  "url": "https://openlegislation.uk/a30-chiverton-to-carland-cross-development-consent-order-2020/schedule-7",
  "json_url": "https://openlegislation.uk/a30-chiverton-to-carland-cross-development-consent-order-2020/schedule-7.json",
  "legislation": "uksi/2020/121",
  "legislation_title": "The A30 Chiverton to Carland Cross Development Consent Order 2020",
  "legislation_url": "https://openlegislation.uk/a30-chiverton-to-carland-cross-development-consent-order-2020",
  "path": "schedule/7",
  "kind": "schedule",
  "number": "7",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)\nLocation\n(2)\nPlot Reference Number shown on land plans\n(3)\nPurpose for which temporary possession may be taken\n(4)\nRelevant part of the authorised development\nLand Plans – Sheet 1\nPerranzabuloe, Kenwyn Civil Parishes\n1/1k\nThe provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned B3277\nWork No. 3(f)\nPerranzabuloe, Kenwyn Civil Parishes\n1/1q\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned B3277\nWork No. 3(f)\nPerranzabuloe Civil Parish\n1/1t\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned B3277\nWork No. 3(f)\nKenwyn Civil Parish\n1/1aa\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A390\nWork No. 3(i)\nKenwyn Civil Parish\n1/1ac\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site generated waste\nWork No. 1(x)\nPerranzabuloe Civil Parish\n1/1am\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe Civil Parish\n1/6\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned B3277\nWork No. 3(f)\nPerranzabuloe Civil Parish\n1/9\nRequired for the construction of a new private means of access to Silversprings and boundary treatment for the realigned B3277\nWork No. 3(f)\nPerranzabuloe Civil Parish\n1/9d\nRequired for the provision of and to provide working space and temporary access for works associated with the improvement of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n1/10a\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned A390\nWork No. 3(i)\nPerranzabuloe, Kenwyn Civil Parishes\n1/10d\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned A390\nWork No. 3(i)\nPerranzabuloe, Kenwyn Civil Parishes\n1/10m\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned A390\nWork No. 3(i)\nPerranzabuloe Civil Parish\n1/15\nRequired for the provision of and to provide working space and temporary access for works associated with the improvement of the boundary treatment for the realigned A3075\nWork No. 3(g)\nLand Plans – Sheet 2\nPerranzabuloe Civil Parish\n2/1\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\n-\nPerranzabuloe Civil Parish\n2/3c\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned unclassified road U6072\nWork No. 3(j)\nPerranzabuloe Civil Parish\n2/3n\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned A3075\nWork No. 3(g)\nPerranzabuloe Civil Parish\n2/3r\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n2/3t\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n2/3u\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of gated access from the A3075\nWork No. 3(g)\nPerranzabuloe Civil Parish\n2/3w\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n2/3y\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned unclassified road U6072\nWork No. 3(j)\nPerranzabuloe Civil Parish\n2/7\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n2/7a\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n2/7b\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n2/7f\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n2/7g\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n2/8\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nLand Plans – Sheet 3\nPerranzabuloe Civil Parish\n3/1\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\n-\nKenwyn Civil Parish\n3/1e\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/1q\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of a new private means of access and the construction of drainage culverts\nWork Nos. 1(bb) and 2(a)\nKenwyn Civil Parish\n3/1t\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nPerranzabuloe Civil Parish\n3/2\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n3/2b\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/2c\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of a new private means of access and the construction of drainage culverts\nWork Nos. 1(bb) and 2(a)\nKenwyn Civil Parish\n3/2d\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/2e\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/2f\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/2h\nRequired for the construction of a new private means of access\nWork No. 2(a)\nKenwyn Civil Parish\n3/2k\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned A30\nWork No. 4(j)\nKenwyn Civil Parish\n3/2m\nRequired to provide temporary road for works associated with the construction of the new grade separated dumbbell junction at Chybucca\nWork No. 4\nPerranzabuloe Civil Parish\n3/3\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nPerranzabuloe Civil