# The A57 Link Roads Development Consent Order 2022, Schedule 7: LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN

Extent: E+W+S

(1)
Plot Reference Number shown on Land Plans
(2)
Purpose for which temporary possession may be taken
(3)
Relevant part of the authorised development
Land Plans – Sheet 1
1/1h
Required for works to improve the M67 Junction 4 roundabout, the construction of a drainage ditch, and the creation of a new public right of way
Work Nos. 3, 7, 40
1/6a
Required for works to improve the M67 Junction 4 roundabout, the construction of a drainage ditch, and the creation of a new public right of way
Work Nos. 3, 7, 40
1/9c
Required for access to and creation of new culverts for structural inspections and maintenance and the construction of new drainage ditches to the north of the A57 link between M67 and Roe Cross Road
Work Nos. 36, 40
Land Plans – Sheet 2
2/1c
Required for works to culverted watercourses and to create new watercourse
Work Nos. 36, 41
2/1d
Required for the creation of access and egress points serving land situated south of Edge Lane and for works to culverted watercourses and to create new watercourse
Work Nos.. 9, 36, 41
2/1e
Required for the creation of new public rights of way, north and south of the proposed new dual carriageway
Work No. 7
2/1h
Required for the creation of new public rights of way, north and south of the proposed new dual carriageway and for the diversion of Hurstclough Brook
Work Nos. 7, 43
2/1j
Required for the construction of new drainage ditches.
Work No. 40
2/2a
Required for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram Underpass and for the creation of drainage ditches
Work Nos. 32, 40
2/2d
Required for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram Underpass
Work No. 32
2/2f
Required for the construction of the proposed Roe Cross Road Bridge and retaining walls to Mottram Underpass
Work No. 32
Land Plans – Sheet 3
3/2x
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/2aa
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/2bb
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/2cc
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/3e
Required for the construction of a new section of the eastbound A57 dual carriageway, new watercourses and utility diversions
Work Nos. 5, 44, 58
3/3f
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/3h
Required for the construction of a new section of the eastbound A57 dual carriageway, new watercourse and the diversion of buried power cables
Work Nos. 5, 44, 61
3/14
Required for the realignment of Old Hall Lane and the creation of a means of access and egress to the south of land currently known as the Showground
Work Nos. 10, 11
3/15b
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/16b
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/17a
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/18
Required for the realignment of Old Hall Lane
Work No. 10
3/20a
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/22b
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work Nos. 11, 66
3/22c
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/22d
Required for the construction of new watercourses to manage local drainage
Work No. 44
3/22e
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work Nos. 11, 66
3/24
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/25
Required for the construction of new watercourses to manage local drainage
Work No. 44
3/27b
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/27c
Required for the construction of a new section of the eastbound A57 dual carriageway, the diversion of a water sewerage pipe, the construction of new watercourses to manage local drainage and diversion of water sewage pipes
Work Nos. 5, 44, 58
3/27d
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/28a
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/28b
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
3/29
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
Land Plans – Sheet 4
4/3a
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
4/8b
Required for the construction of an earthworks screening bund
Work No. 48
4/9
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
4/10a
Required for the creation of means of access and egress to the south of the land currently known as the Showground
Work No. 11
4/10c
Required for the diversion of buried power cables
Work No. 61
4/12c
Required for the creation of means of access and egress to the south of the land currently known as the Showground and the development of a short cul de sac to the west of the proposed Mottram Moor Junction
Work Nos. 11, 17, 66
4/12d
Required for the diversion of buried power cables
Work No. 61
4/13a
Required for the creation of a footpath between the Mottram Moor Junction and the existing footpath, the creation of a culvert to carry an unnamed watercourse and a diversion of Tara Brook south
Work Nos. 21, 36, 45
4/13c
Required for the creation of a footpath between the Mottram Moor Junction and the existing footpath the creation of a culvert to carry Tara Brook, a diversion of Tara Brook and the construction of an earthworks screening bund
Work Nos. 21, 36, 45, 48
4/13f
Required for the creation of a private access track for the maintenance of a pond
Work No. 20
4/13h
Required for the creation of a culvert to carry Tara Brook, a diversion of Tara Brook and the construction of various drainage ditches
Work Nos. 36, 45, 46
4/13i
Required for the construction of a drainage retention pond, the diversion of Tara Brook and the diversion of existing water main
Work Nos. 38, 45, 59
4/13k
Required for the construction of various drainage ditches and the construction of an earthworks screening bund
Work Nos. 46, 48
4/14b
Required for the diversion of buried power cables
Work No. 61
4/20
Required for the creation of a private access track for the maintenance of a pond
