From
a point on the north bank of the River Severn approximately 259m (283 yds) north east of the north corner of Ordnance Parcel 0026 and approximately 89m (97 yds) south west of the west corner of Ordnance Parcel 6879.
To
a point on the south bank of the River Severn approximately 272m (297 yds) east of the north corner of Ordnance Parcel 0026 and approximately 133m (145 yds) south of the west corner of Ordnance Parcel 6879.
Headroom
not less than 4.0m (13.1 feet) above normal river retention level to be maintained for a distance of 20.0m (21.9 yds) each side of the centre-line of the waterway.