Parish\n3/3n\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n3/4\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/4e\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/4g\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/6a\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/6b\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of a new private means of access and the construction of drainage culverts\nWork No. 2(a)\nKenwyn Civil Parish\n3/6d\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the realigned A30\nWork No. 2(a)\nKenwyn Civil Parish\n3/9b\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned A30\nWork No. 4(j)\nKenwyn Civil Parish\n3/9c\nRequired to provide temporary road for works associated with the construction of the new grade separated dumbbell junction at Chybucca\nWork No. 4\nLand Plans – Sheet 4\nPerranzabuloe, St Allen, Kenwyn Civil Parishes\n4/1a\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nKenwyn Civil Parish\n4/1c\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe Civil Parish\n4/1d\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe Civil Parish\n4/1e\nRequired for the realignment of the Allet Road\nWork No. 6(b)\nPerranzabuloe Civil Parish\n4/1f\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe, St Allen Civil Parishes\n4/1k\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n4/1m\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe, Kenwyn Civil Parishes\n4/1n\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe Civil Parish\n4/2\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned B3284\nWork No. 4(g)\nKenwyn Civil Parish\n4/3a\nRequired for the construction of a new private means of access\nWork No. 4\nKenwyn Civil Parish\n4/3b\nRequired for the construction of a new private means of access\nWork No. 4\nKenwyn Civil Parish\n4/3c\nRequired to provide temporary road for works associated with the construction of the new grade separated dumbbell junction at Chybucca\nWork No. 4\nKenwyn Civil Parish\n4/4\nRequired for the construction of a new private means of access\nWork No. 4\nKenwyn Civil Parish\n4/4c\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/4d\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/4e\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of a gated access\nWork No. 1\nKenwyn Civil Parish\n4/4g\nRequired to provide temporary road for works associated with the construction of the new grade separated dumbbell junction at Chybucca\nWork No. 4\nKenwyn Civil Parish\n4/4j\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/4n\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/4p\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/4r\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30 and the stopping up of northern section of existing Bridleway BR309/3/1 north of the proposed A30 mainline\nWork No. 1\nKenwyn Civil Parish\n4/4u\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30 and the stopping up of northern section of bridleway BR309/3/1 south of the proposed A30 mainline\nWork No. 1\nKenwyn Civil Parish\n4/4w\nRequired for the stopping up of northern section of bridleway BR309/3/1 north of the proposed A30 mainline\nWork No. 6(e)\nPerranzabuloe, Kenwyn Civil Parishes\n4/5a\nRequired to provide temporary road for works associated with the construction of the new grade separated dumbbell junction at Chybucca\nWork No. 4\nKenwyn Civil Parish\n4/6a\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe, Kenwyn Civil Parishes\n4/6b\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nKenwyn Civil Parish\n4/6c\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nKenwyn Civil Parish\n4/6e\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nKenwyn Civil Parish\n4/6j\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nKenwyn Civil Parish\n4/8a\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30 and the stopping up of northern section of bridleway BR309/3/1 north of the proposed A30 mainline\nWork No. 1\nKenwyn Civil Parish\n4/8c\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30 and the stopping up of northern section of bridleway BR309/3/1 south of the proposed A30 mainline\nWork No. 1\nKenwyn Civil Parish\n4/8e\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the\nKenwyn Civil Parish\nKenwyn Civil Parish\n4/8f\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/8h\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/8k\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the new land drainage ditch and boundary treatment for the conversion of the Allet Road to an emergency access track\nWork No. 6(c)\nKenwyn Civil Parish\n4/8n\nRequired for the stopping up of northern section of bridleway BR309/3/1 north of the proposed A30 mainline\nWork No. 6(e)\nKenwyn Civil Parish\n4/9a\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 1\nKenwyn Civil Parish\n4/9b\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/9d\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nKenwyn Civil Parish\n4/9g\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nLand Plans – Sheet 5\nSt Allen Civil Parish\n5/1\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe Civil Parish\n5/1a\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe, St Allen Civil