# The A46 Coventry Junctions (Walsgrave) Development Consent Order 2026, Part 6: TRAFFIC REGULATION MEASURES (CLEARWAYS)

Extent: E+W+S

(1)
Road name and number
(2)
Extent of Regulation
(3)
Measures
A46
The whole length of the realigned A46 northbound and southbound between point 1/1 and point 1/8 as shown on sheets 1, 2, 4 and 5 of the traffic regulation plans
Clearway (to include verge and hard strips)
A46 Northbound off-slip
Along the length of the new slip road, from its diverge from the A46 northbound carriageway for a total distance of 260 metres between point 1/3 and point 1/4 as shown on sheet 4 of the traffic regulation plans
Clearway (to include verge and hard strips)
A46 Northbound on-slip
Along the length of the new slip road, from new western roundabout junction for a total distance of 290 metres between point 1/5 and point 1/6 as shown on sheet 4 of the traffic regulation plans
Clearway (to include verge and hard strips)
A46 Southbound off-slip
Along the length of the new slip road, from its diverge from the A46 southbound carriageway for a total distance of 290 metres between point 1/9 and point 1/10 as shown on sheet 4 of the traffic regulation plans
Clearway (to include verge and hard strips)
A46 Southbound on-slip
Along the length of the new slip road, from new eastern roundabout junction for a total distance of 270 metres between point 1/11 and point 1/12 as shown on sheet 4 of the traffic regulation plans
Clearway (to include verge and hard strips)

---
Source: https://www.legislation.gov.uk/uksi/2026/537/schedule/4/part/6 (the official version)