  "url": "https://openlegislation.uk/a46-newark-bypass-development-consent-order-2025/schedule-1/crossheading-works",
  "json_url": "https://openlegislation.uk/a46-newark-bypass-development-consent-order-2025/schedule-1/crossheading-works.json",
  "legislation": "uksi/2025/1090",
  "legislation_title": "The A46 Newark Bypass Development Consent Order 2025",
  "legislation_url": "https://openlegislation.uk/a46-newark-bypass-development-consent-order-2025",
  "path": "schedule/1/crossheading/works",
  "kind": "crossheading",
  "number": null,
  "heading": "Works",
  "text": "Work No. 1 - As shown on sheet 1 of the works plans, the construction of tie-ins between the existing A46 and Farndon Roundabout (Work No. 2) of 120 metres in length.\nWork No. 2 - As shown on sheet 1 of the works plans, the alteration of Farndon Roundabout of 370 metres in length, including—\n(a) the construction of a third gyratory lane;\n(b) widening to the inside of the gyratory on the northern side of the roundabout; and\n(c) tie-in works to each arm of the roundabout.\nWork No. 3 - As shown on sheet 1 of the works plans, resurfacing works to facilitate the temporary diversion of Newark Bridleway No. 2 of 520 metres in length, including the installation of temporary signage and gates.\nWork No. 4 - As shown on sheets 1, 2 and 3 of the works plans, the construction of the new A46 dual carriageway through widening the existing A46 between Farndon Roundabout (on sheet 1) and Cattle Market Junction (on sheet 3) 2,000 metres in length, including—\n(a) the construction of two new lanes on the western side of the existing A46 to provide a new northbound carriageway;\n(b) alteration of the existing A46 carriageway; and\n(c) the construction of a new central reserve with a concrete barrier.\nWork No. 5 - As shown on sheet 1 of the works plans, the construction of a retaining wall 95 metres in length for the northbound carriageway embankment of the A46 dual carriageway (Work No. 4).\nWork No. 6 - As shown on sheet 1 of the works plans, the construction of a new access track 410 metres in length, including 240 metres of shared access track and footpath and 170 metres of shared access track and bridleway, commencing on Farndon Road, north-east of Farndon Roundabout.\nWork No. 7 - As shown on sheet 1 of the works plans, the construction of a new bridge (the new Windmill Viaduct) to carry the new northbound carriageway of the A46 (Work No. 4) over the River Trent, parallel to the existing Windmill Viaduct.\nWork No. 8 - As shown on sheets 1 and 2 of the works plans, the construction of a new access track 661 metres in length, commencing at the track to the west of the extension of the existing Farm Access Underpass (Work No. 20) (on sheet 2).\nWork No. 9 - As shown on sheet 1 of the works plans, a temporary compound of 2,392 square metres in the centre of Farndon Roundabout.\nWork No. 10 - As shown on sheet 1 of the works plans, a temporary works area to hold construction vehicles of about 1,700 square metres located west of Farndon Roundabout (Work No. 2).\nWork No. 11 - As shown on sheet 1 of the works plans, a temporary works area with welfare units and hardstanding areas for material storage of 4,700 square metres, north-west of the new Windmill Viaduct (Work No. 7).\nWork No. 12A - As shown on sheets 1 and 2 of the works plans, borrow pits (Farndon West Borrow Pits Area) including access routes, utility protection slabs, water management, soil storage and material processing areas to the north-west of the new Windmill Viaduct (Work No. 7).\nWork No. 12B - As shown on sheets 1 and 2 of the works plans, the restoration of the Farndon West Borrow Pits Area (Work No. 12A).\nWork No. 12C - As shown on sheets 1 and 2 of the works plans, the restoration of the Farndon West Borrow Pits Area (Work No. 12A).\nWork No. 13 - As shown on sheets 1 and 2 of the works plans, the construction of a floodplain compensation area (Farndon West Floodplain Compensation Area) and environmental mitigation to the north-west of the new Windmill Viaduct (Work No. 7) on sheet 1.\nWork No. 14 - As shown on sheet 2 of the works plans, borrow pits (Farndon East Borrow Pits Area) including access routes, utility protection slabs, water management, soil storage and material processing areas to the north-east of existing Windmill Viaduct.\nWork No. 15 - As shown on sheet 2 of the works plans, the construction of a floodplain compensation area (Farndon East Floodplain Compensation Area) and environmental mitigation to the north-east of existing Windmill Viaduct.