# The A30 Chiverton to Carland Cross Development Consent Order 2020, Part 2: HIGHWAYS TO BE STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED AND NEW HIGHWAYS WHICH ARE OTHERWISE TO BE PROVIDED


(1)
Area
(2)
Highway to be stopped up
(3)
Extent of stopping up
(4)
New highway to be substituted/provided
Rights of way and access plans – Sheet 1
Perranzabuloe
Civil Parish
B3277
From Blackwater Roundabout to the existing Chiverton Cross Roundabout for a length of 156 metres including the northern section of the existing Chiverton Cross Roundabout
Reference A
Re-aligned B3277 west of the existing Blackwater Roundabout for a length 851 metres including a new length of adjacent footway/cycleway within the verge for a length of 747 metres and an adjoining new length of footway/cycleway between the realigned B3277 and new A30 for a length of 94 metres
Perranzabuloe,
Kenwyn
Civil Parishes
A390
From a point 154 metres from the existing Chiverton Cross Roundabout including the southern section of the existing Chiverton Cross Roundabout
Reference B
Re-aligned A390 east of the existing Chiverton Cross Roundabout for a length of 1078 metres including a new length of adjacent footway/cycleway within the verge for a length of 704 metres and an adjoining new length of footway/cycleway between the realigned A390 and existing footway/cycleway for a length of 21 metres
Perranzabuloe Civil Parish
Reference F (PR2)
A new restricted byway underbridge north-south to allow access under the new A30 mainline and side roads, for a total length of 135 metres
Perranzabuloe
Civil Parish
Existing A30
For a length of 850 metres from a point east of the existing Chiverton Cross Roundabout to the north of Roscarnick Farm
Reference G
A new length of classified road (A30) for a length of 178 metres to the south of the new grade separated junction at Chiverton including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chiverton for a length of 221 metres
Perranzabuloe
Civil Parish
Reference H
A new unclassified road to serve as access to Trevissome Park for a length of 70 metres from its junction with the new A30 (T)
Perranzabuloe
Civil Parish
C0005
For a length of 32 metres from its junction with the existing A30 (T)
Reference I
A new length of the C0005 for a length of 50 metres to the east of the new grade separated junction at Chiverton
Perranzabuloe Civil Parish
Reference J (PR3)
A new restricted byway to the south of the new grade separated junction at Chiverton, for a total length of 90 metres
Perranzabuloe
Civil Parish
Reference K
A new circulatory carriageway on the new grade separated junction at Chiverton for a length of 479 metres including a new length of adjacent footway/cycleway within the eastern verge of the new grade separated junction at Chiverton for a length of 115 metres
Perranzabuloe Civil Parish
Reference L (PR3)
A new restricted byway to the north of the new grade separated junction at Chiverton, for a total length of 88 metres
Perranzabuloe
Civil Parish
U6072
For a length of 195 metres from the existing A3075
Reference M
A new length of U6072 for a length of 99 metres from its junction with the realigned A3075
Perranzabuloe,
Kenwyn
Civil Parishes
Reference Z1
New A30 eastbound off-slip to the new grade separated junction at Chiverton for a length of 637 metres
Perranzabuloe
Civil Parish
Reference Z2
New A30 eastbound on-slip from the new grade separated junction at Chiverton for a length of 399 metres
Perranzabuloe
Civil Parish
Reference Z3
A30 westbound off-slip to the new grade separated junction at Chiverton for a length of 514 metres
Perranzabuloe
Civil Parish
Reference Z4
A30 westbound on-slip from the new grade separated junction at Chiverton for a length of 471 metres
Perranzabuloe Civil Parish
Reference Z16
A new unclassified road to provide access to BOAT 314/1/1 for a length of 30 metres
Kenwyn,
Perranzabuloe,
St Allen,
St Erme,
St Newlyn East
Civil Parishes
Reference ZZ
A30 for a length of 13820 metres as shown on sheets 1 to 8 of the rights of way and access plans
Rights of way and access plans – Sheet 2
Perranzabuloe
Civil Parish
A3075
From a point on the existing Chiverton Cross Roundabout to where it meets the existing A3075 for a length of 1480 metres, as shown on sheets 1 and 2 of the rights of way and access plans
Reference D
Re-aligned A3075 north of the existing Chiverton Cross Roundabout for a length of 767 metres as shown on sheets 1 and 2 of the rights of way and access plans including a new length of adjacent footway/cycleway within the northern verge for a length of 317 metres between the new grade separated junction at Chiverton and the U6072 and a new length of adjacent footway/cycleway within the southern verge from the new grade separated junction at Chiverton for a length of 177 metres
