{
  "url": "https://openlegislation.uk/a453-birmingham-to-nottingham-trunk-road-m1-junction-24-to-a52-nottingham-improvement-and-slip-roads-order-2012/schedule-3",
  "json_url": "https://openlegislation.uk/a453-birmingham-to-nottingham-trunk-road-m1-junction-24-to-a52-nottingham-improvement-and-slip-roads-order-2012/schedule-3.json",
  "legislation": "uksi/2012/1219",
  "legislation_title": "The A453 Birmingham to Nottingham Trunk Road (M1 Junction 24 to A52 Nottingham Improvement and Slip Roads) Order 2012",
  "legislation_url": "https://openlegislation.uk/a453-birmingham-to-nottingham-trunk-road-m1-junction-24-to-a52-nottingham-improvement-and-slip-roads-order-2012",
  "path": "schedule/3",
  "kind": "schedule",
  "number": "3",
  "heading": "SPECIFICATION OF THE PROPOSED ROAD AND BRIDGE OVER THE RIVER SOAR AT RATCLIFFE CUT IN THE COUNTY OF LEICESTERSHIRE",
  "text": "The specification of the proposed road and bridge is as follows:\n(a) Point of Commencement – A point on the west bank of the Ratcliffe Cut 2.300 metres south of the point where the southern edge of the existing A453(T) bridge over the Cut meets its west bank.\n(b) Point of Termination - A point on the east bank of the Ratcliffe Cut 2.300 metres south of the point where the southern edge of the existing A453(T) bridge over the Cut meets its east bank.\n(c) Width - The bridge will have a width of 15.4 metres throughout its length.\n(d) Headroom – Not less than 3.25 metres above the 100 year flood level of 30.97 metres A.O.D. to be maintained over the entire width of the waterway and towpath. The new bridge soffit will be a maximum of 150mm lower than the soffit of the existing adjacent bridge over the waterway.\n(e) Waterway – No changes will be made to the existing canal profile beneath the bridge. The bed level will remain as at present.\n(f) Towpath – A towpath of minimum width 3.000 metres will be maintained on the west side of the canal.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2012/1219/schedule/3",
    "retrieved_at": "2026-10-29T01:32:16.190984+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}