{
  "url": "https://openlegislation.uk/a428-black-cat-to-caxton-gibbet-development-consent-order-2022/schedule-10",
  "json_url": "https://openlegislation.uk/a428-black-cat-to-caxton-gibbet-development-consent-order-2022/schedule-10.json",
  "legislation": "uksi/2022/934",
  "legislation_title": "The A428 Black Cat to Caxton Gibbet Development Consent Order 2022",
  "legislation_url": "https://openlegislation.uk/a428-black-cat-to-caxton-gibbet-development-consent-order-2022",
  "path": "schedule/10",
  "kind": "schedule",
  "number": "10",
  "heading": "DOCUMENTS TO BE CERTIFIED",
  "text": "(1)\nDocument\n(2)\nReference number\nthe book of reference\nTR010044/APP/4.3 revision 4\nthe classification of road plans\nTR010044/APP/2.9\nthe Crown land plans\nTR010044/APP/2.11 revision 3\nthe de-trunking plans\nTR010044/APP/2.5\nthe First Iteration EMP\nTR010044/APP/6.8 revision 4\nthe engineering section drawings\nTR010044/APP/2.10\nthe environmental masterplan\nFigure 2.4 within TR010044/APP/6.2 revision 4\nthe environmental statement\nTR010044/APP/6.1-6.3\nthe general arrangement plans\nTR010044/APP/2.4\nthe land plans\nTR010044/APP/2.2 revision 2\nthe streets, rights of way and access plans\nTR010044/APP/2.6 revision 5\nthe traffic regulation measures plans\nTR010044/APP/2.7\nthe permanent speed limit plans\nTR010044/APP/2.8\nthe works plans\nTR010044/APP/2.3\nthe outline construction traffic management plan\nTR010044/APP/7.4 revision 5\nthe archaeological mitigation strategy\nTR010044/EXAM/9.23 revision 3\nthe habitats plan\nFigure 1 of Appendix 8.3 within TR010044/APP/6.3\nthe biodiversity pre-commencement plan\nTR010044/APP/6.13 revision 2\nthe pre-commencement plan\nTR010044/EXAM/9.48 revision 4\nthe tree constraints plan\nAppendix 7.5 Part 2 and Part 3 within TR010044/APP/6.3 revision 2\nscheme design approach and design principles\nTR010044/EXAM/9.26 revision 3\nflood risk assessment\nAppendix 13.4 – Flood Risk Assessment, Appendix 13.4 – Flood Risk Assessment – Annex A – River Great Ouse Hydraulic Modelling Report, Appendix 13.4 – Flood Risk Assessment – Annex B – Ordinary Watercourse Modelling Report, Appendix 13.4 – Flood Risk Assessment – Annex C – Ordinary Watercourse Hydrology Report, within TR010044/APP/6.3, and Flood Risk Assessment Technical Note TR010044/EXAM/9.82 revision 2\nBrook Cottages heritage strategy\nTR010044/EXAM/9.104",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 10 in force at 8.9.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/934/schedule/10",
    "retrieved_at": "2026-10-28T21:56:10.063424+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}