7",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)Plot Reference Number shown on the Land Plans\n(2)Purpose for which temporary possession may be taken\n(3)Relevant part of the authorised development\nLand Plans – Sheet 1\n1/2c, 1/3b, 1/8\nRequired for construction of an attenuation pond and pipe outfall.\nWork No. 10\n1/2d\nRequired to provide a new private means of access.\nWork No. 11\n1/5a, 1/6a, 1/7c, 1/7g, 1/9b, 1/9c\nRequired to provide an area for construction material storage, construction access and storage of plant.\nAll Works\n1/5b, 1/6b, 1/7b, 1/7f, 1/9d\nRequired for the diversion of electric cables and associated auxiliary cables; required to provide an area for construction material storage, construction access and storage of plant.\nAll Works\n1/7d\nRequired to provide an improved private means of access.\nWork No. 12\nLand Plans – Sheet 2\n2/1a, 2/1c\nRequired to provide an improved private means of access.\nWork No. 12\n2/1b, 2/2b, 2/2d, 2/2e, 2/2l, 2/4b, 2/4d\nRequired to provide an area for construction material storage, construction access and storage of plant.\nAll Works\n2/2a, 2/2k\nRequired for the diversion of electric cables and associated auxiliary cables.\nWork No. 9\n2/1d, 2/2c, 2/2h, 2/4c\nRequired for the diversion of electric cables and associated auxiliary cables; required to provide an area for construction material storage, construction access and storage of plant.\nAll Works\n2/2f\nRequired for the provision of the main site compound to include, but not limited to, site offices, welfare facilities, parking provisions, storage of plant and materials, and the treatment of site generated waste.\nAll Works\n2/2j, 2/5g, 2/9e\nRequired for the stopping up of the B28 Bridleway and the demolition of the bridleway bridge.\nWork No. 27\n2/3i, 2/3k, 2/7a, 2/9d\nRequired for site access.\nAll Works\n2/4f, 2/4g, 2/5a, 2/5c\nRequired to construct a new private means of access.\nWork No. 11\n2/6b, 2/6e\nRequired to provide a working area during the construction of a perimeter security fence.\nWork No. 16\n2/6c\nRequired for the diversion of electric cables and associated auxiliary cables, for construction of a perimeter security fence, and for the diversion of a water pipeline.\nWork No. 9\nWork No. 16\nWork No. 24\n2/6f\nRequired to provide a construction working area.\nWork No. 17\n2/9b\nRequired for environmental mitigation works and a construction working area.\nWork No. 23\nWork No. 18\n2/9c\nRequired for the diversion of a telecommunications cable and for the diversion of a gas pipeline.\nWork No. 25\nWork No. 26\nLand Plans – Sheet 3\n3/2b\nRequired to provide an area for construction material storage, construction access and storage of plant.\nAll Works",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2018/994/schedule/7",
    "retrieved_at": "2026-10-28T22:54:07.407586+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}