# The A66 Northern Trans-Pennine Development Consent (Amendment) Order 2026, Article 9: Amendment to Schedule 2 (permanent stopping up of highways and private means of access and provision of new highways and private means of access)


In the table in Part 1 of Schedule 2 that relates to Scheme 0405 (Temple Sowerby to Appleby) in the section headed Scheme 0405 – The rights of way and access plans – sheets 4 and 5—
(a) in row 1 in column (2) with the entry headed “Footpath 317/009 and Footpath 341/017”, in column (4) in the entry headed “To be substituted by References E and C* (part)”, in the section of that entry headed “Reference E”—
(i) for “a point 69 metres to the north-east of the existing junction of Footpath 341/017 with Roman Road,” substitute “Point M”; and
(ii) for “135 metres” substitute “105 metres”;
(b) in row 3 in column (2) with the entry headed “Long Marton (Road)”, in column (3)—
(i) in the first paragraph, for “93 metres” substitute “34 metres” and for “136 metres” substitute “191 metres”; and
(ii) in the second paragraph, for “870 metres” substitute “915 metres” and for “125 metres” substitute “130 metres”; and
(c) in row 6, in column (4) in the entry headed “Reference H*”, for “1.2 km.” substitute “1.1 km.”.

---
Source: https://www.legislation.gov.uk/uksi/2026/422/article/9 (the official version)
Page: https://openlegislation.uk/a66-northern-trans-pennine-development-consent-amendment-order-2026/article-9
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

