# The A30 Chiverton to Carland Cross Development Consent Order 2020, Paragraph 21


In this Part of this Schedule—
“the Design Vehicle” means the abnormal load vehicle, load and associated tracking as shown on the ScottishPower Renewables Tracking Drawings;
“ScottishPower Renewables” means ScottishPower Renewables (UK) Limited (company registered in Northern Ireland under number NI028425) whose registered office is at The Soloist, 1 Lanyon Place, Belfast, Northern Ireland BT1 3LP;
“ScottishPower Renewables Tracking Drawings” means the drawings certified by the Secretary of State as the ScottishPower Renewables Tracking Drawings for the purposes of this Order; and
“the Wind Farm” means Carland Cross Wind Farm comprising ten wind turbine generators, a control building, cabling and associated plant and infrastructure.

---
Source: https://www.legislation.gov.uk/uksi/2020/121/schedule/9/paragraph/21 (the official version)
Page: https://openlegislation.uk/a30-chiverton-to-carland-cross-development-consent-order-2020/schedule-9/paragraph-21
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

