# The A47/A11 Thickthorn Junction Development Consent Order 2022, Part 6: TRAFFIC REGULATION MEASURES (CLEARWAYS AND PROHIBITIONS)

Extent: E+W+S

(1)
Parish
(2)
Road name, number and length
(3)
Measures
The traffic regulation plans – sheet 3
Hethersett; Ketteringham; Cringleford
New link Road between the A11 northbound and the A47 southbound
From point J, 796m north east of the A11 junction with Station Lane in an easterly direction to point K (sheet 7), a distance of 1725 metres.
Proposed clearway
Hethersett; Ketteringham
Cantley Lane South
From point G, a distance of 105 metres south of the centre of the junction with Cantley Lane Link Road in a north-easterly direction to point I (sheet 7), a distance of 525 metres.
Proposed 7.5 Tonne weight limit except for loading
The traffic regulation plans – sheet 5
Hethersett; Ketteringham
Cantley Lane Link Road
From point E at the junction with the B1172, in a south-easterly direction to point F (sheet 3) at the junction with Cantley Lane South, a distance of 947 metres.
Proposed 7.5 Tonne weight limit except for loading

---
Source: https://www.legislation.gov.uk/uksi/2022/1070/schedule/3/part/6 (the official version)
Page: https://openlegislation.uk/a47a11-thickthorn-junction-development-consent-order-2022/schedule-3/part-6
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.