# The A249 Trunk Road (Iwade Bypass to Neatscourt Roundabout and Bridge) Order 2000, Schedule 2


The location and general design of the new bridge crossing the Swale are shown on the plan.
Points of commencement and Termination of the Bridge
Commencement
The bridge commences approximately 486 metres southwest of the point where the existing Kingsferry Bridge crosses the southwest bank of the Swale.
Termination
The bridge terminates approximately 571 metres northeast of the point where the existing Kingsferry Bridge crosses the northeast bank of the Swale.
Spans
The overall length of the bridge is 1270.5 metres in nineteen spans. The central span is 92.5 metres.
Headway
Not less than 29 metres above Mean High Water Spring tide level, this being 2.8 metres Above Ordnance Datum (AOD) Newlyn.
Waterway
A minimum clear navigable waterway of 72.5 metres.
Overall Dimensions
The bridge will be 1270.5 metres long and will carry a dual carriageway 7.3 metres wide (two lanes) in each direction. The central reserve will be 2.5 metres wide (including 0.7 metre wide hard strips) and there will be a 0.7 metre wide raised paved verge on the nearside of each carriageway.

---
Source: https://www.legislation.gov.uk/uksi/2000/2695/schedule/2 (the official version)
Page: https://openlegislation.uk/a249-trunk-road-iwade-bypass-to-neatscourt-roundabout-and-bridge-order-2000/schedule-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.