Article 4 Amendment to Schedule 1 (authorised development)
In Part 1 of Schedule 1 (authorised development), after paragraph (d) Work No. 0102-1D, insert—
“(e)Work No. 0102-1D-A — as shown on sheet 2 of the works plans for scheme 0102 and being the construction of additional carriageway and improvements to sections of the existing A66, to include—
(i)the improvement of the existing A66 eastbound and westbound dual carriageway to the east of the new Kemplay Bank Junction; and
(ii)the construction of new private means of access to attenuation pond as shown on sheet 2 of the rights of way and access plans for scheme 0102;”.
Renumber what was paragraph (e) as paragraph (f).
In Part 2 of Schedule 1, in—
Work No. 03-9B, sub-paragraph (i), for “footpath” substitute “cycle track”;
Work No. 03-9B, sub-paragraph (i), for “Countess Pillar” substitute “former Llama Karma Kafe”; and
Work No. 03-9B, sub-paragraph (ii), after “improved A66”, insert “(including the site of the former Llama Karma Kafe)”.
In Part 3 of Schedule 1 in—
Work No. 0405-6C, sub-paragraph (iii), after “lane;” insert “and”;
Work No. 0405-6C, omit sub-paragraph (iv); and
Work No. 0405-9, paragraph (a), for “existing Footpath 336/011” substitute “Green Land Track”.