{
  "url": "https://openlegislation.uk/a66-northern-trans-pennine-development-consent-amendment-order-2026/article-11",
  "json_url": "https://openlegislation.uk/a66-northern-trans-pennine-development-consent-amendment-order-2026/article-11.json",
  "legislation": "uksi/2026/422",
  "legislation_title": "The A66 Northern Trans-Pennine Development Consent (Amendment) Order 2026",
  "legislation_url": "https://openlegislation.uk/a66-northern-trans-pennine-development-consent-amendment-order-2026",
  "path": "article/11",
  "kind": "article",
  "number": "11",
  "heading": "Amendment to Schedule 2 (permanent stopping up of highways and private means of access and provision of new highways and private means of access)",
  "text": "In the table in Part 3 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheets 2 and 3—\n(a) in row 1—\n(i) in column (2), for the heading “Reference q; and Reference r”, omit “; and Reference r”;\n(ii) in column (4), for the entry headed “Reference 23” substitute—\n“\n(1)\n(2)\n(3)\n(4)\nReferences 24 and 26\nTo be substituted by—\nReference 24: a new private means of access (including a right of vehicular access) providing access to the new footpath (Reference C); to land lying to the north of the new A66; and to maintenance strips on the north and south sides of the new A66; and crossing the new A66 (via a bridge) to connect the new private means of access (Reference 26) (as shown on sheet 2 and sheet 3 of the rights of way and access plans for scheme 0405); and\nReference 26: a new private means of access (including a right of vehicular access) from the edge of Ashton Lea field in a generally north-easterly direction for a distance of 93 metres and joining onto another new private means of access (Reference 24) at Point S and with a right of vehicular access over new footpath (Reference C) (as shown on sheet 2 of the rights of way and access plans for scheme 0405).\n”\n(b) in row 2 in column (2), with the entry headed “Reference s”, for the entries in columns (3) and (4)” substitute—\n“\n(1)\n(2)\n(3)\n(4)\nA length of Green Lane Track from a point 215 metres to the north of the junction of Green Lane Track with Footpath 336/011 in a north-easterly direction for a distance of 401 metres.\nTo be substituted by—\nA new private means of access (Reference 24) from the edge of Ashton Lea field in a generally north-easterly direction for a distance of 494 metres and joining onto another new private means of access (Reference 26) at Point S, and with a right of vehicular access over new footpath (Reference C) from a point 162 metres to the west of Point U, continuing in a generally easterly direction to Point T and continuing from Point T to the junction of the new footpath with the existing Footpath 336/013 a total distance of 494 metres (as shown on sheets 2 and 3 of the rights of way and access plans for scheme 0405).\n”",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2026/422/article/11",
    "retrieved_at": "2026-10-28T21:02:36.521526+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}