  "url": "https://openlegislation.uk/a57-link-roads-development-consent-order-2022/schedule-7",
  "json_url": "https://openlegislation.uk/a57-link-roads-development-consent-order-2022/schedule-7.json",
  "legislation": "uksi/2022/1206",
  "legislation_title": "The A57 Link Roads Development Consent Order 2022",
  "legislation_url": "https://openlegislation.uk/a57-link-roads-development-consent-order-2022",
  "path": "schedule/7",
  "kind": "schedule",
  "number": "7",
  "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
  "text": "(1)\nPlot Reference Number shown on Land Plans\n(2)\nPurpose for which temporary possession may be taken\n(3)\nRelevant part of the authorised development\nLand Plans – Sheet 1\n1/1h\nRequired for works to improve the M67 Junction 4 roundabout, the construction of a drainage ditch, and the creation of a new public right of way\nWork Nos. 3, 7, 40\n1/6a\nRequired for works to improve the M67 Junction 4 roundabout, the construction of a drainage ditch, and the creation of a new public right of way\nWork Nos. 3, 7, 40\n1/9c\nRequired for access to and creation of new culverts for structural inspections and maintenance and the construction of new drainage ditches to the north of the A57 link between M67 and Roe Cross Road\nWork Nos. 36, 40\nLand Plans – Sheet 2\n2/1c\nRequired for works to culverted watercourses and to create new watercourse\nWork Nos. 36, 41\n2/1d\nRequired for the creation of access and egress points serving land situated south of Edge Lane and for works to culverted watercourses and to create new watercourse\nWork Nos.. 9, 36, 41\n2/1e\nRequired for the creation of new public rights of way, north and south of the proposed new dual carriageway\nWork No. 7\n2/1h\nRequired for the creation of new public rights of way, north and south of the proposed new dual carriageway and for the diversion of Hurstclough Brook\nWork Nos. 7, 43\n2/1j\nRequired for the construction of new drainage ditches.\nWork No. 40\n2/2a\nRequired for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram Underpass and for the creation of drainage ditches\nWork Nos. 32, 40\n2/2d\nRequired for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram Underpass\nWork No. 32\n2/2f\nRequired for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram Underpass\nWork No. 32\nLand Plans – Sheet 3\n3/2x\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/2aa\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/2bb\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/2cc\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/3e\nRequired for the construction of a new section of the eastbound A57 dual carriageway, new watercourses and utility diversions\nWork Nos. 5, 44, 58\n3/3f\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/3h\nRequired for the construction of a new section of the eastbound A57 dual carriageway, new watercourse and the diversion of buried power cables\nWork Nos. 5, 44, 61\n3/14\nRequired for the realignment of Old Hall Lane and the creation of a means of access and egress to the south of land currently known as the Showground\nWork Nos. 10, 11\n3/15b\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/16b\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/17a\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/18\nRequired for the realignment of Old Hall Lane\nWork No. 10\n3/20a\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/22b\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork Nos. 11, 66\n3/22c\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/22d\nRequired for the construction of new watercourses to manage local drainage\nWork No. 44\n3/22e\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork Nos. 11, 66\n3/24\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/25\nRequired for the construction of new watercourses to manage local drainage\nWork No. 44\n3/27b\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/27c\nRequired for the construction of a new section of the eastbound A57 dual carriageway, the diversion of a water sewerage pipe, the construction of new watercourses to manage local drainage and diversion of water sewage pipes\nWork Nos. 5, 44, 58\n3/27d\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/28a\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/28b\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n3/29\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\nLand Plans – Sheet 4\n4/3a\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n4/8b\nRequired for the construction of an earthworks screening bund\nWork No. 48\n4/9\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n4/10a\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground\nWork No. 11\n4/10c\nRequired for the diversion of buried power cables\nWork No. 61\n4/12c\nRequired for the creation of means of access and egress to the south of the land currently known as the Showground and the development of a short cul de sac to the west of the proposed Mottram Moor Junction\nWork Nos. 11, 17, 66\n4/12d\nRequired for the diversion of buried power cables\nWork No. 61\n4/13a\nRequired for the creation of a footpath between the Mottram Moor Junction and the existing footpath, the creation of a culvert to carry an unnamed watercourse and a diversion of Tara Brook south\nWork Nos. 21, 36, 45\n4/13c\nRequired for the creation of a footpath between the Mottram Moor Junction and the existing footpath the creation of a culvert to carry Tara Brook, a diversion of Tara Brook and the construction of an earthworks screening bund\nWork Nos. 21, 36, 45, 48\n4/13f\nRequired for the creation of a private access track for the maintenance of a pond\nWork No. 20\n4/13h\nRequired for the creation of a culvert to carry Tara Brook, a diversion of Tara Brook and the construction of various drainage ditches\nWork Nos. 36, 45, 46\n4/13i\nRequired for the construction of a drainage retention pond, the diversion of Tara Brook and the diversion of existing water main\nWork Nos. 38, 45, 59\n4/13k\nRequired for the construction of various drainage ditches and the construction of an earthworks screening bund\nWork Nos. 46, 48\n4/14b\nRequired for the diversion