Work No. 20
4/22b
Required for the diversion of existing water main and the diversion of Tara Brook
Work Nos. 59, 45
Land Plans – Sheet 5
5/1a
Required for the construction of various drainage ditches and the construction of an earthworks screening bund
Work Nos. 46, 48
5/1c
Required for the realignment of Carrhouse Lane and the construction of various drainage ditches
Work Nos. 23, 46
5/1e
Required for the creation of a new bridleway, the construction of the A57 Link Road and the realignment of Carrhouse Lane
Work Nos. 14, 22, 23
5/1g
Required for the construction of the A57 Link Road and the realignment of Carrhouse Lane
Work Nos. 22, 23
5/1h
Required for the realignment of Carrhouse Lane
Work No. 23
5/1k
Required for the realignment of Carrhouse Lane and the construction of various drainage ditches
Work Nos. 23, 46
5/2
Required for the construction of the A57 Link Road and the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse Lane
Work Nos. 22, 24
5/3
Required for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage
Work No. 23
5/6a
Required for the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse Lane
Work No. 24
5/6d
Required for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage
Work No. 23
5/7b
Required for the construction of various drainage ditches
Work No. 46
5/7c
Required for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage
Work No. 23
5/7e
Required for the creation of a new access track to Carrhouse Lane Farm
Work No. 56
5/7g
Required for the creation of a new access track to Carrhouse Lane Farm
Work No. 56
5/7h
Required for the creation of a new access track to Carrhouse Lane Farm
Work No. 56
5/8
Required for the construction of various drainage ditches
Work No. 46
5/9a
Required for the creation of a private, field access track from Carrhouse Lane to a field east of Carrhouse Lane and the construction of various drainage ditches
Work Nos. 24, 46, 66
5/9c
Required for the creation of a new access track to Carrhouse Lane Farm
Work No. 56
5/9e
Required for the creation of a new access track to Carrhouse Lane Farm
Work No. 56
5/9f
Required for the creation of a new access track to Carrhouse Lane Farm
Work No. 56
5/9g
Required for the creation of a new access track to Carrhouse Lane Farm
Work No. 56
Land Plans – Sheet 6
6/1a
Required for the diversion of a footpath facilitating a private access track to Pond 3 and access to an existing maintenance track, the creation of a culvert to carry a drainage ditch and the construction of various drainage ditches
Work Nos. 25, 36, 46
6/1c
Required for the construction of various drainage ditches
Work Nos. 46, 66
6/2c
Required for the diversion of a footpath facilitating a private access track to Pond 3 and access to an existing maintenance track, plus the construction of various drainage ditches
Work Nos. 25, 46, 66
6/2e
Required for the diversion of a footpath and the creation of new access tracks, the construction of the proposed River Etherow bridge, the creation of a culvert to carry drainage ditch and the construction of various drainage ditches
Work Nos. 25, 35, 36, 46
6/2f
Required for the construction of the proposed River Etherow bridge, the construction of various drainage ditches and the establishment of environmental mitigation and enhancement
Work Nos. 35, 46, 50
6/2h
Required for the construction of various drainage ditches
Work No. 46
6/2k
Required for the construction of the proposed River Etherow bridge and the construction of various drainage ditches
Work Nos. 35, 46
6/2m
Required for the construction of various drainage ditches
Work No. 46
6/2p
Required for the construction of an at grade signalised T-Junction
Work No. 27
6/2q
Required for the creation of a bridleway along the south side of A57 Link Road and road widening and resurfacing
Work Nos. 26, 28
6/2r
The creation of a bridleway along the south side of A57 Link Road, the construction of an at grade signalised T-Junction and the construction of a new private access
Work Nos. 26, 27, 30
6/3a
Required for the construction of various drainage ditches
Work Nos. 46, 66
6/3d
Required for the diversion of a footpath and creation of an access track
Work No. 25
6/5
Required for the construction of an at grade signalised T-Junction and the creation of controlled pedestrian/cycle crossing
Work Nos. 27, 29
6/6
Required for the construction of an at grade signalised T-Junction and the creation of controlled pedestrian/cycle crossing
Work Nos. 27, 29
Land Plans – Sheet 7
7/1a
Required for the establishment of a construction compound and the undertaking of associated construction activities
All works
7/1c
Required for the establishment of a construction compound and the undertaking of associated construction activities
All works
Land Plans – Sheet 8
8/7a
Required for the creation of an earthwork screening bund
Work No. 48
8/8a
Required for the creation of a footpath between the new Mottram Moor Junction and existing footpath, creation of a culvert to carry Tara Brook, the diversion of Tara Brook and the location of bat boxes installed on existing trees
Work Nos. 21, 36, 45, 50
8/8d
Required for the creation of a footpath between the new Mottram Moor Junction and existing footpath and the diversion of Tara Brook
Work Nos. 21, 45
Land Plans – Sheet 9
9/7a
Required for the realignment of Carrhouse Lane and the construction of various drainage ditches
Work Nos. 23, 46
9/7e
Required for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage
Work No. 23
9/9a
Required for the realignment of Carrhouse Lane and the construction of various drainage ditches.
Work Nos. 23, 46
9/16
Required for the realignment of Carrhouse Lane, together with a new access track and public footpath, including associated earthworks and drainage
Work No. 23

---
Source: https://www.legislation.gov.uk/uksi/2022/1206/schedule/7 (the official version)