Article 2
So much of the heavy black line on the deposited plan which indicates the centre line of the new trunk road as relates to the length of that road which lies between point ‘A’ on that plan and a point on that road 800 metres east of Coniston Bridge (marked ‘B’ on the further plan) shall be disregarded and in this article “the deposited plan” has the meaning given in the principal Order.