  "url": "https://openlegislation.uk/a47-north-tuddenham-to-easton-development-consent-order-2022/schedule-5",
  "json_url": "https://openlegislation.uk/a47-north-tuddenham-to-easton-development-consent-order-2022/schedule-5.json",
  "legislation": "uksi/2022/911",
  "legislation_title": "The A47 North Tuddenham to Easton Development Consent Order 2022",
  "legislation_url": "https://openlegislation.uk/a47-north-tuddenham-to-easton-development-consent-order-2022",
  "path": "schedule/5",
  "kind": "schedule",
  "number": "5",
  "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED",
  "text": "(1)\nPlot reference number shown on land plans\n(2)\nPurpose for which rights and restrictive covenants over land may be acquired\n(3)\nRelevant part of the authorised development\nLand Plans – Sheet No. 1\n1/2f\nRemoval of cables and apparatus for electronic communications and associated infrastructure.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1, 2 and 73\nLand Plans – Sheet No. 2\n2/4b\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nWork No. 56 and ecological mitigation\nLand Plans – Sheet No. 3\n3/1a\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nWork No. 56 and ecological mitigation\n3/2b\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nWork No. 56 and ecological mitigation\n3/3b\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nWork No. 56 and ecological mitigation\n3/4a\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nWork No. 56 and ecological mitigation\n3/5a\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nWork No. 56 and ecological mitigation\n3/6a\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nWork No. 56 and ecological mitigation\nLand Plans – Sheet No. 4\n4/1g\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 74\n4/1j\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 74\nLand Plans – Sheet No. 5\n5/4c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 75\n5/7c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 75\n5/9c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 76\n5/9e\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 75\nLand Plans – Sheet No. 6\n6/4e\nRight to pass and repass with or without plant and vehicles and to access adjoining parcels permanently acquired or already owned by the undertaker\nWork No. 1, 14 and 61\n6/6a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and to access adjoining parcels permanently acquired or already owned by the undertaker\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 77\n6/10c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 78\nLand Plans – Sheet No. 7\n7/1n\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers.\nRight to pass and repass with or without plant and vehicles and including access to highways.\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult.\nWork No. 81\n7/6b\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 79\n7/6d\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipeline and associated infrastructure\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 80\n7/9a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 15, 16 and 80\n7/10a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 81\nLand Plans – Sheet No. 8\n8/1c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 81\n8/3b\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 81\n8/3f\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nInstall, retain, use, monitor, alter, maintain and remove ducts, cables and apparatus for services and utilities\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 82 and 83\n8/4c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 15, 16 and 80\n8/4d\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 15, 16 and 80\nLand Plans – Sheet No. 9\n9/1d\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a gas main and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 84\n9/1h\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a gas main and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a water pipeline and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 84\n9/1j\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a gas main and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a water pipeline and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 84\n9/1l\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a gas main and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 22, 32, 63 and 84\n9/1m\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a gas main and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 19, 22, 63 and 84\n9/6b\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a gas main and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 28 and 84\nLand Plans – Sheet No. 10\n10/5b\nDivert, install, underground, alter, retain, use, monitor and maintain and remove a gas main and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 20, 23, 26, 26a, 84 and 98\nLand Plans – Sheet No. 11\n11/1b\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1, 33, 87 and 97\n11/1c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 1 and 88\n11/1g\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nEcological mitigation\nLand Plans – Sheet No. 12\n12/4c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers.\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 89\nLand Plans – Sheet No. 13\n13/1d\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 65, 66 and 89\n13/1e\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 65, 66 and 89\n13/1(i)\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 65, 66 and 89\nLand Plans – Sheet No. 14\n14/4g\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being obstructed or made materially more difficult\nWork No. 1, 48, 51, 92, 94, and 99\nLand Plans – Sheet No. 15\n15/1a\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being obstructed or made materially more difficult\nWork No. 1, 48, 51, 92, 94, and 99\n15/3c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 91\n15/4b\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nWorks in connection with the overhead 132kV electricity line\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being obstructed or made materially more difficult\nWork No. 1, 48, 51, 69, 70, 92, 93, 94 and 99\n15/4e\nConstruct, install, retain use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve cabling, ducts, jointing bays, telecommunications and other ancillary apparatus (including but not limited to access chambers, manholes, and marker posts) for Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables and any other works as necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said cables, telecommunications and other ancillary apparatus\nRight to continuous vertical and lateral support for Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables\nRight to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping and the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works in connection with Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus, landscaping, ecological mitigation or enhancement works from excavation, interference or damage and to prevent access to the installed apparatus, landscaping, ecological mitigation or enhancement works being obstructed or made materially more difficult\nWork No. 72, 94 and 99\n15/5b\nConstruct, install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve\ncabling, ducts, jointing bays, telecommunications and other ancillary apparatus (including but not limited to access chambers, manholes and marker posts) for Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables and any other works as necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said cables, telecommunications and other ancillary apparatus\nRight to continuous vertical and lateral support for Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables\nRight to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping and the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works in connection with Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export cables Right to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nWorks in connection with the overhead 132kV electricity line\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nDivert, install, underground, alter, retain, use, monitor and maintain and remove water pipelines and associated infrastructure\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery and vehicles to access adjoining parcels of\nland, highways and work area\nfor Ørsted’s Hornsea Three\nOffshore Windfarm’s onshore\nexport cables\nTo include restrictive covenants for protecting the installed apparatus, landscaping, ecological mitigation or enhancement works from excavation, interference or damage and to prevent access to the installed apparatus, landscaping, ecological mitigation or enhancement works being obstructed or made materially more difficult\nWork No. 50, 92, 93 and 94\n15/6a\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being obstructed or made materially more difficult\nWork No. 71, 94, and 95\n15/7a\nConstruct, install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve\ncabling, ducts, jointing bays, telecommunications and other ancillary apparatus (including but not limited to access chambers, manholes and marker posts) for Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables and any other works as necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said cables, telecommunications and other ancillary apparatus\nRight to continuous vertical and lateral support for Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables\nRight to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping and the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works in connection with Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export cables Right to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery and vehicles to access adjoining parcels of\nland, highways and work area for Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nTo include restrictive covenants for protecting the installed apparatus, landscaping, ecological mitigation or enhancement works from excavation, interference or damage and to prevent access to the installed apparatus, landscaping, ecological mitigation or enhancement works being obstructed or made materially more difficult\nWork No. 50, 94 and 95\n15/8a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 95\n15/9a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 50 and 95\n15/10a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 91\n15/11a\nWorks in connection with the overhead 132kV electricity line\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 93\nLand Plans – Sheet No. 16\n16/1a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nRight to pass and repass with or without plant and vehicles and including access to highways\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being obstructed or made materially more difficult\nWork No. 72, 94, and 95\n16/2a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery, and vehicles to access adjoining parcels of land, highways and Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being obstructed or made materially more difficult\nWork No. 51, 52, 53, 71, 94, and 95\n16/5a\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 50 and 95\n16/6c\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 50 and 95\nLand Plans – Sheet No. 18\n18/1b\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus electricity cables including overhead electricity cables together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 91\n18/4a\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nEcological mitigation\n18/4b\nRight to pass and repass with or without plant and vehicles and to access land for ecological mitigation commitments\nEcological mitigation\nLand Plans – Sheet No. 19\n19/1a\nWorks in connection with the overhead 132kV electricity line\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 91 and 93\n19/2a\nWorks in connection with the overhead 132kV electricity line\nDivert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications apparatus including overhead electronic communications apparatus together with accesses to highways and associated infrastructure including marker posts and inspection chambers.\nConstruct, install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve\ncabling, ducts, jointing bays, telecommunications and other ancillary apparatus (including but not limited to access chambers, manholes and marker posts) for Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables and any other works as necessary together with the right to fell, trim or lop trees and bushes which may obstruct or interfere with the said cables, telecommunications and other ancillary apparatus\nRight to continuous vertical and lateral support for Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables\nRight to install, execute, implement, retain, repair, improve, renew, remove, relocate and plant trees, woodlands, shrubs, hedgerows, seeding and other ecological measures together with the right to maintain, inspect and replant such trees, shrubs and landscaping and the right to pass and repass on foot, with or without vehicles, plant and machinery for all purposes in connection with the implementation and maintenance of landscaping and ecological mitigation or enhancement works in connection with Ørsted’s\nHornsea Three Offshore\nWindfarm’s onshore export\ncables Divert, install, underground, alter, retain, use, monitor and maintain and remove electronic communications cables, apparatus and associated infrastructure\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nRight to lay temporary surfaces and to pass and repass with or without plant, machinery and vehicles to access Ørsted’s Hornsea Three Offshore Windfarm’s onshore export cables\nTo include restrictive covenants for protecting the installed apparatus, landscaping, ecological mitigation or enhancement works from excavation, interference or damage and to prevent access to the installed apparatus, landscaping, ecological mitigation or enhancement works being obstructed or made materially more difficult\nWork No. 91, 93 and 94\n19/3a\nWorks in connection with the overhead 132kV electricity line\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers\nRight to pass and repass with or without plant and vehicles and including access to highways\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult\nWork No. 93\nLand Plans – Sheet No. 20\n20/1a\nWorks in connection with the overhead 132kV electricity line.\nPlace, divert, alter, remove or maintain apparatus including mains, sewers, drains, soakaways, pipes, cables, conduits, lights and electronic communications apparatus, together with associated infrastructure including marker posts and inspection chambers.\nRight to pass and repass with or without plant and vehicles and including access to highways.\nTo include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult.\nWork No. 93",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 5 in force at 2.9.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/911/schedule/5",
    "retrieved_at": "2026-10-28T21:56:25.158415+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}