Parishes\n5/1b\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe Civil Parish\n5/1c\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe Civil Parish\n5/1d\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe, St Allen Civil Parishes\n5/1e\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1f\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1g\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1h\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1j\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1k\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1m\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1n\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1p\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1q\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1r\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n5/1s\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe and St Allen Civil Parishes\n5/1u\nRequired for access and traffic management during construction\nWork No. 1(m)\nSt Allen Civil Parish\n5/2c\nRequired for the construction of a new private means of access\nWork No. 1\nPerranzabuloe Civil Parish\n5/3a\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 1(y)\nSt Allen Civil Parish\n5/5\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 1(m)\nPerranzabuloe and St Allen Civil Parishes\n5/5a\nRequired for access and traffic management during construction\nWork No. 1(m)\nPerranzabuloe Civil Parish\n5/6\nRequired for access and traffic management during construction\nWork No. 1(m)\nSt Allen Civil Parish\n5/7d\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nLand Plans – Sheet 6\nSt Allen Civil Parish\n6/1h\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 9(b)\nSt Allen Civil Parish\n6/1j\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 9(b)\nSt Allen Civil Parish\n6/1k\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n6/1m\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n6/1n\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n6/1q\nRequired for the construction of a new private means of access\nWork No. 1\nSt Allen Civil Parish\n6/1s\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n6/1w\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nPerranzabuloe, St Allen Civil Parishes\n6/2a\nWorks associated with a length of new highway to unnamed road\nWork No. 2(b)\nPerranzabuloe, St Allen Civil Parishes\n6/2b\nWorks associated with a length of new highway to unnamed road\nWork No. 2(b)\nPerranzabuloe Civil Parish\n6/3a\nWorks associated with a length of new highway to unnamed road\nWork No. 2(b)\nSt Allen Civil Parish\n6/4b\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nPerranzabuloe, St Allen Civil Parishes\n6/4c\nWorks associated with a length of new highway to unnamed road\nWork No. 2(b)\nSt Allen Civil Parish\n6/4e\nWorks associated with a length of new highway to unnamed road\nWork No. 2(b)\nSt Allen Civil Parish\n6/4f\nWorks associated with a length of new highway to unnamed road\nWork No. 2(b)\nSt Allen Civil Parish\n6/7b\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 1(z)\nSt Allen Civil Parish\n6/7c\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nSt Allen Civil Parish\n6/7g\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned bridleway and new private means of access\nWork No. 1\nSt Allen Civil Parish\n6/10b\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the realigned bridleway and new private means of access\nWork No. 1\nSt Allen Civil Parish\n6/10c\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 9(b)\nSt Allen Civil Parish\n6/10e\nRequired to construct a new drainage ditch\nWork No. 1(bb)\nSt Allen Civil Parish\n6/11a\nRequired to construct a new drainage ditch\nWork No. 1(bb)\nSt Allen Civil Parish\n6/11b\nRequired for the construction of a new private means of access\nWork No. 1\nSt Allen Civil Parish\n6/11f\nRequired for the construction of a new private means of access\nWork No. 1\nLand Plans – Sheet 7\nSt Allen Civil Parish\n7/1\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1h\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1j\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1k\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1m\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1n\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1p\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1q\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1r\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1w\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/1x\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n7/3ab\nRequired for the construction of a new private means of access\nWork No. 1\nSt Allen Civil Parish\n7/3ac\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nSt Allen Civil Parish\n7/3q\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 10(d)\nSt Allen Civil Parish\n7/9b\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nSt Allen Civil Parish\n7/9c\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of a gated access\nWork No. 11\nSt Allen Civil Parish\n7/9d\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 11\nSt