of buried power cables\nWork No. 61\n4/20\nRequired for the creation of a private access track for the maintenance of a pond\nWork No. 20\n4/22b\nRequired for the diversion of existing water main and the diversion of Tara Brook\nWork Nos. 59, 45\nLand Plans – Sheet 5\n5/1a\nRequired for the construction of various drainage ditches and the construction of an earthworks screening bund\nWork Nos. 46, 48\n5/1c\nRequired for the realignment of Carrhouse Lane and the construction of various drainage ditches\nWork Nos. 23, 46\n5/1e\nRequired for the creation of a new bridleway, the construction of the A57 Link Road and the realignment of Carrhouse Lane\nWork Nos. 14, 22, 23\n5/1g\nRequired for the construction of the A57 Link Road and the realignment of Carrhouse Lane\nWork Nos. 22, 23\n5/1h\nRequired for the realignment of Carrhouse Lane\nWork No. 23\n5/1k\nRequired for the realignment of Carrhouse Lane and the construction of various drainage ditches\nWork Nos. 23, 46\n5/2\nRequired for the construction of the A57 Link Road and the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse Lane\nWork Nos. 22, 24\n5/3\nRequired for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage\nWork No. 23\n5/6a\nRequired for the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse Lane\nWork No. 24\n5/6d\nRequired for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage\nWork No. 23\n5/7b\nRequired for the construction of various drainage ditches\nWork No. 46\n5/7c\nRequired for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage\nWork No. 23\n5/7e\nRequired for the creation of a new access track to Carrhouse Lane Farm\nWork No. 56\n5/7g\nRequired for the creation of a new access track to Carrhouse Lane Farm\nWork No. 56\n5/7h\nRequired for the creation of a new access track to Carrhouse Lane Farm\nWork No. 56\n5/8\nRequired for the construction of various drainage ditches\nWork No. 46\n5/9a\nRequired for the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse Lane and the construction of various drainage ditches\nWork Nos. 24, 46, 66\n5/9c\nRequired for the creation of a new access track to Carrhouse Lane Farm\nWork No. 56\n5/9e\nRequired for the creation of a new access track to Carrhouse Lane Farm\nWork No. 56\n5/9f\nRequired for the creation of a new access track to Carrhouse Lane Farm\nWork No. 56\n5/9g\nRequired for the creation of a new access track to Carrhouse Lane Farm\nWork No. 56\nLand Plans – Sheet 6\n6/1a\nRequired for the diversion of a footpath facilitating a private access track to Pond 3 and access to an existing maintenance track, the creation of a culvert to carry a drainage ditch and the construction of various drainage ditches\nWork Nos. 25, 36, 46\n6/1c\nRequired for the construction of various drainage ditches\nWork Nos. 46, 66\n6/2c\nRequired for the diversion of a footpath facilitating a private access track to Pond 3 and access to an existing maintenance track, plus the construction of various drainage ditches\nWork Nos. 25, 46, 66\n6/2e\nRequired for the diversion of a footpath and the creation of new access tracks, the construction of the proposed River Etherow bridge, the creation of a culvert to carry drainage ditch and the construction of various drainage ditches\nWork Nos. 25, 35, 36, 46\n6/2f\nRequired for the construction of the proposed River Etherow bridge, the construction of various drainage ditches and the establishment of environmental mitigation and enhancement\nWork Nos. 35, 46, 50\n6/2h\nRequired for the construction of various drainage ditches\nWork No. 46\n6/2k\nRequired for the construction of the proposed River Etherow bridge and the construction of various drainage ditches\nWork Nos. 35, 46\n6/2m\nRequired for the construction of various drainage ditches\nWork No. 46\n6/2p\nRequired for the construction of an at grade signalised T-Junction\nWork No. 27\n6/2q\nRequired for the creation of a bridleway along the south side of A57 Link Road and road widening and resurfacing\nWork Nos. 26, 28\n6/2r\nThe creation of a bridleway along the south side of A57 Link Road, the construction of an at grade signalised T-Junction and the construction of a new private access\nWork Nos. 26, 27, 30\n6/3a\nRequired for the construction of various drainage ditches\nWork Nos. 46, 66\n6/3d\nRequired for the diversion of a footpath and creation of an access track\nWork No. 25\n6/5\nRequired for the construction of an at grade signalised T-Junction and the creation of controlled pedestrian/cycle crossing\nWork Nos. 27, 29\n6/6\nRequired for the construction of an at grade signalised T-Junction and the creation of controlled pedestrian/cycle crossing\nWork Nos. 27, 29\nLand Plans – Sheet 7\n7/1a\nRequired for the establishment of a construction compound and the undertaking of associated construction activities\nAll works\n7/1c\nRequired for the establishment of a construction compound and the undertaking of associated construction activities\nAll works\nLand Plans – Sheet 8\n8/7a\nRequired for the creation of an earthwork screening bund\nWork No. 48\n8/8a\nRequired for the creation of a footpath between the new Mottram Moor Junction and existing footpath, creation of a culvert to carry Tara Brook, the diversion of Tara Brook and the location of bat boxes installed on existing trees\nWork Nos. 21, 36, 45, 50\n8/8d\nRequired for the creation of a footpath between the new Mottram Moor Junction and existing footpath and the diversion of Tara Brook\nWork Nos. 21, 45\nLand Plans – Sheet 9\n9/7a\nRequired for the realignment of Carrhouse Lane and the construction of various drainage ditches\nWork Nos. 23, 46\n9/7e\nRequired for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage\nWork No. 23\n9/9a\nRequired for the realignment of Carrhouse Lane and the construction of various drainage ditches.\nWork Nos. 23, 46\n9/16\nRequired for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage\nWork No. 23",
  "extent": "E+W+S",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 7 in force at 7.12.2022, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2022/1206/schedule/7",
    "retrieved_at": "2026-10-28T21:53:22.588317+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}