\nWork No. 16 - As shown on sheet 2 of the works plans, the construction of a new access track 495 metres in length, commencing at the existing A46 350 metres north of the existing Windmill Viaduct (on sheet 1).\nWork No. 17 - As shown on sheet 2 of the works plans, the construction of an extension to the existing Pipe Culvert No. 5 under the new northbound carriageway of the A46 (Work No. 4).\nWork No. 18 - As shown on sheet 2 of the works plans, the construction of attenuation basins and associated drainage infrastructure to the west of the new northbound carriageway of the A46 (Work No. 4) and south of the new access track (Work No. 16).\nWork No. 19 - As shown on sheet 2 of the works plans, the construction of attenuation basins and associated drainage infrastructure to the east of the existing A46.\nWork No. 20 - As shown on sheet 2 of the works plans, the construction of an extension to the existing Farm Access Underpass under the new northbound carriageway of the A46 (Work No. 4).\nWork No. 21 - As shown on sheet 2 of the works plans, a temporary works area with welfare units and hardstanding areas for material storage of 2,000 square metres north-east of the existing Farm Access Underpass.\nWork No. 22 - As shown on sheet 2 of the works plans, the construction of attenuation basins and associated drainage infrastructure to the west of the new northbound carriageway of the A46 (Work No. 4) and north of the new access track (Work No. 16).\nWork No. 23 - As shown on sheet 2 of the works plans, the construction of an extension to the existing Old Trent Dyke Culvert under the new northbound carriageway of the A46 (Work No. 4).\nWork No. 24 - As shown on sheet 2 of the works plans, the construction of a new access track of 475 metres in length, commencing at the track to the north-west of the extension of the existing Farm Access Underpass (Work No. 20).\nWork No. 25 - As shown on sheet 2 of the works plans, a temporary works area with welfare units and hardstanding areas for material storage and cranage of 5,600 square metres south-west of the new Nottingham to Lincoln Railway Line West Crossing (Work No. 26).\nWork No. 26 - As shown on sheet 2 of the works plans, the construction of a new bridge, parallel to the existing Nottingham to Lincoln Railway Line West Crossing, to carry the new northbound carriageway of the A46 (Work No. 4) over the railway line (the new Nottingham to Lincoln Railway Line West Crossing).\nWork No. 27 - As shown on sheet 2 of the works plans, the construction of an access track 120 metres in length north-west of the existing Nottingham to Lincoln Railway Line West Crossing.\nWork No. 28 - As shown on sheet 2 of the works plans, a temporary works area with welfare units and hardstanding areas for material storage and cranage of 11,000 square metres north-west of the new Nottingham to Lincoln Railway Line West Crossing (Work No. 26).\nWork No. 29 - As shown on sheets 2 and 3 of the works plans, the construction of an access track 650 metres in length north of the existing Nottingham to Lincoln Railway Line West Crossing, commencing at the new access track (Work No. 27).\nWork No. 30 - As shown on sheet 3 of the works plans, the construction of attenuation basins and associated drainage infrastructure to the west of the new northbound carriageway of the A46 (Work No. 4).\nWork No. 31 - As shown on sheet 3 of the works plans, the construction of an extension to the existing Pipe Culvert No. 7 under the new northbound carriageway of the A46 (Work No. 4) and the new access track (Work No. 29).\nWork No. 32 - As shown on sheet 3 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure to the west of the new northbound carriageway of the A46 (Work No. 4).\nWork No. 33 - As shown on sheet 3 of the works plans, the construction of the new A46 dual carriageway between the Cattle Market Junction and the existing Nottingham to Lincoln Railway Line East Crossing, 1,060 metres in length, including a concrete barrier in the central reserve.\nWork No. 34 - As shown on sheet 3 of the works plans, the construction of the A46 northbound off-slip to the Cattle Market Junction, 455 metres in length.\nWork No. 35 - As shown on sheet 3 of the works plans, the construction of a retaining wall of 55 metres in length to retain the embankment of the A46 dual carriageway (Work No. 33).\nWork No. 36 - As shown on sheet 3 of the works plans, the construction of the A46 southbound on-slip from the Cattle Market Junction, 355 metres in length.