# The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026, Part 4: PRIVATE MEANS OF ACCESS

Extent: E+W+S

(1)
Road
(2)
Extent
Access track (Work No. 2C)Between point 2/2 and point 2/3, as shown on sheet 2 of the rights of way and access plans
Access track (Work No. 2B)Between point 2/4 and point 2/5 as shown on sheet 2 of the rights of way and access plans
Maintenance access (Work No. 1M)A private access, 810 metres in length, commencing at point 2/14, circulating around the northern pond (Work No. 1L) and terminating at point 2/14, as shown on sheets 2 and 4 of the rights of way and access plans
Maintenance access (Work No. 2F)A private access, 393 metres in length, commencing at point 2/6, circulating around the central pond (Work No. 2D) and terminating at point 2/6, as shown on sheet 4 of the rights of way and access plans
Maintenance access (Work No. 2G)A private access, 283 metres in length, commencing at point 2/9, circulating around the southern detention basin (Work No. 2E) and terminating at point 2/9, as shown on sheet 3 of the rights of way and access plans

---
Source: https://www.legislation.gov.uk/uksi/2026/537/schedule/4/part/4 (the official version)
Page: https://openlegislation.uk/a46-coventry-junctions-walsgrave-development-consent-order-2026/schedule-4/part-4/enacted
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.