# The A38 Derby Junctions Development Consent Order 2023, Schedule 7: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN


(1)
(2)
(3)
Plot Reference Number shown on land plans
Purpose for which temporary possession may be taken
Relevant part of the authorised development
Land Plans – Sheet 1
1/3c
Required for the establishment of environmental mitigation and enhancement
Work No. 8
1/4a
Required for the establishment of environmental mitigation and enhancement
Work No. 8
Land Plans – Sheet 2
2/1a
Required for the establishment of environmental mitigation and enhancement
Work No. 8
2/1d
Required for the construction of a northbound merge slip road and construction and realignment of a cycle track
Work No. 3
2/1n
Required for the construction of a link road and the construction and maintenance of a noise barrier
Work No. 7
2/1r
Required for the widening of the Brackensdale Avenue east and west underbridges, the alteration of part of the entry and exit lanes off Brackensdale Avenue which connects to the A38 and the reconfiguration of the existing junction between Lyttelton Street and Kingsway Park Close
Work No. 1 and 7
2/1s
Required for the alteration of part of the entry and exit lanes off Brackensdale Avenue which connects to the A38 and works to effect the stopping up of part of the entry and exit lanes off Brackensdale Avenue which connect to the A38
Work No. 1
2/1t
Required for works to effect the stopping up of part of the entry and exit lanes off Brackensdale Avenue which connect to the A38
Work No. 1
2/1u
Required for the alteration, realignment and grading of highway
Work No. 1
2/3
Required for the establishment of environmental mitigation and enhancement
Work No. 8
2/6
Required for the construction of a cycle track and establishment of environmental mitigation and enhancement
Work No. 3 and 8
2/13c
Required to construct a link road
Work No. 7
Land Plans – Sheet 3
3/1aa
Required for the diversion and construction of a utility corridor
Work No. 21
3/1b, 3/1c and 3/1d
Required for the alteration, realignment and grading of the A38
Work No. 10
3/1g and 3/1h
Required for works to effect the stopping up of the entry and exit lanes of Raleigh Street which connect to the A38; and the improvement and realignment of a cycle track
Work No. 1 and 15
3/1i
Required for the alteration, realignment and grading of highway and the construction, improvement and realignment of a cycle track
Work No. 10 and 15
3/1j
Required for the alteration, realignment and grading of the A38
Work No. 10
3/1n
Required for the construction of the A38 and the northbound diverge slip road
Work No. 10 and 11
3/1t and 3/8b
Required for alterations to the access and egress from the filling station and fast-food site
Work No. 16
3/1v
Required for the construction of a new junction for access to and egress from Markeaton Park including a roundabout and a park & ride bus stop; works to effect the stopping up of the entrance to Markeaton Park; new emergency access from Markeaton Park and relocation of the boundary wall to Markeaton Park
Work No. 16
3/4
Required for the alteration, realignment and grading of highway and the construction, improvement and realignment of the existing cycle track and access to undertake utility diversion works
Work No. 10, 15 and 22
3/5b
Required for the alteration, realignment and grading of highway and the construction of a southbound merge slip road
Work No. 10 and 14
3/5d
Required for the construction of a temporary construction compound
Work No. 19
3/8a and 3/9a
Required for amendments to the access to and egress from the filling station and fast-food site
Work No. 11
3/15a
Required for the construction and alteration of a private means of access
Work No. 16
Land Plans – Sheet 4
4/1c
Required for the construction of a southbound merge slip road and access to undertake utility diversion works
Work No. 14 and 21
4/1f
Required for the establishment of environmental mitigation and enhancement areas
Work No. 20
4/1h and 4/7d
Required to establish environmental mitigation and enhancement areas
Work No. 20
4/13b
Required for the establishment of environmental mitigation and enhancement areas
Work No. 20
Land Plans – Sheet 5
5/1 and 5/2
Required to establish environmental mitigation and enhancement areas
Work No. 20
Land Plans – Sheet 7
7/1a, 7/1b, 7/2, 7/1d and7/1c
Required for the reconfiguration of highway and a junction
Work No. 34
7/1f and 7/12
Required for the realignment of Ford Land and the reconfiguration of the junction with Lambourn Drive and the alteration of Ford Lane Bridge
Work No. 29 and 33
7/6, 7/7a and 7/7b
Required for the construction of flood compensation area
Work No. 31
7/17a
Required for the alteration, realignment and grading of carriageway and the construction of a southbound merge slip road and works to effect the stopping up and diversion of a section of a footpath and works to effect the stopping up and diversion of a private means of access
Work No. 23 and 27
7/14
Required for the alteration, realignment and grading of the carriageway and the construction of a southbound merge slip road
Work No. 23 and 27
7/17c
Required for the alteration, realignment and grading of the northbound and southbound lanes of the carriageway and the southbound merge slip road
Work No. 23 and 27
7/9, 7/8, 7/1e, 7/10 and 7/11
Required for the realignment of Ford Lane and the reconfiguration of the junction with Lambourn Drive
Work No. 33
7/1g
Required for the establishment of environmental mitigation areas
Work No. 37
7/1h and 7/1i
Required for alterations to a bridge on Ford Lane
Work No. 29
7/1j and 7/13
Required for works to stop up a highway and carry out works on a bridge
Work No. 28 and 29
Land Plans – Sheet 8
8/1
Required for the erection and accommodation of a temporary works compound
Work No. 32
8/2, 8/3a and 8/3c
Required for the alteration, realignment and grading of the northbound and southbound carriageways and the construction of a southbound merge slip road
Work No. 23 and 27
8/5 and 8/8
Required for the alteration, realignment and grading of the northbound and southbound carriageway and alteration and extension to an existing railway bridge
Work No. 23
8/18 and 8/19
Required for the realignment and grading of Ford Lane to connect to the Little Eaton Roundabout
Work No. 30
8/10b
Required for the alteration, realignment and grading of the northbound and southbound lanes, construction of a southbound merge slip road and the alteration, realignment and grading of carriageway
Work No. 23, 27 and 30
8/10c and 8/11
Required for the construction of a southbound diverge slip road and the alteration, realignment and grading of carriageway
Work No. 26 and 30
8/4h, 8/15, 8/16b, 8/24b and 8/25b
Required for the alteration, realignment and grading of northbound and southbound carriageway, construction of a southbound diverge slip road and the erection and accommodation of a works compound
Work No. 23 and 26
Land Plans – Sheet 9
9/1, 9/2, 9/3 and 9/4
Required for the erection and accommodation of a temporary works compound
Work No. 32

---
Source: https://www.legislation.gov.uk/uksi/2023/923/schedule/7 (the official version)
Page: https://openlegislation.uk/a38-derby-junctions-development-consent-order-2023/schedule-7
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