\nWork No. 37 - As shown on sheet 3 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure to the south of the A46 southbound on-slip road from the Cattle Market Junction (Work No. 36).\nWork No. 38 - As shown on sheet 3 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure to the north of the A46 northbound off-slip road to the Cattle Market Junction (Work No. 34).\nWork No. 39A - As shown on sheet 3 of the works plans, the construction of a retaining wall of 315 metres in length to accommodate the Cattle Market Junction grade separation.\nWork No. 39B - As shown on sheet 3 of the works plans, the construction of a retaining wall of 243 metres in length to accommodate the Cattle Market Junction grade separation.\nWork No. 39C - As shown on sheet 3 of the works plans, the construction of a retaining wall of 80 metres in length to accommodate the Cattle Market Junction grade separation.\nWork No. 39D - As shown on sheet 3 of the works plans, the construction of a retaining wall of 80 metres in length to accommodate the Cattle Market Junction grade separation.\nWork No. 39E - As shown on sheet 3 of the works plans, the construction of a retaining wall of 202 metres in length to accommodate the Cattle Market Junction grade separation.\nWork No. 39F - As shown on sheet 3 of the works plans, the construction of a retaining wall of 212 metres in length to accommodate the Cattle Market Junction grade separation.\nWork No. 40 - As shown on sheet 3 of the works plans, the construction of the Cattle Market Junction Circulatory, 390 metres in length, including—\n(a) a cycle track comprised in the highway between the realigned A617 (Work No. 42) and altered B6326 Great North Road (Work No. 49);\n(b) the removal of the existing Cattle Market roundabout; and\n(c) the demolition of the existing maintenance shed.\nWork No. 41 - As shown on sheet 3 of the works plans, the construction of the Cattle Market West Bridge to carry the A46 dual carriageway between the Cattle Market Junction and the existing Nottingham to Lincoln Railway Line East Crossing (Work No. 33).\nWork No. 42 - As shown on sheet 3 of the works plans, the realignment of the A617 Kelham Road to tie into the Cattle Market Junction Circulatory (Work No. 40) of 205 metres in length, including a cycle track of 30 metres in length at the Cattle Market Junction.\nWork No. 43 - As shown on sheet 3 of the works plans, the construction of an extension to the existing culvert under the realigned A617 (Work No. 42).\nWork No. 44 - As shown on sheet 3 of the works plans, the construction of highway underground storm water attenuation within the Cattle Market Junction Circulatory (Work No. 40) to the north of the new A46 dual carriageway between the Cattle Market Junction and the existing Nottingham to Lincoln Railway Line East Crossing (Work No. 33).\nWork No. 45 - As shown on sheet 3 of the works plans, the realignment of the A616 Great North Road to tie into the Cattle Market Junction Circulatory (Work No. 40) of 70 metres in length, including a cycle and pedestrian crossing and associated cycle track.\nWork No. 46 - As shown on sheet 3 of the works plans, the construction of an extension on the western side of the existing causeway arches, known as “Smeaton’s Arches”, to accommodate the realigned A616 Great North Road (Work No. 45).\nWork No. 47 - As shown on sheet 3 of the works plans, a temporary works area with a hardstanding area and small welfare unit of 1,600 square metres north-west of the extension to Smeaton’s Arches (Work No. 46).\nWork No. 48 - As shown on sheet 3 of the works plans, the construction of the Cattle Market East Bridge to carry the A46 dual carriageway between the Cattle Market Junction and the existing Nottingham to Lincoln Railway Line East Crossing (Work No. 33).\nWork No. 49 - As shown on sheet 3 of the works plans, the alteration of the B6326 Great North Road to tie into the Cattle Market Junction Circulatory (Work No. 40) of 250 metres in length, including—\n(a) the widening of the existing carriageway;\n(b) a cycle track comprised in the highway of 250 metres in length leading south from the Cattle Market Junction;\n(c) a cycle and pedestrian crossing; and\n(d) the formation of means of access to adjoining land.\nWork No. 50A - As shown on sheet 3 of the works plans, the construction of an extension to the south of the existing Flood Relief Culvert under the existing Cattle Market Roundabout to carry the Cattle Market Junction Circulatory (Work No. 40).