OpenLegislation

Article 8 Amendment to Schedule 2 (permanent stopping up of highways and private means of access and provision of new highways and private means of access)

Original text. Later amendments are not shown.

In the table in Part 1 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights and way and access plans - sheets 2 and 3, in row 1 in column (2) with the entry headed “Footpath 336/017”—

(a)

in column (3) for “405 metre” substitute “398 metre” and for “sheet 1” substitute “sheet 2”; and

(b)

in column (4) in the entry headed “Reference C”—

(i)

for “90 metres south-east” substitute “2 metres north”; and

(ii)

for “the point where it connects with existing Footpath 366/013” substitute “Point S then turning northwards from Point S for a length of 162 metres, then branching in a westerly direction to join Footpath 336/017 and in an easterly direction to join Footpath 336/013”.