{
  "url": "https://openlegislation.uk/a428-black-cat-to-caxton-gibbet-development-consent-order-2022/schedule-2/paragraph-1",
  "json_url": "https://openlegislation.uk/a428-black-cat-to-caxton-gibbet-development-consent-order-2022/schedule-2/paragraph-1.json",
  "legislation": "uksi/2022/934",
  "legislation_title": "The A428 Black Cat to Caxton Gibbet Development Consent Order 2022",
  "legislation_url": "https://openlegislation.uk/a428-black-cat-to-caxton-gibbet-development-consent-order-2022",
  "path": "schedule/2/paragraph/1",
  "kind": "paragraph",
  "number": "1",
  "heading": "Interpretation",
  "text": "In this Schedule—\n“archaeological mitigation strategy” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the archaeological mitigation strategy for the purposes of this Order;\n“biodiversity pre-commencement plan” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the biodiversity pre-commencement plan for the purposes of this Order;\n“Brook Cottages heritage strategy” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the Brook Cottages heritage strategy for the purposes of this Order;\n“Brook Cottages soft strip” means the soft strip referred to in the Brook Cottages heritage strategy at section 3;\n“contaminated land” means land which the undertaker considers would amount to contaminated land within the meaning given in section 78A(2)(a) or (b) of the Environmental Protection Act 1990;\n“DMRB” means the Design Manual for Roads and Bridges, which accommodates all current standards, advice and other documents relating to the design, assessment and operation of trunk roads and motorways, or any equivalent replacement to the DMRB published;\n“Ecological Clerk of Works” means the individual appointed as such by the undertaker as required by the First Iteration EMP;\n“First Iteration EMP” means the document of that description listed in Schedule 10 (documents to be certified), being the first iteration of the environmental management plan produced in accordance with the DMRB during the preliminary design stage and certified by the Secretary of State as the First Iteration EMP for the purposes of this Order, and which includes an outline plan for the following—\n(a) Air Quality Management Plan;\n(b) Noise Management Plan;\n(c) Waste Management Plan;\n(d) Biodiversity Management Plan;\n(e) Soil Handling and Management Plan;\n(f) Water Management Plan;\n(g) Energy and Resource Management Plan;\n(h) Materials Management Plan;\n(i) Contaminated Land Management Plan;\n(j) Archaeological Management Plan;\n(k) Construction Compound Management Plan;\n(l) Landscape and Ecology Management Plan;\n(m) Travel Plan; and\n(n) Borrow Pits Management Plan;\n“European protected species” has the same meaning as in regulations 42 (European protected species of animals) and 46 (European protected species of plants) of the Conservation of Habitats and Species Regulations 2017;\n“flood risk assessment” means the document of that description including the flood risk assessment technical note as listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the flood risk assessment for the purposes of this Order;\n“outline construction traffic management plan” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the outline construction traffic management plan for the purposes of this Order;\n“pre-commencement plan” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the pre-commencement plan for the purposes of this Order;\n“priority habitat” means a type of habitat identified as being of principle importance in England in accordance with section 41 (biodiversity lists and actions (England)) of the Natural Environment and Rural Communities Act 2006;\n“protected species” means species which are subject to protection under the laws of England or which are European protected species;\n“relevant local authority” means a local authority within the meaning given by section 43(3) of the 2008 Act and in whose area the part of the authorised development in question is located;\n“relevant stakeholders” in relation to a part of the authorised development means relevant local authorities and relevant statutory environmental bodies;\n“relevant statutory environmental body” means a statutory body exercising functions relating to environmental matters and which because of those functions is likely to be interested in the detailed design of the part of the authorised development in question;\n“scheme design approach and design principles” means the document of that description listed in Schedule 10 (documents to be certified) and certified by the Secretary of State as the scheme design approach and design principles for the purposes of this Order;\n“Second Iteration EMP” means the second iteration of the environmental management plan produced in accordance with the DMRB containing detailed plans relating to the construction phase of the authorised development substantially in accordance with the First Iteration EMP;\n“Third Iteration EMP” means the third iteration of the environmental management plan produced in accordance with the DMRB containing detailed plans relating to the operational and maintenance phase of the authorised development substantially in accordance with the First Iteration EMP.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 1 in force at 8.9.2022, see art. 1"
    },
    {
      "type": "footnote",
      "label": "f1",
      "text": "1990 c. 43. Section 78A was inserted by section 57 of the Environment Act 1995 (c. 25) and was amended by section 86(2) the Water Act 2003 (c. 37)."
    },
    {
      "type": "footnote",
      "label": "f2",
      "text": "S.I. 2017/1012."
    },
    {
      "type": "footnote",
      "label": "f3",
      "text": "2006 c. 16 ."
    },
    {
      "type": "footnote",
      "label": "f4",
      "text": "Section 43(3) was substituted by section 133(4) of the Localism Act 2011 (c. 20)."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/934/schedule/2/paragraph/1",
    "retrieved_at": "2026-10-28T21:56:10.063424+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}