\nWork No. 50B - As shown on sheet 3 of the works plans, the construction of an extension to the north of the existing Flood Relief Culvert under the existing Cattle Market Roundabout to carry the Cattle Market Junction Circulatory (Work No. 40).\nWork No. 51 - As shown on sheet 3 of the works plans, the construction of the A46 southbound off-slip road to the Cattle Market Junction 240 metres in length, including a cycle and pedestrian crossing and a cycle track comprised in the highway.\nWork No. 52 - As shown on sheet 3 of the works plans, the construction of the A46 northbound on-slip road from the Cattle Market Junction 305 metres in length, including a cycle and pedestrian crossing and a cycle track comprised in the highway.\nWork No. 53 - As shown on sheet 3 of the works plans, a temporary compound of 19,000 square metres south-west of the B6326 Great North Road.\nWork No. 54 - As shown on sheet 3 of the works plans, the construction of an access track 375 metres in length, commencing at the A616 Great North Road.\nWork No. 55 - As shown on sheet 3 of the works plans, the construction of attenuation basins, associated drainage infrastructure and access tracks to the north of the A46 northbound on-slip road from the Cattle Market Junction (Work No. 52).\nWork No. 56 - As shown on sheets 3, 4, and 5 of the works plans, the construction of the new A46 dual carriageway through widening the existing A46 between the existing Nottingham to Lincoln Railway Line East Crossing and Brownhills Junction (on sheet 5), 1,650 metres in length, including—\n(a) the construction of two new lanes on the western side of the existing A46 to provide a new northbound carriageway;\n(b) alteration of the existing A46 carriageway; and\n(c) the construction of a new central reserve with a concrete barrier.\nWork No. 57 - As shown on sheet 4 of the works plans, the construction of an extension to the existing Pipe Culvert No. 12 under the new northbound carriageway of the A46 between the existing Nottingham to Lincoln Railway Line East Crossing and Brownhills Junction (Work No. 56).\nWork No. 58 - As shown on sheet 4 of the works plans, the widening of the existing Nottingham to Lincoln Railway Line East Crossing to facilitate the new northbound carriageway of the A46 (Work No. 56).\nWork No. 59 - As shown on sheet 4 of the works plans, a temporary works area with welfare units and hardstanding areas for material storage of 850 square metres north of the existing Nottingham to Lincoln Railway Line East Crossing.\nWork No. 60 - As shown on sheet 4 of the works plans, the construction of a retaining wall 420 metres in length to support the new northbound carriageway of the A46 between the existing Nottingham to Lincoln Railway Line East Crossing and Brownhills Junction (Work No. 56).\nWork No. 61 - As shown on sheet 4 of the works plans, the construction of an access track (the Nether Lock access track) 550 metres in length commencing at the existing access track on the north bank of the River Trent.\nWork No. 62 - As shown on sheet 4 of the works plans, a temporary construction compound of 8,500 square metres east of the existing Nether Lock Viaduct and the River Trent.\nWork No. 63 - As shown on sheet 4 of the works plans, the construction of a temporary bridge over the River Trent to accommodate the movement of construction plant and materials between the temporary construction compound (Work No. 62) and the authorised development.\nWork No. 64 - As shown on sheet 4 of the works plans, the construction of a new bridge (the new Nether Lock Rail Bridge) parallel to the existing Nether Lock Viaduct to carry the new northbound carriageway of the A46 between the existing Nottingham to Lincoln Railway Line East Crossing and Brownhills Junction (Work No. 56) over the River Trent.\nWork No. 65 - As shown on sheet 4 of the works plans, a temporary works area with office and welfare units and hardstanding areas for bridge fabrication, material and plant storage of 7,000 square metres under and north-west of the existing Nether Lock Viaduct.\nWork No. 66 - As shown on sheet 4 of the works plans, the construction of an access track 110 metres in length commencing at the Nether Lock access track (Work No. 61) to provide access to the existing hydroelectric power station.\nWork No. 67 - As shown on sheet 4 of the works plans, the construction of attenuation basins and associated drainage infrastructure, east of the existing Nether Lock Viaduct.