Article 5
The Secretary of State is authorised to construct the bridge over the Birmingham and Fazeley Canal specified in Schedule 4 as part of the main new trunk road and, in connection with the construction of that bridge, to divert the part of the navigable watercourse specified in that Schedule and the towing path adjacent to that part in the manner shown in that Schedule.