  "url": "https://openlegislation.uk/a303-sparkford-to-ilchester-dualling-development-consent-order-2021/schedule-5",
  "json_url": "https://openlegislation.uk/a303-sparkford-to-ilchester-dualling-development-consent-order-2021/schedule-5.json",
  "legislation": "uksi/2021/125",
  "legislation_title": "The A303 Sparkford to Ilchester Dualling Development Consent Order 2021",
  "legislation_url": "https://openlegislation.uk/a303-sparkford-to-ilchester-dualling-development-consent-order-2021",
  "path": "schedule/5",
  "kind": "schedule",
  "number": "5",
  "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE PERMANENTLYACQUIRED",
  "text": "(1) Plot reference number shown on land plans\n(2) Purpose for which rights over land may be acquired\n(3) Relevant part of the authorised development\n1/2b\nTo plant and maintain hedgerows and undertake and maintain landscaping.\nWork Nos. 2 and 5\n1/4a\nTo construct, operate and maintain a drainage outfall including access with or without vehicles.\nWork No. 6\n2/2e\nTo construct and maintain a boundary fence, plant and maintain hedgerows and undertake and maintain landscaping, including planting.\nWork No. 11\n3/1a\nTo undertake all works necessary to use the land for the ecological works including translocation of Great Crested Newts, reptiles and other species from the Order Land; and also including vegetation clearance, planting, landscaping, creation of a hibernacula, habitat improvement and the installation of fencing and access with or without vehicles to maintain the same.\nTo impose a restrictive covenant that the owner may not remove, damage, obstruct or interfere with any works undertaken for the purposes of using the land for the translocation of species from the Order Land for a period of five years from the date of opening of the Scheme.\nWork No. 39\n3/1b\nTo undertake all works necessary to use the land for the ecological works including translocation of Great Crested Newts, reptiles and other species from the Order Land; and also including vegetation clearance, planting, landscaping, creation of a hibernacula, habitat improvement and the installation of fencing and access with or without vehicles to maintain the same.\nTo impose a restrictive covenant that the owner may not remove, damage, obstruct or interfere with any works undertaken for the purposes of using the land for the translocation of species from the Order Land for a period of five years from the date of opening of the Scheme.\nWork No. 40\n3/2a\nTo construct, operate, access and maintain a way suitable for use by the public by bicycle and as a bridleway, including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nAll works\n4/1f\nTo construct, operate, access and maintain a way suitable for use by the public on foot, including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nWork No. 16\n4/2a\nTo construct, operate, access and maintain a way suitable for use by the public on foot, including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nWork No. 16\n4/4b\nTo designate the road to be formed on part of the plot as public highway open to vehicular traffic on its completion.\nTo construct, divert, use and maintain utility connections and equipment including electric cables, equipment and apparatus including access with or without vehicles.\nWork Nos. 27, 38 and 38A\n4/4g\nTo construct, operate, access and maintain a way suitable for use by the public by bicycle and as a bridleway, including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nAll works\n4/7a\nTo construct, operate, access and maintain a way suitable for use by the public by bicycle and as a bridleway, including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nAll works\n4/8b\nTo construct, operate and maintain a drainage outfall including access with or without vehicles.\nWork No. 29\n5/1b\nTo construct, operate, access and maintain a way suitable for use by the public by bicycle and as a bridleway, including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nAll works\n5/3j\nTo designate the road to be formed on the plot as public highway open to vehicular traffic on its completion.\nTo construct, divert, use and maintain utility connections and equipment including electric cables, equipment and apparatus including access with or without vehicles.\nWork Nos. 61 and 69\n5/4c\nTo construct, divert, use and maintain utility connections and equipment including electric cables, equipment and apparatus including access with or without vehicles\nWork No. 48\n5/5c\nTo construct, divert, use and maintain utility connections and equipment including electric cables, equipment and apparatus including access with or without vehicles.\nWork No. 48\n5/8b\nTo construct, operate, access and maintain a private means of access including creation of vehicular rights of access to the property served thereby.\nWork No. 52\n5/9b\nTo construct, divert, use and maintain utility connections and equipment including telecommunication and electric cables, equipment and apparatus and water and sewerage pipes, equipment and apparatus including access with or without vehicles.\nWork Nos. 45, 46, 47, 48 and 74\n6/1e\nTo undertake works to the local road and Camel Hill.\nTo construct, divert, use and maintain utility connections and equipment including telecommunication cables equipment and apparatus including access with or without vehicles.\nWork Nos. 66 and 71\n7/1c\nTo designate the road to be formed on the plot as public highway open to vehicular traffic on its completion.\nWork No. 62\n7/5a\nTo designate the road to be formed on the plot as public highway open to vehicular traffic on its completion.\nTo construct, divert, use and maintain utility connections and equipment including electric cables and telecommunication cables equipment and apparatus including access with or without vehicles.\nWork Nos. 63, 72 and 79\n7/6a\nTo construct, operate, access and maintain a way suitable for use by the public as a footpath, including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nAll works\n7/7c\nTo designate the road to be formed on the plot as public highway open to vehicular traffic on its completion.\nWork No. 63\n7/7d\nTo designate the road to be formed on the plot as public highway open to vehicular traffic on its completion.\nWork No. 63\n7/8b\nTo construct, operate, access and maintain a way suitable for use by the public by bicycle and as a bridleway, including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nTo create a private right of access with or without vehicles, plant and machinery in favour of the owners of Blackwell Farm to take access over the plot for the purposes of agriculture.\nTo construct, divert, use and maintain utility connections and equipment including electric cables and telecommunication cables equipment and apparatus including access with or without vehicles.\nWork Nos. 72 and 105\n7/8c\nTo designate the road to be formed on the plot as public highway open to vehicular traffic on its completion.\nWork No. 64\n8/2a\nTo construct, operate and maintain a drainage outfall including access with or without vehicles.\nWork No. 94\n8/3a\nTo construct, improve, operate, access and maintain a way suitable for use by the public on foot and by bicycle including access with or without vehicles plant and machinery, and to designate that way as a Public Right of Way on its completion and allow public access over it.\nAll works",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 5 in force at 19.2.2021, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2021/125/schedule/5",
    "retrieved_at": "2026-10-28T22:17:42.465907+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}