Perranzabuloe,
Kenwyn
Civil Parishes
Existing A30
From a point at the existing Chybucca Junction for a length of 850 metres in a westerly direction, as shown on sheets 2 and 3 of the rights of way and access plans
Reference E
Re-aligned A30 from a point at the existing Chybucca Junction for a length of 805 metres in a westerly direction, as shown on sheets 2 and 3 of the rights of way and access plans
Rights of way and access plans – Sheet 3
Perranzabuloe, Kenwyn Civil Parishes
B3284
For a length of 134 metres from its junction with the existing A30 (T)
Reference R
A new length of re-aligned B3284 to the east of Callestick Vean for a length of 852 metres to the northern roundabout of the new grade separated junction at Chybucca including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chybucca for a length of 201 metres
Perranzabuloe Civil Parish
Reference S (PR4)
A new bridleway from west to east to connect BR314/64/1 and BR314/65/1, for a total length of 690 metres
Kenwyn
Civil Parish
B3284
For a length of 290 metres to the south of the southern roundabout of the Chybucca grade separated junction
Reference T
A new length of classified road (A30) to the west of the new grade separated junction at Chybucca to where it meets the southern roundabout of the new grade separated junction at Chybucca for a length of 245 metres including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chybucca for a length of 50 metres
Kenwyn
Civil Parish
Reference U
A new length of B3284 for a length of 147 metres from its junction with the southern roundabout of the new grade separated junction at Chybucca including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chybucca for a length of 165 metres
Kenwyn Civil Parish
Reference V
A new link between the northern and southern roundabouts on the new grade separated junction at Chybucca for a length of 148 metres including a new length of adjacent footway/cycleway within the eastern verge for a length of 211 metres
Kenwyn
Civil Parish
Existing A30 (T)
For a length 379 metres from a point south of Creegmeor Farm to a point east of the northern roundabout of the new grade separated junction at Chybucca
Reference W
A new length of classified road (A30) from its junction with the northern roundabout of the new grade separated junction at Chybucca for a length of 150 metres including a new length of adjacent footway/cycleway within the verge from the new grade separated junction at Chybucca for a length of 160 metres
Kenwyn Civil Parish
Reference Z (PR5)
A new footpath with adjacent hard surface slope to connect to BR314/65/1 at Creegmeor Farm, for a total length of 20 metres
Kenwyn Civil Parish
Reference EE
A new circulatory carriageway on the northern roundabout of the new grade separated junction at Chybucca for a length of 106 metres
Kenwyn Civil Parish
Reference GG
A new circulatory carriageway on the southern roundabout of the new grade separated junction at Chybucca for a length of 106 metres
Kenwyn
Civil Parish
Reference Z5
A30 eastbound off-slip to the new grade separated junction at Chybucca for a length of 490 metres
Kenwyn
Civil Parish
Reference Z6
A30 westbound on-slip from the new grade separated junction at Chybucca for a length of 383 metres
Rights of way and access plans – Sheet 4
Kenwyn
Civil Parish
C0049
From a point 311 metres from its junction with the existing A30 (T)
Reference AA
A new side road to redirect 367 metres of C0049
Perranzabuloe Civil Parish
U6082 and FP 319/16/1
U6082 for a length of 107 metres from its junction with existing A30 (T)
FP 319/16/1 for a length of 68 metres from its junction with the existing A30 (T)
Reference BB (PR7)
A new bridleway over a green bridge north of the existing A30 (T) in a southerly direction, for a total length of 350 metres
St Allen Civil Parish
Reference CC (PR8)
A new footpath to join a new bridleway over a green bridge, for a total length of 15 metres
Perranzabuloe
Civil Parish
C0364
From a point east of the telecommunication mast for a length of 365 metres, as shown on sheet 5 of the rights of way and access plans
Reference DD
Re-aligned A30 for a length of 1159 metres from a point to the east of Elmsleigh to a point east of Tolgroggan Farm, as shown on sheets 4 and 5 of the rights of way and access plans
St Allen Civil Parish
Reference Z18