Allen Civil Parish\n7/9f\nRequired for works to cap mineshafts\nWork No. 1(ff)\nSt Allen Civil Parish\n7/9g\nRequired for works to cap mineshafts\nWork No. 1(ff)\nSt Allen Civil Parish\n7/10a\nRequired for works to cap mineshafts\nWork No. 1(ff)\nSt Allen Civil Parish\n7/11\nRequired for works to cap mineshafts\nWork No. 1(ff)\nLand Plans – Sheet 8\nSt Erme Civil Parish\n8/1\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Erme Civil Parish\n8/1a\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Erme Civil Parish\n8/1b\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Allen Civil Parish\n8/2d\nRequired for the construction of a new private means of access and landscaping\nWork No. 11(a)\nSt Allen Civil Parish\n8/2e\nRequired for the construction of a new private means of access and landscaping\nWork No. 11(a)\nSt Allen Civil Parish\n8/2f\nRequired for the construction of a new private means of access and landscaping\nWork No. 11(a)\nSt Allen Civil Parish\n8/2h\nRequired for the provision of landscaping\nWork Nos. 11(a) and 11(e)\nSt Allen Civil Parish\n8/2j\nRequired for the provision of landscaping\nWork Nos. 11(a) and 11(e)\nSt Allen Civil Parish\n8/2k\nRequired for the provision of landscaping\nWork Nos. 11(a) and 11(e)\nSt Erme Civil Parish\n8/3a\nRequired to provide working space and temporary access for works associated with the provision of ecological mitigation\nWork No. 1\nSt Erme Civil Parish\n8/3b\nRequired to provide working space and temporary access for works associated with the provision of ecological mitigation\nWork No. 1\nSt Erme Civil Parish\n8/6d\nRequired for works to cap mineshafts\nWork No. 1(ff)\nSt Erme Civil Parish\n8/6g\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nLand Plans – Sheet 9\nSt Erme Civil Parish\n9/1\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Erme Civil Parish\n9/1a\nRequired for all purposes associated with the de-trunking of the existing A30 between Carland Cross and Chiverton\nSt Erme Civil Parish\n9/1q\nRequired for the construction of advance direction sign associated with the re-configuration of the existing Carland Cross roundabout south of the main carriageway of the new A30\nWork No. 5\nSt Newlyn East Civil Parish\n9/1t\nRequired for the reinstatement of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n9/1v\nRequired for the provision of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n9/1w\nRequired for the reinstatement of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n9/1x\nRequired for the provision of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n9/1y\nRequired for the reinstatement of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n9/1z\nRequired for the provision of a private means of access\nWork No. 1\nSt Erme Civil Parish\n9/2a\nRequired for the provision of and to provide working space and temporary access for works associated with the provision of the boundary treatment for the new A30\nWork No. 1\nSt Erme Civil Parish\n9/3\nRequired for the construction of a stabilised earthworks slope adjacent to the quarry pond\nWork No. 1(ee)\nSt Newlyn East Civil Parish\n9/4\nRequired for the enhancement of heathland corridor at Carland Cross\nWork No. 1\nSt Newlyn East Civil Parish\n9/4a\nRequired for the enhancement of heathland corridor at Carland Cross\nWork No. 1\nSt Newlyn East Civil Parish\n9/4g\nRequired for a new spring chamber to be constructed\nWork No. 1\nSt Newlyn East Civil Parish\n9/5a\nRequired for a new spring chamber to be constructed\nWork No. 1\nSt Erme Civil Parish\n9/6\nRequired for the construction of advance direction sign associated with the re-configuration of the existing Carland Cross roundabout south of the main carriageway of the new A30\nWork No. 5\nSt Erme Civil Parish\n9/6a\nRequired for the construction of advance direction sign associated with the re-configuration of the existing Carland Cross roundabout south of the main carriageway of the new A30\nWork No. 5\nSt Newlyn East Civil Parish\n9/7\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 1(aa)\nSt Newlyn East Civil Parish\n9/7a\nRequired for the reinstatement of a private means of access\nWork No. 1\nLand Plans – Sheet 10\nSt Newlyn East Civil Parish\n10/1\nRequired for the reinstatement of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n10/1k\nRequired for the reinstatement of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n10/1r\nRequired for the reinstatement of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n10/1s\nRequired for the reinstatement of a private means of access\nWork No. 1\nSt Newlyn East Civil Parish\n10/4\nRequired for the provision of a site compound, including but not limited to site offices, welfare facilities, parking for workers’ private vehicles and work vehicles, storage of plant, materials and top soil and the treatment of site-generated waste\nWork No. 1(aa)\nSt Newlyn East Civil Parish\n10/4b\nRequired for the reinstatement of a private means of access\nWork No. 1",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2020/121/schedule/7",
    "retrieved_at": "2026-10-28T22:33:56.033676+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}