\nWork No. 68 - As shown on sheet 4 of the works plans, a temporary works area with office and welfare units of 500 square metres north-west of the new Nether Lock Rail Bridge (Work No. 64).\nWork No. 69 - As shown on sheet 4 of the works plans, the construction of an access track 210 metres in length and passing place commencing at Quibell’s Lane.\nWork No. 70 - As shown on sheet 4 of the works plans, the construction of an extension to the existing Sewage Treatment Works Underpass under the new northbound carriageway of the A46 between the existing Nottingham to Lincoln Railway Line East Crossing and Brownhills Junction (Work No. 56).\nWork No. 71 - As shown on sheet 4 of the works plans, a temporary compound of 23,000 square metres south of the existing A46.\nWork No. 72 - As shown on sheet 4 of the works plans the construction of a retaining wall (240 metres in length) for the embankment of the A46 southbound carriageway.\nWork No. 73 - As shown on sheet 4 of the works plans, the construction of an extension to the existing Pipe Culvert No. 16 under the new northbound carriageway of the A46 between the existing Nottingham to Lincoln Railway Line East Crossing and Brownhills Junction (Work No. 56).\nWork No. 74 - As shown on sheets 4 and 5 of the works plans, the construction of attenuation basins, access tracks and associated drainage infrastructure north of the new northbound carriageway of the A46 between the existing Nottingham to Lincoln Railway Line East Crossing and Brownhills Junction (Work No. 56).\nWork No. 75 - As shown on sheets 4 and 5 of the works plans, the construction of an access track 550 metres in length commencing on Winthorpe Road.\nWork No. 76 - As shown on sheet 5 of the works plans, the construction of the new A46 dual carriageway on an embankment through the new Brownhills Junction, 1,040 metres in length, including a concrete barrier in the central reserve.\nWork No. 77A - As shown on sheet 5 of the works plans, borrow pits including access routes, utility protection slabs, water management, soil storage and material processing areas (the Brownhills Borrow Pits Area) to the west of Brownhills Junction.\nWork No. 77B - As shown on sheet 5 of the works plans the restoration of the Brownhills Borrow Pits Area (Work No. 77A).\nWork No. 78 - As shown on sheet 5 of the works plans, the construction of the A46 southbound on-slip road from the Brownhills Roundabout, 620 metres in length.\nWork No. 79 - As shown on sheet 5 of the works plans, the construction of the A46 northbound off-slip road to the new Brownhills Junction Roundabout (Work No. 83), 250 metres in length.\nWork No. 80 - As shown on sheet 5 of the works plans, the construction of a new cycle track comprising a highway of 50 metres in length.\nWork No. 81 - As shown on sheet 5 of the works plans, the construction of a new cycle track comprising a highway of 145 metres in length.\nWork No. 82 - As shown on sheet 5 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure between the A46 southbound on-slip road from the Brownhills Roundabout (Work No. 78) and the new A46 dual carriageway through the new Brownhills Junction (Work No. 76).\nWork No. 83 - As shown on sheet 5 of the works plans, the construction of the new Brownhills Junction Roundabout, 170 metres in length.\nWork No. 84 - As shown on sheet 5 of the works plans, the construction of a new link between the new Brownhills Junction Roundabout (Work No. 83) and Winthorpe Road of 60 metres in length.\nWork No. 85 - As shown on sheet 5 of the works plans, a temporary works area with welfare units and hardstanding areas for fabrication of the A1 bridge deck and material and plant storage of 12,800 square metres in the same location as the new Brownhills Junction Roundabout (Work No. 83).\nWork No. 86 - As shown on sheet 5 of the works plans, the construction of the Brownhills Underbridge to carry the new A46 dual carriageway through the new Brownhills Junction (Work No. 76) over the Brownhills Junction Link Road (Work No. 87).\nWork No. 87 - As shown on sheet 5 of the works plans, the construction of the Brownhills Junction Link Road, 300 metres in length, to connect the Brownhills Roundabout with the new Brownhills Junction Roundabout (Work No. 83).\nWork No. 88 - As shown on sheet 5 of the works plans, the construction of a new right turn connection from the A46 southbound on-slip road from the Brownhills Roundabout (Work No. 78) to the Brownhills Junction Link Road (Work No. 87).\nWork No. 89 - As shown on sheet 5 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure south-east of the Brownhills Underbridge (Work No. 86).