# The A5/A49 Trunk Roads (Shrewsbury Bypass and Improvements) (Temporary Bridge over the River Severn at Uffington, Shrewsbury) Order 1989, Article 2


In this Order–
(i) “the new trunk road” means the new trunk road to be constructed by the Secretary of State in pursuance of the (A5) London-Holyhead Trunk Road and Slip Roads and the(A49) Newport-Shrewsbury-Whitchurch-Warrington Trunk Road (A5/A49) Shrewsbury By-Pass and Improvements) Order 1985 and the (A5) London-Holyhead Trunk Road and Slip Roads and the (A49) Newport-Shrews-bury-Whitchurch-Warrington Trunk Road (A5/A49 Shrewsbury By-Pass and Improvements) (Overley Hill) (No. 2) Order 1985;
(ii) “the River Severn Crossing” means the bridge to be constructed by the Secretary of State over the River Severn at Uffington in pursuance of the (A5) London-Holyhead Trunk Road and Slip Roads and the (A49) Newport-Shrews-bury-Whitchurch-Warrington Trunk Road (A5/A49 Shrewsbury By-Pass and Improvements) Order 1985.

---
Source: https://www.legislation.gov.uk/uksi/1989/2315/article/2 (the official version)
Page: https://openlegislation.uk/a5a49-trunk-roads-shrewsbury-bypass-and-improvements-temporary-bridge-over-the-river-severn-at-uffington-shrewsbury-order-1989/article-2
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.