Widening of the U6082 for a length of 30 metres north of the property known as Burnetts
Rights of way and access plans – Sheet 5
Perranzabuloe
Civil Parish
C0089
For a length of 96 metres from its junction with the existing A30 (T)
Reference DD
Re-aligned A30 for a length of 1159 metres from a point to the east of Elmsleigh to a point east of Tolgroggan Farm, as shown on sheets 4 and 5 of the rights of way and access plans
St Allen Civil Parish
Bridleway 319/9/1
From the intersection with BR319/9/1 along its length south of the existing A30(T) for a total length of 320 metres
Reference HH (PR9)
A new bridleway for a total length of 342 metres
St Allen Civil Parish
Bridleway 319/1/1
From a point 50 metres east of the Chapel along its length for a total distance of 214 metres
Reference JJ (PR10)
A new bridleway from a point 40 metres east of the Chapel in an easterly direction for a total length of 260 metres
St Allen Civil Parish
U6083
For a length of 67 metres from its junction with the existing A30 (T)
Reference KK (PR11)
A new bridleway as an underbridge for a total length of 103 metres
St Allen
Civil Parish
Reference LL
A new length of U6083 for a length of 75 metres
Rights of way and access plans – Sheet 6
St Allen
Civil Parish
C0364
For length of 167 metres from its junction with the existing A30 (T)
Reference MM
A new length of C0364 from its junction with the existing A30 (T) for a length of 243 metres
St Allen
Civil Parish
U6083
For a length of 76 metres from its junction with the existing A30 (T)
Reference NN
A new length of U6083 for a length of 220 metres from a point to the west of Trevalso Farm to where it meets the new length of C0364
St Allen
Civil Parish
C0075
For a length of 325 metres from its junction with the existing A30 (T)
Reference OO
A new length of C0075 for a length of 380 metres from its junction with the existing A30 (T)
Rights of way and access plans – Sheet 7
St Erme
Civil Parish
U6093
For a total length of 284 metres from its junction with the existing A30 (T)
Reference PP
A length of new U0693 for a length of 140 metres south of the existing A30 (T)
Rights of way and access plans – Sheet 8
St Erme,
St Newlyn East
Civil Parishes
Existing A30 (T)
For a length of 624 metres westbound from its junction with the existing Carland Cross Roundabout as shown on sheets 7 and 8 of the rights of way and access plans
Reference QQ
A length of re-aligned A30 from a point to the east of Four Winds to the northern roundabout of the new grade separated junction at Carland Cross for a length of 654 metres as shown on sheets 7 and 8 of the rights of way and access plans
St Erme,
St Newlyn East
Civil Parishes
Reference SS
The new link between the new northern roundabout and the reconfigured southern roundabout at the new grade separated junction at Carland Cross for a length of 155 metres
St Erme,
St Newlyn East
Civil Parishes
Reference TT
New circulatory carriageway on the northern roundabout of the new grade separated junction at Carland Cross for a length of 163 metres
St Erme Civil Parish
Reference UU (PR14)
A new bridleway through an underbridge from a point 80 metres north of the existing A30(T) to a point east of the existing Carland Cross roundabout, for a total length of 486 metres including equine refuges
St Erme, St Newlyn East Civil Parishes
Reference VV (PR15)
A new bridleway south of the existing A30(T) to its junction north of Treventon Farm, for a total length of 1127 metres
St Erme,
St Newlyn East
Civil Parishes
Reference WW (PR16)
A new footpath south of the existing A30(T) west of the existing Carland Cross junction for a total length of 90 metres
St Erme,
St Newlyn East
Civil Parishes
Reference Z7
A30 eastbound off-slip to the new grade separated junction at Carland Cross for a length of 570 metres
St Erme,
St Newlyn East
Civil Parishes
Reference Z8
A30 eastbound on-slip from the new grade separated junction at Carland Cross for a length of 366 metres
St Erme,
St Newlyn East
Civil Parishes
Existing A30
For a length of 503 metres eastbound from the junction with the existing Carland Cross Roundabout
Reference Z9
A30 westbound off-slip to the new grade separated junction at Carland Cross for a length of 624 metres
St Erme
Civil Parish
Reference Z10
A30 westbound on-slip from the new grade separated junction at Carland Cross for a length of 355 metres

---
Source: https://www.legislation.gov.uk/uksi/2020/121/schedule/4/part/2 (the official version)
Page: https://openlegislation.uk/a30-chiverton-to-carland-cross-development-consent-order-2020/schedule-4/part-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.