# The A585 Windy Harbour to Skippool Highway Development Consent Order 2020, Paragraph 16


Vibro-piling must be used as standard, with percussive piling only used if required to drive a pile to its design depth. If percussive piling is necessary soft-start procedures must be used to ensure incremental increase in pile power over a set time period until full operational power is achieved.
(a) The sort-start duration must be a period of not less than twenty minutes.
(b) Should piling cease for a period greater than ten minutes, then the soft start procedure must be repeated.

---
Source: https://www.legislation.gov.uk/uksi/2020/402/schedule/8/paragraph/16 (the official version)