# The A406 London North Circular Trunk Road (East London River Crossing (A13 to A2) Supplementary Trunk Road and Slip Roads) Order 1988, Schedule 1: THE MAIN NEW TRUNK ROAD


The route of the main new trunk road is a route, about 2.34 kilometres in length, starting at a point about 239 metres north-west of the north bank of the River Thames at Gallions Reach and extending generally north-westwards and then generally northwards through the Beckton Gas Works to join the South Woodford to Barking Relief Road, all at Beckton in the London Borough of Newham. This route is given the reference number 1 on the deposited plan.

---
Source: https://www.legislation.gov.uk/uksi/1988/1386/schedule/1 (the official version)
Page: https://openlegislation.uk/a406-london-north-circular-trunk-road-east-london-river-crossing-a13-to-a2-supplementary-trunk-road-and-slip-roads-order-1988/schedule-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