\nWork No. 90 - As shown on sheet 5 of the works plans, the construction of a new bridge (the new A1 Crossing) to carry the new A46 dual carriageway through the new Brownhills Junction (Work No. 76) over the existing A1 dual carriageway.\nWork No. 91 - As shown on sheet 5 of the works plans, the construction of a new cycle track comprising a highway of 520 metres in length passing beneath the new A1 Crossing (Work No. 90).\nWork No. 92 - As shown on sheet 5 of the works plans, a temporary works area with welfare units and hardstanding areas for material and plant storage of 850 square metres south-east of the new A1 Crossing (Work No. 90).\nWork No. 93 - As shown on sheet 5 of the Work plans, the construction of a new track to be used jointly as a cycle track comprising a highway and as an access track of 415 metres in length commencing at the north-eastern end of the cycle track comprising a highway (Work No. 91).\nWork No. 94A - As shown on sheet 5 of the works plans, the construction of an embankment between the shared access track and cycle track (Work No. 93) and the new A46 dual carriageway through the new Brownhills Junction (Work No. 76).\nWork No. 94B - As shown on sheet 5 of the works plans, the construction of an embankment between the shared access track and cycle track (Work No. 93) and the new A46 dual carriageway (Work No. 100).\nWork No. 94C - As shown on sheets 5 and 6 of the works plans, the construction of an embankment between the shared access track and cycle track (Work No. 93) and the new dual carriageway (Work No. 100).\nWork No. 95 - As shown on sheet 5 of the works plans, the construction of the A46 northbound off-slip road to the service area, 150 metres in length, including the demolition of the former Mint Leaf restaurant.\nWork No. 96 - As shown on sheet 5 of the works plans, the construction of an extension of to the existing Bleach House Culvert to carry the new A46 dual carriageway through the new Brownhills Junction (Work No. 76) and the A46 northbound off-slip road to the service area (Work No. 95).\nWork No. 97 - As shown on sheet 5 of the works plans, the construction of a new culvert to carry the new shared access track and cycle track (Work No. 93) across the Fleet Ditch.\nWork No. 98 - As shown on sheet 5 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure, west of the A46 northbound off-slip road to the service area (Work No. 95).\nWork No. 99 - As shown on inset A of sheet 5 of the works plans, a temporary construction compound of 3,300 square metres to the north and south of the A46 northbound off-slip road to the service area (Work No. 95).\nWork No. 100 - As shown on sheets 5 and 6 of the works plans, works to improve the existing A46 dual carriageway including the installation of new highway drainage between a point 450 metres north of the A1 Crossing (Work No. 90) and the new Winthorpe Roundabout (Work No. 108).\nWork No. 101 - As shown on sheet 5 of the works plans the construction of the A46 northbound on-slip road from the service area, 180 metres in length.\nWork No. 102 - As shown on sheet 5 of the works plans, the construction of a new cycle track comprising a highway of 360 metres in length commencing at the new Friendly Farmer Link Road (Work No. 104).\nWork No. 103 - As shown on sheet 5 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure north of the A46 northbound on-slip road from the service area (Work No. 101).\nWork No. 104 - As shown on sheets 5 and 6 of the works plans, the construction of a new road (the Friendly Farmer Link Road) between the Friendly Farmer Roundabout and the new Winthorpe Roundabout (Work No. 108) of 1,080 metres in length, including—\n(a) tie-in works to the Friendly Farmer Roundabout;\n(b) the construction of an access to the service station adjacent to the Friendly Farmer Roundabout;\n(c) the construction of an access to the Newark Showground;\n(d) tie-in works to the new Winthorpe Roundabout (Work No. 108); and\n(e) the construction of a new concrete barrier.\nWork No. 105 - As shown on sheets 5 and 6 of the works plans, the construction of a cycle track comprising a highway of 375 metres in length commencing at the realigned A1133 (Work No. 109).\nWork No. 106 - As shown on sheets 5 and 6 of the works plans, a temporary works area for laydown of construction materials and plant of 12,600 square metres south of the new Winthorpe Roundabout (Work No. 108).\nWork No. 107 - As shown on sheet 6 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure south-west of the new Winthorpe Roundabout (Work No. 108).