Schedule 3 SPECIFICATION
Point of Commencement: a point on the west bank of the Grand Union Canal approximately 211 metres north of the northern side of the Wanlip Canal Bridge.
Point of Termination: a point on the east bank of the Grand Union Canal approximately 215 metres north of the northern side of the Wanlip Canal Bridge.
Headroom: not less than 3.8 metres above normal navigation level which is 47.49 metres above Ordnance Datum Newlyn, to be maintained for a distance of 5.5 metres each side of the centre line of the navigable waterway to provide a total width of 11 metres.