# The A585 Windy Harbour to Skippool Highway Development Consent Order 2020, Schedule 5: LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED


(1)
Plot Reference Number shown on Land Plans
(2)
Purpose for which rights over land may be acquired
Land Plans – Sheet 1
1/34c
To construct, operate, access and maintain Skippool bridge (Work No.25)
Land Plans – Sheet 4
4/02e, 4/06i
To construct, operate, access and maintain a culvert/ditch outfall (Work No.41)
4/06j, 4/08h
To construct, operate, access and maintain a culvert/ditch outfall (Work No.96)
4/08i
To construct, operate, access and maintain a culvert/ditch outfall (Work No.44)
4/08j
To construct, operate, access and maintain a culvert/ditch outfall (Work No.45)
4/08k
To operate, access and maintain a bridge
Land Plans – Sheet 5
5/01m
To operate, access and maintain a bridge
5/01n, 5/02a, 5/02, 5/01d, 5/03, 5/04, 5/05a, 5/06f
To operate, access and maintain a drainage outfall (Work No.62)
5/14a, 5/13c, 5/09g, 5/13b
To construct, operate, access and maintain Lodge Lane Bridge (Work No.70)
Land Plans – Sheet 7
7/10, 7/04e, 7/04d
To construct, operate, access and maintain a culvert/ditch outfall (Work No.92)

---
Source: https://www.legislation.gov.uk/uksi/2020/402/schedule/5 (the official version)
Page: https://openlegislation.uk/a585-windy-harbour-to-skippool-highway-development-consent-order-2020/schedule-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.