\nWork No. 108 - As shown on sheet 6 of the works plans, the construction of the new Winthorpe Roundabout, 350 metres in length, including new gyratory lanes and tie-in works to the roads joining the roundabout.\nWork No. 109 - As shown on sheet 6 of the works plans, the realignment of the A1133 ..., 320 metres in length, to connect to the new Winthorpe Roundabout (Work No. 108).\nWork No. 110 - As shown on sheet 6 of the works plans, the construction of a new access track of 415 metres in length to the realigned A1133 (Work No. 109).\nWork No. 111 - As shown on sheet 6 of the works plans, a temporary area for material lay-down and soil stockpiling of 24,000 square metres directly north of the new Winthorpe Roundabout (Work No. 108).\nWork No. 112A - As shown on sheet 6 of the works plans, the construction of an embankment north-west of the new Winthorpe Roundabout (Work No. 108).\nWork No. 112B - As shown on sheet 6 of the works plans, the construction of an embankment north of the realigned A1133 (Work No. 109).\nWork No. 113 - As shown on sheet 6 of the works plans, the construction of attenuation basins, access track and associated drainage infrastructure north of the new Winthorpe Roundabout (Work No. 108).\nWork No. 114 - As shown on sheet 6 of the works plans, a temporary construction compound of 3,900 square metres east of the new Winthorpe Roundabout (Work No. 108).\nWork No. 115 - As shown on sheet 6 of the works plans, the realignment of Drove Lane, 185 metres in length, to tie into the new Winthorpe Roundabout (Work No. 108).\nWork No. 116 - As shown on sheet 6 of the works plans, the construction of a new sign gantry at the new Winthorpe Roundabout (Work No. 108).\nWork No. 117 - As shown on sheet 6 of the works plans, the construction of an access track of 585 metres in length commencing at the realigned Drove Lane (Work No. 115).\nWork No. 118 - As shown on sheet 6 of the works plans, the construction of through lanes of 100 metres in length to accommodate the new layout of the new Winthorpe Roundabout (Work No. 108).\nWork No. 119 - As shown on sheet 6 of the works plans, works to tie into the existing A46 and new Winthorpe Roundabout (Work No. 108) of 205 metres in length.\nWork No. 120 - As shown on sheet 6 of the works plans, a temporary area for material lay-down and soil stockpiling of 14,000 square metres north-east of the new Winthorpe Roundabout (Work No. 108).\nWork No. 121 - As shown on sheet 6 of the works plans, the construction of a cantilever sign gantry over the southbound carriageway of the existing A46 east of the new Winthorpe Roundabout (Work No. 108).\nWork No. 122 - As shown on sheet 7 of the works plans, the construction of an access track of 25 metres in length commencing at the A617 Main Road.\nWork No. 123 - As shown on sheet 7 of the works plans, the construction of an access track of 550 metres in length, connected to Work No. 122.\nWork No. 124 - As shown on sheet 7 of the works plans, the construction of a new drainage culvert of 25 metres in length under the A617 Main Road.\nWork No. 125 - As shown on sheet 7 of the works plans, the construction of a flood plain compensation area (the Kelham and Averham Flood Compensation Area) to the north of Averham.\nWork No. 126 - As shown on sheet 7 of the works plans, a temporary works area for soil stockpiling of 9,800 square metres north of Averham.\nWork No. 127 - As shown on sheet 1 of the works plans, a temporary works area with welfare units and hardstanding areas for material storage of 3,178 square metres south-west of the new Windmill Viaduct (Work No. 7).\nWork No. 128 - As shown on sheet 1 of the works plans, a temporary works area with welfare units and hardstanding areas for material storage of 204 square metres south-east of the new Windmill Viaduct (Work No. 7).",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "F",
      "label": "F1",
      "text": "Words in Sch. 1 substituted (12.1.2026) by The A46 Newark Bypass Development Consent (Correction) Order 2026 (S.I. 2026/16), art. 1, Sch."
    },
    {
      "type": "F",
      "label": "F2",
      "text": "Words in Sch. 1 omitted (12.1.2026) by virtue of The A46 Newark Bypass Development Consent (Correction) Order 2026 (S.I. 2026/16), art. 1, Sch."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2025/1090/schedule/1/crossheading/works",
    "retrieved_at": "2026-10-28T21:10:46.575852+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",