Article 2
The new highways which the Secretary of State proposes to construct–
(a)
along the routes described in Schedule 1 (the highway along the route described in paragraph 1 of that schedule being in this Order referred to as “the first new trunk road”, and the route described in paragraph 2 of that schedule being in this Order referred to as “the second new trunk road”), and
(b)
along the routes described in Schedule 2, which connect the first new trunk road and the second new trunk road with other highways at the places stated in that schedule (the highways along these routes being in this Order referred to as “the slip roads”),
shall become trunk roads as from the date when this Order comes into force.