# The A57 Link Roads Development Consent Order 2022, Schedule 5: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED

Extent: E+W+S

(1)
Plot Reference Number shown on Land Plans
(2)
Purpose for which rights over land may be acquired
(3)
Relevant part of the authorised development
Land Plans – Sheet 1
1/6c
Required for access to culvert for structural inspections and maintenance
Work No. 36
1/9a
Required for access to culvert for structural inspections and maintenance
Work No. 36
1/9b
Required for maintenance and access to existing water distribution main and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 60
Land Plans – Sheet 2
2/1a
Required for maintenance and access to existing water distribution main and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 60
2/1g
Required to create access and egress points serving land situated south of Edge Lane, access to culvert for structural inspections and maintenance, and the establishment of environmental mitigation and enhancement
Work Nos. 9, 36, 49
2/1i
Required for access to culvert for structural inspections and maintenance, and the establishment of environmental mitigation and enhancement
Work Nos. 36, 50
Land Plans – Sheet 3
3/3c
Required for the establishment of environmental mitigation and enhancement
Work No. 50
Land Plans – Sheet 4
4/3b
Required for the establishment of environmental mitigation and enhancement
Work No. 50
4/4m
Required to allow access for maintenance of pond
Work No. 20
4/12a
Required for access to culvert for structural inspections and maintenance
Work No. 36
4/13b
Required for access to culvert for structural inspections and maintenance
Work No. 36
4/13g
Required for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 59
4/13j
Required for the establishment of environmental mitigation and enhancement
Work No. 50
4/21
Required to allow access for maintenance of pond
Work No. 20
4/22a
Required for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 59
Land Plans – Sheet 5
5/1b
Required for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 63
5/1f
Required for construction of realigned Carrhouse Lane and for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work Nos. 34, 63
5/1i
Required for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 63
5/1j
Required for use of the realigned Carrhouse Lane
Work No. 23
5/4
Required for maintenance and access to utilities and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 63
5/7d
Required for use of the realigned Carrhouse Lane
Work No. 23
5/7f
Required for the establishment of environmental mitigation and enhancement
Work No. 50
5/9d
Required for the establishment of environmental mitigation and enhancement and for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work Nos. 50, 64
Land Plans – Sheet 6
6/1b
Required for the establishment of environmental mitigation and enhancement and for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work Nos. 50, 64
6/1d
Required for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 65
6/1f
Required for the establishment of environmental mitigation and enhancement including for flood storage
Work Nos. 50. 55
6/2a
Required for the establishment of environmental mitigation and enhancement including for flood storage, plus maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work Nos. 50, 55, 65
6/2d
Required to facilitate a new access to Tara Brook Farm
Work No. 25
6/2i
Required for the establishment of flood storage
Work No. 55
6/2j
Required for structures to facilitate the proposed River Etherow Bridge
Work Nos. 35, 50
6/2l
Required for the establishment of environmental mitigation and enhancement
Work No. 50
6/2n
Required for the establishment of flood storage
Work No. 55
6/3b
Required for maintenance and access to utilities equipment and to include restrictive covenants for protecting the installed apparatus from excavation and to prevent access to the installed apparatus being made materially more difficult
Work No. 65
Land Plans – Sheet 7
7/1d
Required for the establishment of environmental mitigation and enhancement
Work No. 50
Land Plans – Sheet 8
8/6
Rights required to undertake and maintain works associated with the detrunking of the existing A57(T) between the M67 Junction 4 and Mottram Moor Junction including associated traffic calming measures and signage
Work No. 51
8/8c
Required for the establishment of environmental mitigation and enhancement and a new footpath between Mottram Moor Junction and existing LON 87/10
Work Nos. 21, 49, 50
Land Plans – Sheet 9
9/3
Rights are required for Tameside MBC for maintenance and structural inspections of the underpass at Carrhouse Lane
Work No. 34
9/5
Rights are required for Tameside MBC for maintenance and structural inspections of the underpass at Carrhouse Lane
Work No. 34
9/7c
Rights are required for Tameside MBC for maintenance and structural inspections of the underpass at Carrhouse Lane
Work No. 34
9/9c
Rights are required for Tameside MBC for maintenance and structural inspections of the underpass at Carrhouse Lane
Work No. 34

---
Source: https://www.legislation.gov.uk/uksi/2022/1206/schedule/5 (the official version)
Page: https://openlegislation.uk/a57-link-roads-development-consent-order-2022/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.