  "url": "https://openlegislation.uk/a46-coventry-junctions-walsgrave-development-consent-order-2026/schedule-2/paragraph-1",
  "json_url": "https://openlegislation.uk/a46-coventry-junctions-walsgrave-development-consent-order-2026/schedule-2/paragraph-1.json",
  "legislation": "uksi/2026/537",
  "legislation_title": "The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026",
  "legislation_url": "https://openlegislation.uk/a46-coventry-junctions-walsgrave-development-consent-order-2026",
  "path": "schedule/2/paragraph/1",
  "kind": "paragraph",
  "number": "1",
  "heading": "Interpretation",
  "text": "In this Schedule—\n“completion or completed” means the relevant parts of the authorised development are completed and fully open to traffic;\n“contaminated land” has the same meaning as that term is given in section 78A of the Environmental Protection Act 1990;\n“DMRB” means the Design Manual for Roads and Bridges, which accommodates all current standards, advice and other documents relating to the design, assessment and operation of trunk roads and motorways, or any equivalent replacement to the DMRB published;\n“First Iteration EMP” means the first iteration of the environmental management plan produced in accordance with the DMRB during the preliminary design stage listed in Schedule 10 (documents to be certified) and certified as the First Iteration EMP by the Secretary of State for the purposes of this Order;\n“Second Iteration EMP” means the second iteration of the environmental management plan produced in accordance with the DMRB which is to be a refined version of the First Iteration EMP including more detailed versions of the outline plans and method statements contained or listed within the First Iteration EMP or any other plans required;\n“Third Iteration EMP” means the third iteration of the environmental management plan produced in accordance with the DMRB containing detailed plans relating to the operational and maintenance phase of the authorised development substantially in accordance with the First Iteration EMP and Second Iteration EMP; and\n“REAC” means the register of environmental actions and commitments contained in the First Iteration EMP.",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 2 para. 1 in force at 25.2.2026, see art. 1"
    },
    {
      "type": "footnote",
      "label": "f1",
      "text": "1990 c. 43. Section 78A was inserted by section 57 of the Environment Act 1995 (c. 25) and amended by section 86(2) of the Water Act 2003 (c. 37)."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2026/537/schedule/2/paragraph/1",
    "retrieved_at": "2026-10-28T21:01:11.033237+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}